This document is a checklist of bulk materials requirements for a project between DaimlerChrysler and a customer organization. It lists several design and development verification items that need to be completed, including a design matrix, design FMEA, prototype control plan, and test results. It also includes requirements for process design and validation, such as process flow diagrams, a pre-launch control plan, and initial process studies. Key parties and dates of approval are to be documented at the bottom. The checklist aims to ensure all necessary design and production validation steps are addressed for the project.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
407 views
Bulk Materials Requirements Checklist
This document is a checklist of bulk materials requirements for a project between DaimlerChrysler and a customer organization. It lists several design and development verification items that need to be completed, including a design matrix, design FMEA, prototype control plan, and test results. It also includes requirements for process design and validation, such as process flow diagrams, a pre-launch control plan, and initial process studies. Key parties and dates of approval are to be documented at the bottom. The checklist aims to ensure all necessary design and production validation steps are addressed for the project.