Bucket Elevator
Bucket Elevator
中 华 人 民 共 和 国
THE PEOPLE ’ S REPUBLIC OF CHINA
芜湖市 爱 德 运 输 机 械有限 公 司
Wuhu Ader Conveyance Machinery Co., Ltd
电话(Tel): 0553-5682708 传真(Fax): 0553-5687666
Contents
Ⅱ、Technical Specifications
Ⅳ、Struictural Components
Ⅴ、Installation Instruction
Ⅵ、Test Running
Ⅱ、Technical Specifications
For technical specifications for elevators of NE series table 1
Model Conveying Volume Maximum Maximum Lumpiness of objects(mm)
Of Capacity of Elevating Allowable percentage(%)
Elevator (m3/h) Bucket Height(m) 10 25 50 75 100
NE15 15 2.5 45 65 50 50 30 25
NE30 35 7.8 45 90 75 40 47 40
NE50 60 14.7 55 90 75 58 47 40
NE100 110 35 55 130 105 58 65 55
NE150 170 52.2 55 130 105 80 65 55
NE200 220 84.6 50 170 135 80 85 70
NE300 320 127.5 50 170 135 100 85 70
NE400 400 182.5 45 205 165 125 105 90
NE500 500 209.5 45 240 190 145 120 100
NE600 600 330.2 40 240 190 145 120 100
NE800 800 501.8 40 275 220 165 135 110
Ⅴ、Installation Instruction
A plate chain elevating conveyor of NE series is vertically erected,and
all of its weight is to be supported by the foundation, which therefore should
be inspected before installation begins.
The elevator is delivered to the user in separated components, which can
be assembled by the user by following the procedure below:
1、 Set anchor bolts according to the drawings,fix the lower device on the
base,and then adjust and align the base level(with flange face upward).
2、 Set up middle shells one by one upon the lower device according to
requirement,(for models from NE50 to NE800,one middle shell with tracks is
installed after every three standard sections).Flange connecting junctures
of the middle shells can be padded with rubber asbestos pads. When
installing middle shells with tracks,be alert to the width of the track
passage inside the shells.The narrower size indicates the passage for the
lifting side traction chain,while the wider size signals the passage for
the return side traction chain.
3、 Install the upper device after middle shells are installed and
calibrated.Usually,support devices are needed for the middle and upper
sections.The support should be firmly fixed to a nearby building in such a
way that the elevator can be free to extend or retract vertically.
4、 Install the driving unit after the upper device is installed.First connect
the platform in two pieces with the upper shell.Fix it with struts. Weld
the inspection rack and tailings onto the platform. Then install the drive
device,chain drive and sprocket shield. After the drive device in adjusted
and leveled, weld the base of the drive device firmly with the platform.
5、 Install the working parts,First set the tail shaft to the highest position
of the running range.Then at the inspection door of the lower section,draw
in the chain-bucket series that ate assembled in order of grade and
segment.Hang them up along the feeding side from under the sprocket of the
tail shaft until the assembly work is completed.
6、 Finally,install right and left halves of the shield, and set electric
circuit and safety protection device.
The eldvator installed must satisfy the following basic requirements;
1、 The foundation of the elevator must be firm and stable,all telative
positions should be correct in order to ensure that the bearing surface of
the lower device is kept at level position. Shell connecting flanges must
be tidy.No obvious displacement is allowed.The central line of the
equipment as a whole should be as close as possible to the same plumb-
line.The cumulative deviation of overall height should not exceed the value
prescribed in Table3(as shown in Drawing2)
2、 The parallelism depth of the basic shaft to the horizontal plane is
0.3%.The basic shaft and the tail shaft should be parallel to each
other,and the relative position of the upper and lower sprockets should be
aligned.The degree of malposition between the upper and lower sprockets of
the single row chain should not exceed the value prescribed in Table 4(as
shown in Drawing3),and in the case of the lower sprocket of the duplex
chains,the measured malposition on the lifting side should not exceed the
measurement given in Table 5(as shown in Drawing).
3、 The installation should let the tightening device have enough adjusting
range.After traction has been properly adjusted, The chain should account
for no less than 50% of fthe whole adjusting range.The chain should not be
towed too tight.NO apparent increased resistance should be felt in chain
when it is being turned manual.
4、 In case of duplex chains,the length error of the two series of chains
should be as little as possible.
5、 When all the above-mentioned requirements have been satisfied,retighten all
the blots,clear fragmental objects out of the elevator,and refill necessary
lubricating oil into all the oiling points.Now you are ready to start no-
load test run.
Ⅵ、Test Running
The elevator should undergo both no-load and trial run before it is put
into regular operation.
Without Loading Test Running
1、 Before the motor starts,check for moving direction.Makesure that it is
correctly wired without loading power should not exceed 30% of the rated
power.
2、 Observe the working of the bucket hauling chain and sprockets.Make sure
that moving parts do not bump or get seized by the fixed ones,that the
duplex chain series are functioning concurrently,and that no bucket skews.
3、 Check all the bearings for the temperature rise, which should not be more
than 60℃ in two hours of operation.Make sure that all the lubricating and
oiling points are well sealed.
4、 Check the decelerator for its functioning to make sure that here is no
abnormal sound or leakage.Check the drive chain for its tightness.For the
non direct-connnecting decelerator, make sure that the coupling is safe and
reliable.
5、 Check backslide stopping device and make sure there is no abnormal noise or
overheat phenomena.The backslide stopper should be flexible and reliable.
6、 Check all the fastening pieces to see if they are loosened,especially the
fixed bolts on buckets and chains.
7、 When without loading test running is finished with satisfaction,move on to
the stage of loading test running.