EST Micro-Project
EST Micro-Project
PART A
Micro Project Report on
Group No :-
Roll No :-
1
Part-A (plan)
Brief Introduction :
2
1.0 Aims/benefits of the micro-project:-
Benefits :-
3
3.0 Project Methodology:-
First of we collected the information which is
required for our micro-project from internet facilities,
references books and our subject teacher. We used
Google and Wikipedia facilities for collecting necessary
information. We searched information about “PUC
CENTER”.
4
4. Collecting and formatting of 1)
data collected by team
members.
5. Final verification done by 1)
subject teachers and guide
how to prepare charts with
necessary information related
with topic.
6. Making report with all basic 1)
information related with
topics.
5
6.0 Name of Team Members
********
6
Annexure-2
1.0 Rationale:-
7
Benefits :-
8
4.0 LITERATURE REVIEW :-
Brief Introduction :
Pollution Under Control (PUC) Certificate
Earlier, the PUC norms were not enforced or were rarely enforced. The
Indian Government has said that it will be strictly enforcing the PUC
norms now.
9
What is PUC Certificate?
10
Validity and Cost:
When you purchase a new car, a PUC certificate is provided for it and
the validity of this certificate is 1 year. Following that your car would
need to undergo the PUC test at regular intervals and a new certificate
will be issued each time.
If cars exhibit higher levels of emission than the prescribed limits, the
registration number of the vehicle will be informed to the RTO, Deputy
RTO or Assistant RTO by the testing centre within one day.
The cost of the PUC test is quite minimal. It varies from Rs. 60 to Rs. 100,
based on the vehicle that is being tested and its fuel type.
11
PUC Test Procedure :-
In the case of diesel vehicles, the accelerator is fully pressed and the
readings of pollution levels are observed. This is repeated five times
and the average constitutes the final reading.
For petrol vehicles, the car is kept idling without pressing the
accelerator. Only one reading is taken and this constitutes the final
reading.
12
Importance of PUC Certificate:
You can open a PUC center in India with the following requirements :
13
➢ When an individual or a firm wants to establish a PUC center, the
minimum area required is 200 sq. ft. Additionally, there should be
space for parking so that the traffic jams do not happen as traffic
causes inconvenience to the public.
14
Procedure for opening a PUC center
➢ You should apply at the nearest RTO division from your address
that is on your identity proof.
➢ The fees for applying depends on the state in which you are
applying.
15
Fees for setting up a PUC center
The fee varies from state to state. In the Delhi NCR region, the
application fee is Rs. 5,000. The license has to be renewed every year.
Annual license renewal is charged, which costs Rs. 5,000. A PUC center
can recover the application fee in a matter of days.
16
➢ Registration number of the vehicle.
➢ The serial number of the PUCC.
➢ The date on which the emission test was done.
➢ PUC test validity date.
➢ Emission test reading of the vehicle.
Air pollution and its effects on the environment change the earth’s
climate and high levels of pollution can have a devastating impact on
the global environment. As a responsible individual, caring for the
environment by testing your vehicle for pollution and ensuring that
they are under the norms should be your priority. Every time you
17
renew the PUC Certificate, you ensure that your car or bike is emitting
pollution levels within the stipulated norms.
You have to renew the PUCC every 6 months and this lets you know the
pollution levels of the vehicle. If the levels are higher, you can get it
checked with the mechanic before the issue becomes a larger problem.
This also helps you maintain the condition of the vehicle by servicing it
at regular intervals.
18
Mandatory Documentation For Motor Vehicle Insurance
During the car or bike insurance renewal, the PUCC is one of the
mandatory documents to confirm and approve a renewal for your
vehicle. The IRDAI has made it compulsory for insurance companies to
renew the vehicle insurance upon producing the emission certificate.
19
5.0 ACTUAL METHODOLOGY FOLLOWED :-
3. - -
INTERNET Google, tutorials point
4.
SOFTWARE Microsoft word - -
20
7.0 Outputs of the Micro-Project
1) Presentation Skill
2) Communication Skill
3) Logic Development Skill
4) Time Management Skills
21
Name of Team Members
**********
22