0% found this document useful (0 votes)
164 views3 pages

DHVBN - Building Electrical Load Norms

Guide Lines

Uploaded by

dilipgm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
164 views3 pages

DHVBN - Building Electrical Load Norms

Guide Lines

Uploaded by

dilipgm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
DAKSHIN HARYANA BWJLI VITRAN NIGAM Sales Circular No. D- 16/2017 From (CE/Commercial, DHBVN, Hisar. To All CEs/SEs/IXENs/SDOS/OP, JEs-|, Incharge Sub office, in DHBVN. Memo No. Ch-16/SE/Comml/ R-18/28/2004/F-11 Dated 12/4/2017 Subject: Approval of Electrification Plan in the colonies / Multi-storied Buildings /Group housing societies developed by HUDA / HSIIDC Private Colonizers /SEZ. Please refer to Sales Circular No. D-09/2014 dated 27.01.2014 vide which the electrical load norms for plots of Residential Sectors/Colonies developed By HUDA/Private Colonizers , Flats, Group Housing Societies, Shopping Centres (Commercial), Industrial Plots and Flats for Economic Weaker Section ( EWS) were circulated for their implementation. The proposal for revision in load norms was approved by the Board of Directors in their meeting held on 02.02.2017, with the directions to send the relevant points to State Govt. for approval . in compliance to the ‘aforesaid decision, the amendments in load norms were sent to the State Govt. for ‘approval and the same has been approved by Hon'ble CM, Haryana. Accordingly, the following electrical load norms in respect of ‘different categories shall come into force with immediate effect A) | Sectors / Colonies Developed By Huda / Private Colonizers ( Size [Category of plots [A-CLASS[B-CLASS [C-CLASS I Toad Load Load 2 Marla 6 KW 4aKW 2KW 4 Maria ho Kw. KW SRW. ‘Maria i2KW KW. oKW 3 Maria 76 KW TOKW aKW 40 Maria 20 KW 15 KW 12 KW 14 Marla 25 KW 20KW 15 KW 1 Kanal 30KW_ 20 KW 20 KW. 2 Kanal 40 KW 30 KW. 25 KW “The cilies are categorized as under for these load norms: Class A’ Gurgaon, Sonepat, Faridabad, Manesar, Panchkula, Ambala, Panipat, Kamal, Rohtak ClassB: Yamuna Nagar, Jagadhri, Sirsa, Fatehabad, Hisar, Bahadurgarh, Palwal, Rewari, Kaithal, Kurukshetra Class: Jind, Bhiwani, Namaul, Jhajjar, Narwana, Hansi and other small ities and towns being developed by = HUDAVPrivate Colonizer/Developer other than class A & 8 above. a NORMS FOR FLATS OF GROUP HOUSING SOCIETIES Sr [Flats having | Connected Load kW) No. _| covered area eax ot Abarth — | Connected Load (RW) 7] Bisrasopes0 F 2. Upto 600 4 360-800 § &— 801-1200 8 51207-1460 1 6. 1451-1650 12 - 7 [168-2000 14 3 | 2001-2400 16 3 |-240%-3000 8 10. [Above 3000 20 ©) LOADNORMS PING CENTRES (COMMERCI, [Sr.No. | Description Connected load 7 Kiosk DKWEaCh 2 [Booth ‘RW Each 3. | DSS (Double Storey Shop) [6 KW Per Floor 4. | ShowRoom'SCOISCE [2 KW Per Bay Per Floor >) LOAD NORMS FOR INDUSTRIAL PLOTS Sr No [Size of Plot | Area Sq Mi (Acros) | Load 4. [128x25 _[ 91250 30 2 [iex30 ——|480_ 0.125) © apa xa8 7 [91875 — 025) 30 4 22.5x45 7,012.50 (0.25) 60 5 a0x60 [1800 080) 75 Saran 78 [2726 00_(078) 700 7 [48x90 [4050 (100) 200 a fetx7s —— [aaa (100 200 2000.0, 300 20000 (5.0) 1000 40000 (10.0) 4000 40000 to 60000 (10.0 to| 6000 150) Dy w wy Demand factor of 0.40 for Residential Plots and 0.8 for Group Housing Societies shall be applied to arrive at loads for which the infrastructure capacity has to be developed by HUDA/ HSIIDC/ Private Colonizers/ Developers! SEZs etc. Demand factor for Shopping Centres (Commercial) shall be 0.5. In case of commercial load not covered under above categories, a load of 16KW per 100 sq mtrs. of FAR area shall be considered with demand factor of 0.6. In case of any category of consumers not covered under any of the categories covered above, the demand factor shall be taken as 0.5. ‘The demand factor for common / public utiles in the Electrification Scheme shall be taken as 0.5. ¥) Demand factor for industrial load norms shall be taken as 0.625 vi) While working out the transformation capacity of the distribution system to be developed by HUDA / HSIIDC / Private Colonizers / Developers / SEZs etc, the celing on maximum loading of the distribution transformer(s) will be 80%. The Distribution TIF of all sizes available in market can be used ‘commensurate with the load but should be ISI marked 4-star rated. vil) Connections at 33 KV voltage level will be allowed for the load above 5 MVA Up to 25 MVA wherever feasible, vill) These load norms will be revised / updated every three years in sync with Lpdation of EDC charges and will be made applicable prospectively. |x) The amount of EDC recovered by HUDA shall be transferred to Discom and, HVPNL for ereation ofthe distribution and transmission infrastructure as and when received and EDC received so far along with sites of substation will be immediately transferred to utities within one month. %) The cost sharing arrangement between power utilities and developer shall be as under.- Y For the sectors floated before 1986; Power Utlities 75%, Developer 25%. ¥ For the sector floated after 1986 and before 2008: Power utilities 25%, Developer 75%. ¥ For the sectors floated after 2008: 100% Developer. xi) HERC Duty to Supply Regulation No. HERC/ 34 /2016 stipulates that if at the time of energisation of the system, it Is noted that the concemed department /colonizer/society has not executed the complete electrification work as per the electrification plan approved by the licensee, the colonizerideveloper shall be requited to fumish the Bank Guarantee equivalent to 1.5 times of the estimated cost of the balance work to be executed as per the approved plan. The Nigam shall not release single Point connection or individual connections to the residents of such areas without taking requisite Bank Guarantee. ‘The Sales Circular No. D- 9/2014, DHBVN Planning Manual, SMI No. 5.22 & all related instructions are amended to this extent. The above instructions should be brought to the notice of all concerned for careful and meticulous compliance please. \ cee cial, vi sar

You might also like