Order Qty Vs Dispatch Plan - 04 11 20

The document contains a dispatch plan for November with 131 part numbers. It lists the order quantity, planned dispatch quantity for November, and project/reason for delays if applicable. A status update on 11/30/2020 provides the dispatched quantity and difference from the plan for each part number. The total order quantity across all part numbers is approximately 723,389 pieces with over 270,000 for multi machine orders and 88,000 for sliding head orders.

Uploaded by

NPD1 JAKAP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views13 pages

Order Qty Vs Dispatch Plan - 04 11 20

The document contains a dispatch plan for November with 131 part numbers. It lists the order quantity, planned dispatch quantity for November, and project/reason for delays if applicable. A status update on 11/30/2020 provides the dispatched quantity and difference from the plan for each part number. The total order quantity across all part numbers is approximately 723,389 pieces with over 270,000 for multi machine orders and 88,000 for sliding head orders.

Uploaded by

NPD1 JAKAP
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

PLAN

Sr. No. Part No's Order Qty. Dispatch Plan


Nov
91 1460X6 75,582 43,600
92 1460X8 27,867 12,000
94 10006B-406 15,936 4,000
95 10004B-604 5,059 3,000
96 10008B-608 4,472 4,400
97 10004B-104 3,480 -
98 10004B-102 3,104 -
99 10506B-106 2,603 -
100 10008B-106 2,459 -
101 10006B-104 2,030 -
102 103-05378 1,886 1,200
103 10506B-104 1,634 1,600
104 10006B-Y06 1,608 1,560
105 10004B-Y04 1,482 -
106 103-23744 1,200 1,200
107 1391X8X8 745 750
108 B1380X8 654 -
109 1072X6X2 600 600
110 10006B-606 537 500
111 10006B-C04 504 450
112 10010B-108 496 400
113 10005B-A05 447 -
114 10006B-102 385 375
115 10005B-102 352 450
116 103-23738 350 -
117 10008B-Y08 345 350
118 10004B-B05 333 300
119 500-01294 303 -
120 10006B-B06 301 300
121 10006B-A05 290 300
122 10004B-B04 243 300
123 10004B-B03 196 300
124 10006B-A06 146 -
125 103-23732 120 120
126 39X12 119 120
127 10504B-104 99 200
128 116-24208 93 90
129 117-20308 79 60
130 10004B-A04 25 240
131 15-2288-3 19000 0
132 29-7824-005 3500 0
133 15-2288-2 2500 0
134 15-2288 1000 1000
135 29-7823-006 1452 252
136 110295-002 1300 0
137 49-10425 1040 0
138 29-7652-008 715 715
139 29-7652-007 550 0
140 29-7823-110 500 0
141 29-7823-005 563 63
142 29-7652-015 700 0
143 29-7824-110 250 0
144 29-7824-006 240 90
145 326266 150000 50000
146 1A0518 15544 5544
147 1A2230 24000 0
148 4959BS 13600 5600
149 TER60 50000 30000
150 TERS60 2000 0
151 TP60 40000 0
152 SIR100 12800 4800
153 TIRS60 2000 2000
154 TP30 48000 16000
155 TP30P 64000 0
156 TP60P 60000 20000
157 TERSIR100 29000 7000
158 TER100 16000 16000
159 TIRS60P 2000 2000
160 1A5640-0862 3000 0
161 SIR400 800 800
162 TER30 36000 36000
163 3220X4X2 70000 12000
164 3152X4 50000 35000
165 611X2 25000
166 3152X6 12000
167 101-14124 45000 13040
168 60X2 20000
169 1360X4 9000
170 3200X6X4 1152 1152
171 117-10304 12000
172 601X2 2000 2000
173 60X10 4800 3600
174 117-30008 8000
175 60X8 13000 13000
176 141-14810 1500
177 100X3 5600 5600
178 3152X2 14000 14000
179 3400X4W 2500
180 1460X10 8000 4000
181 601X6 3000 3000
182 48X8 7000 5000
183 402X5 2000
184 611X4 6800 6800
185 B62X8 3400
186 611X6 16000 16000
187 60X5 22000 22000
188 3400X2 50000 20000
04.11.20
Project Project Reason
Owner
Sleeve RAVI
Sleeve RAVI
FHY-130 RAVI Delay because manpower shortage in index machine
FHY-130 RAVI
FHY-130 RAVI
Socketless RAVI
Socketless RAVI
FHY-130 RAVI
Socketless RAVI
Socketless RAVI
LVP RAVI
FHY-130 RAVI
Socketless RAVI
Socketless RAVI
LVP RAVI
LVP RAVI
LVP RAVI
LVP RAVI
FHY-130 RAVI
Socketless RAVI
Socketless RAVI
Socketless RAVI
Socketless RAVI
Socketless RAVI
LVP RAVI
Socketless RAVI
Socketless RAVI
LVP RAVI
Socketless RAVI
Socketless RAVI
Socketless RAVI
Socketless RAVI
Socketless RAVI
LVP RAVI
LVP RAVI
FHY-130 RAVI
LVP RAVI
LVP RAVI
Socketless RAVI Hold by Ashishbhai
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI
TOJ RAVI As per chetanbhai's instruction, Material put on hold because m
DEN RAVI
JUAREZ RAVI Delay in CNC, Manpower shortage
JUAREZ RAVI
JUAREZ RAVI Delay : (1) 7 days delay due to material reject, (1) Also delay
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI Delay in Threading, Manpower absentism
JUAREZ RAVI
JUAREZ RAVI
JUAREZ RAVI Reject In CNC
JUAREZ RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI Hold by Ashishbhai
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI Hold by Ashishbhai
ID4005 RAVI
ID4005 RAVI Hold by Ashishbhai
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI
ID4005 RAVI Hold by Ashishbhai
Dispatched
Dispatch QTY - NOV

45600
18000
0
3400
4410
2375
0
0
0
0
1200
2550
1560
0
1600
750
60
600
750
450
400
0
375
450
25
650
450
0
600
300
600
300
0
150
150
200
150
60
0
0
0
0
1000
252
0
0
715
0
0
63
0
0
0
50000
3388
0
0
30000
0
0
4800
2000
16000
16000
24000
7000
12800
2000
3600
0
36000
14000
45600
2400
900
13440
0
0
1152
0
6000
4200
0
3000
0
5600
9000
0
0
10000
5000
0
6800
250
16000
22000
5670
11/30/2020
(2,000)
(6,000)
4,000
(400)
(10)
(2,375)
-
-
-
-
-
(950)
-
-
(400)
-
(60)
-
(250)
-
-
-
-
-
(25)
(300)
(150)
-
(300)
-
(300)
-
-
(30)
(30)
-
(60)
-
240
-
-
-
-
-
-
-
-
-
-
-
-
-
90
-
2,156
-
5,600
-
-
-
-
-
-
(16,000)
(4,000)
-
3,200
-
(3,600)
800
-
(2,000)
(10,600)
(2,400)
(900)
(400)
-
-
-
-
(4,000)
(600)
-
10,000
-
-
5,000
-
4,000
(7,000)
-
-
-
(250)
-
-
14,330
Total Order qty 723389
CNC Order qty 272875
Multi Order Qty 270481
Sliding Head order qty 88000
Supplier 90695