Bridge Loading Calculation
Bridge Loading Calculation
Pier 1
Area (m²) Length (m) nos Volume (m³)
Cross head 37.497 1.700 1 63.745
Diaphragm 3.464 22.450 1 77.767
Column 1.540 11.000 4 67.760
Pile Cap 7.200 22.450 1 161.640
Total = 370.912 m³
Pier 2
Area (m²) Length (m) nos Volume (m³)
Cross head 37.497 1.700 1 63.745
diaphragm 3.464 22.450 1 77.767
Column 1.540 11.000 4 67.760
Pile Cap 7.200 22.450 1 161.640
Total = 370.912 m³
BRIDGE LOADING CALCULATION
ABUT A
Load (kN)
Parapet at abut. - 3.3m 27.975
Parapet - 40m 373.000
Deck Slab -40m 2020.500
Asphaltic Conc.- 40m 1032.700
T-Beam -40m 4165.453
Abut. Wall 19049.835
Transition Slab 505.125
Pile Cap 0.000
Total = 27174.588
pier 1 pier 2
Load (kN) Load (kN)
Parapet - 40m 373.000 Parapet - 40m 373.000
Parapet - 40m 373.000 Parapet - 40m 373.000
Deck Slab -40m 2020.500 Deck Slab -40m 2020.500
Deck Slab -40m 2020.500 Deck Slab -40m 2020.500
Asphaltic Conc.- 40m 1032.700 Asphaltic Conc.- 40m 1032.700
Asphaltic Conc.- 40m 1032.700 Asphaltic Conc.- 40m 1032.700
T-Beam -40m 4165.453 T-Beam -40m 4165.453
T-Beam -40m 4165.453 T-Beam -40m 4165.453
Pier 1 9272.800 Pier 2 9272.800
Total = 24456.105 Total = 24456.105
ABUT B
Load (kN)
Parapet at abut. - 3.3m 27.975
Parapet - 40m 373.000
Deck Slab -40m 2020.500
Asphaltic Conc.- 40m 1032.700
T-Beam -40m 4165.453
Abut. Wall 19049.835
Transition Slab 505.125
Pile Cap 0.000
Total = 27174.588
TOTAL DL + SIDL + (HB45+HA)
NOMINAL
DL SIDL HB45 + HA VERTICAL HORIZONTAL MOMENT
(kN) (kN) (kNm)
ABUTMENT A 26141.888 1032.700 3065.09 30239.678 654.00 4578.00
PIER 1 22390.705 2065.400 4953.8 29409.905 157.00 2276.50
PIER 2 22390.705 2065.400 4953.8 29409.905 557.00 8076.50
ABUTMENT B 26141.888 1032.700 3065.09 30239.678 148.00 888.00