0% found this document useful (0 votes)
90 views3 pages

Electrical Load-Phase-I

The document provides an electrical load calculation for the phases of an old age home development. It lists the various components in the development including residential towers, staff quarters, central blocks, and common areas. For each component it specifies the number of units, expected load per unit, and total load. The total connected load is calculated to be 1503 KW. Based on this it recommends a 1000 KVA transformer and one 750 KVA and 380 KVA diesel generator sets.

Uploaded by

Mohd Mansir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views3 pages

Electrical Load-Phase-I

The document provides an electrical load calculation for the phases of an old age home development. It lists the various components in the development including residential towers, staff quarters, central blocks, and common areas. For each component it specifies the number of units, expected load per unit, and total load. The total connected load is calculated to be 1503 KW. Based on this it recommends a 1000 KVA transformer and one 750 KVA and 380 KVA diesel generator sets.

Uploaded by

Mohd Mansir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

ELECTRICAL LOAD CALCULATIONS - OLD AGE HOME (PHASE-I)

DS GROUP - GREATER NOIDA, UP

S.no Description No. of unit Load per Unit Total Load

TOWER A (G+3)
1 BHK - Lighting & Small Power
42 units @ 0.9 KW = 38 KW
1 (61 sq M @ 15 W/sqM = 0.92 KW)
1 BHK - AC Load @ 60% Diversity 42 units @ 2.3 KW = 95 KW
2 BHK - Lighting & Small Power
8 units @ 1.3 KW = 11 KW
2 (89 sq M @ 15 W/sqM = 1.34 KW)
2 BHK - AC Load @ 60% Diversity 8 units @ 3.4 KW = 27 KW
2 BHK (Club) - Lighting & Small Power
5 units @ 1.7 KW = 8 KW
3 (110 sq M @ 15 W/sqM = 1.65 KW)

2 BHK (Club) - AC Load @ 60% Diversity 5 units @ 4.5 KW = 23 KW

Studio - Lighting & Small Power


31 units @ 0.8 KW = 23 KW
4 (50 sq M @ 15 W/sqM = 0.75 KW)
Studio - AC Load @ 60% Diversity 31 units @ 2.3 KW = 70 KW
Semi Paid - Lighting & Small Power
12 units @ 1.6 KW = 19 KW
5 (31 sq M @ 50 W/sqM = 1.55 KW)
Semi Paid - AC Load 12 units @ 1.9 KW = 23 KW

EWS Block (G+3)


Small Room (2 Occupants)
6 12 units @ 1.5 KW = 18 KW
(30 sq M @ 50 W/sqM = 1.50 KW)
Big Room (4 Occupants)
7 12 units @ 1.8 KW = 21 KW
(35 sq M @ 50 W/sqM = 1.75 KW)

Staff Quarters (G+3)


Small Room (2 Occupants)
8 12 units @ 1.5 KW = 18 KW
(30 sq M @ 50 W/sqM = 1.50 KW)
Big Room (4 Occupants)
9 12 units @ 1.8 KW = 21 KW
(35 sq M @ 50 W/sqM = 1.75 KW)

Central Block (B+G+2)


Centralized Air Conditioning (@ 75%
10 = 375 KW
Diversity)
11 Basement Ventilation = 80 KW

Load Calc_Old Age Home Page 1


ELECTRICAL LOAD CALCULATIONS - OLD AGE HOME (PHASE-I)

DS GROUP - GREATER NOIDA, UP

S.no Description No. of unit Load per Unit Total Load

Lighting & Small Power


12 = 29 KW
(7148 sq M @ 4 W/sqM = 28.59 KW)
Basement Lighting
13 = 7 KW
(6561 sq M @ 1 W/sqM = 6.56 KW)

14 Elevators (13 Passenger) 1.0 mps 4 nos @ 7.5 KW = 30 KW

15 BOH (Basement) 1 nos @ 55.0 KW = 55 KW

16 Kitchen (Ground Floor) 1 nos @ 55.0 KW = 55 KW

17 Kitchen (Second Floor) 1 nos @ 53.0 KW = 53 KW

Naturopathy Block
18 As per Annex - I @ 75% Overall Diversity = 235 KW

COMMON SERVICES - TOWERS


TOWER A (G+3)
19 Elevators (13 Passenger) 1.0 mps 5 nos @ 7.5 KW = 38 KW

20 Common Lights 1 towers @ 5 KW = 5 KW

Activity Hall
4 units @ 1.0 KW = 4 KW
21 (67 sq M @ 15 W/sqM = 1.01 KW)
Activity Hall - AC Load 4 units @ 7.5 KW = 30 KW

EWS Block (G+3)


22 Elevators (13 Passenger) 1.0 mps 1 nos @ 7.5 KW = 7.5 KW

23 Common Lights 1 towers @ 5 KW = 5 KW

Staff Quarters (G+3)


24 Elevators (13 Passenger) 1.0 mps 1 nos @ 7.5 KW = 7.5 KW

25 Common Lights 1 towers @ 5 KW = 5 KW

COMMON SERVICES - General

26 STP = 25 KW

27 External / Gate / Landscape lighting 1 set @ 10 KW = 10 KW


Fire pumps (only jockey pumps have been
28 1 set @ 10 KW = 10 KW
considered)

29 Water Supply / Tube wells 1 nos @ 25 KW = 25 KW

Load Calc_Old Age Home Page 2


ELECTRICAL LOAD CALCULATIONS - OLD AGE HOME (PHASE-I)

DS GROUP - GREATER NOIDA, UP

S.no Description No. of unit Load per Unit Total Load

Total Connected Load = 1503 KW


TRANSFORMER SELECTION
Total Demand Load 50 % => 752 KW
By taking Power factor 0.90 => 840 KVA
Recommended Transformers (80% loading) = 1 nos. 1000 KVA, 11/0.433 kV, Compact
Substations
DG SETS SELECTION
Total Demand Load => 752 kW
By taking Power factor 0.80 => 940 KVA

Recommended DG Sets (90% loading) = 1 nos. 750 KVA & 1 nos. 380 KVA

Load Calc_Old Age Home Page 3

You might also like