MSRA For DICV - Fixing of Shutter

This document provides a method statement and risk assessment for work removing and refixing a rolling shutter near an end of line paint booth at a truck plant from March 18-17, 2022. It outlines 6 activities including site preparation, erecting scaffolding, fixing brackets and cages, installing motors, inserting shutter parts, and fixing guide channels. Potential hazards are identified for each activity such as falling, hitting objects, and infections. Recommended precautions to reduce risk are provided such as using proper PPE, barricades, safety equipment, and trained workers. The overall goal is to complete the work safely with low risk.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

MSRA For DICV - Fixing of Shutter

This document provides a method statement and risk assessment for work removing and refixing a rolling shutter near an end of line paint booth at a truck plant from March 18-17, 2022. It outlines 6 activities including site preparation, erecting scaffolding, fixing brackets and cages, installing motors, inserting shutter parts, and fixing guide channels. Potential hazards are identified for each activity such as falling, hitting objects, and infections. Recommended precautions to reduce risk are provided such as using proper PPE, barricades, safety equipment, and trained workers. The overall goal is to complete the work safely with low risk.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Method Statement & Risk Assessment

MS & RA no: Location : TRUCK PLANT END OF LINE NEAR EOL PAINT BOOTH Time period :18.03.2022 TO 17.03.2022

Work done by :(Department / contractor):METEC CONSTRUCTION Activity Description : Rolling shutter removed & refixing work.

Equipment / Tool
S.N. Activity Sequence Picture / Drawing Manpower detail Hazard description Likelihood Severity Risk level Precautionary measures Likelihood Severity Risk level Remarks
detail

1. Wear nose mask all time and ensure face shield


while working nearby with other people.
2. Social distancing to be maintain by limiting four
person in one zone at different places,
Manpower engaged - All Applicable PPE Biological Hazard 3. Avoid gathering of workers during work.
1 COVID- 19 4 5 high 4. Frequient hand wash using sanitizer/soap oil. facility 1 4 low
all Infection spread shall be provoided at Fabrication yard, Container
location and working location.
5. Monitor body temperature before gate entry
6. Ensure Only 8 labours entering DICV as per Crisis
management team decleared head count.

1.Trained manpower will be engaged for work


Hand tools and
3 Site preparation with baricading Manpower engaged - manpower, Cut injury, hiting hazards 2 3 low 2.helmet,hand gloves,safety 1 1 low
6Nos portable drill shoes and safety jacket will be worn by workers
m/c,cutting m/c
3.100% supervision

shifting of scafolding material from contractor Manpower engaged - alumunium


1 Hitting with pedestraians.Hitting of objects. 2 2 Medium Tightnes of scafollding material in trolley using of rope. 1 2 Low
yard. 4 nos. scafolding.

Trained man power will be engage of this work. Using


Manpower engaged -
2 Errection scafolding Rubber hammr, Falling of person, falling of material. 4 2 Medium Double latched safety belt. Using of safety helmet. 1 2 low
4nos.

spanner set, cutting


Manpower engaged - plier, screw driver
3 Fixing of Bracket Plate and Cage shaft Falling of person, falling of material.
4 nos. set, welding
machine.

cuttig plier,screw
Manpower engaged - Hiting of objects, scratches of hand,hitting of
4 Fixing motor driver set,spanner 2 3 Medium using cotton gloves, barrication of work area. 1 3 low
2 nos. person.
set.

spanner set, cutting


Manpower engaged -
5 Inserting Shutter laths and shutter bottom plier, screw driver Hitting of objects, scratches of hand, 2 3 Medium using gloves, barrication of work area. 1 3 low
4 nos.
set.

trained man power will be engage of this work. Using


Manpower engaged -
6 Fixing of guide channel Welding Machine Hitting with pedestraians. 2 2 Medium Double latched safety belt. Using of safety helmet. 1 2 Low
4 nos.

Manpower engaged - 2 alumunium


7 Fixing of Hood cover Nos scafolding. Falling of person, falling of material.

Dismandtling Scaffolding and shifting to


8
Contractor yard

Hand tools, Gloves,


Manpower engaged - 2 1. Dust inhalation. 2. Nose Irritation. 3. Slip & Trip 1.Basic necessary PPE used while doing 5s. 2. Materials
9 5s Work area N/A Safety helment, 2 2 Medium Stacking.
Nos HZ.
Trolly

Method statement approved:

Risk assessment approved: Prepared by : (Contractor & Responsible person) Reviewed by : (DICV responsible person) Safety department

Additional if any:

In case of any emergency please do contact : 044 49694100 / 4101 / 9840640494

365.CF.D.56 (R1) 02/16


S - Severity of injury or illness Critical Major Moderate Minor Insignificant
Consequence Rating Frequent High High High Medium Low
Insignificant: No treatment requirement 1 Likely High High Medium Medium Low
Minor: Minor injury requiring first-aid 2 Occasional High Medium Medium Medium Low
Moderate: Injury requiring medical treatment
3 Remote Medium Medium Medium Low Low
or lost time

Major: Serious injury requiring specialist


4 Improbable Low Low Low Low Low
medical treatment or hospitalization

Critical: Death or permanent disability or


5
multiple serious injuries

O - Likelihood of Occurrence or exposure

Probability of Occurrence Rating Hierarchy of controls

Improbable: Very unlikely or exposure may modify a design to eliminate the hazard (e.g. introduce mechanical lifting
1 Elimination
not happen devices to eliminate manual handling);

Remote: Not likely to occur (Yearly substitute a less hazardous material or reduce the system energy (e.g. lower
2 Substitution
Occurrence) force, amperage, pressure, temperature etc);

Occasional: Occasional occurrence (Monthly Engineering


3 install ventilation systems, machine guarding, interlocks, sound enclosures etc;
Occurrence) Controls

Signage/
warnings safety signs, hazardous area markings, glow signs, markings for pedestrian
walkways, warning sirens/lights, alarms, safety procedures, equipment
Likely: Likely to occur (weekly occurrence) 4 and/or inspection, access controls, safe systems of working, tagging and work permits
administrative etc.;
controls
Personal
Frequent: Almost certain to occur (repeated or safety glasses, hearing protection, face shields, safety harness, respirators and
5 protective
frequent occurrence) gloves.