This document provides information on a double interlock preaction sprinkler system with electric/electric release. Some key points: - The system uses a deluge valve and check valve to prevent water from entering the sprinkler piping until both detection and loss of air pressure occur. - For activation, both the detection zone and air pressure zone of the control panel must operate simultaneously due to a fire or loss of air pressure. - Installation, maintenance, inspection and testing procedures are outlined to properly set up and monitor the system. - The system is generally used to protect water sensitive areas by preventing inadvertent water discharge from the sprinkler piping until a fire is detected.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

hd127 Double Interlock Elec Elec Release - 2

This document provides information on a double interlock preaction sprinkler system with electric/electric release. Some key points: - The system uses a deluge valve and check valve to prevent water from entering the sprinkler piping until both detection and loss of air pressure occur. - For activation, both the detection zone and air pressure zone of the control panel must operate simultaneously due to a fire or loss of air pressure. - Installation, maintenance, inspection and testing procedures are outlined to properly set up and monitor the system. - The system is generally used to protect water sensitive areas by preventing inadvertent water discharge from the sprinkler piping until a fire is detected.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

DOUBLE INTERLOCK, PREACTION SYSTEM

WITH ELECTRIC/ELECTRIC RELEASE HD FIRE PROTECT


PVT. LTD.

TECHNICAL DATA
SIZE 50, 80, 100, 150 & 200 NB
DELUGE VALVE Model H3, UL Listed
CHECK VALVE Model-CH
SPRINKLER ALARM UL Listed (Optional)
RELEASE PANEL UL Listed (Optional)
WATER FLOW UL Listed
SWITCH
SOLENOID VALVE 24V DC, UL Listed
AUTOMATIC AIR Oil-less Risermount
SUPERVISOR Compressor (Optional)
AIR PRESSURE PMD-1 (Optional)
MAINTENANCE
DEVICE
MANUAL SYSTEM UL Listed, Butterfly Valve -
SHUTOFF VALVE Standard supply.
(Gate Valve - Optional)
MAXIMUM WORKING 17.5 Kg./sq.cm. (250 PSI)
PRESSURE The Releasing Panel is operated by either a fire detec-
SYSTEM END Grooved (Standard supply) tion device or manual electric pull station. In order for
CONNECTION Flanged (Optional supply) the Double Interlock Pre-action System to automat-
ically actuate, two independent events must occur.
APPROVAL UL Listed Zone 1 of the Releasing Panel must operate upon
automatic operation of the electric fire detection
DESCRIPTION initiating circuit or operation of the electric-manu-
al pull initiating circuit, and Zone 2 of the Releasing
The Double Interlock Preaction System with Electric/ Panel must operate via the Low Air Pressure Alarm
Electric Release is generally used to protect water Switch upon loss of air pressure from the sprinkler
sensitive areas such as computer rooms, storage system piping, due to operation of one or more sprin-
areas, refrigerated areas etc., to avoid water damage klers. The Double Interlock Preaction System will au-
due to inadvertent flooding of the sprinkler system tomatically actuate only when both Zone 1 and Zone
piping. 2 of the Releasing Panel have operated, energizing the
Solenoid Valve.
In normal condition, preaction system does not contain
water in the sprinkler piping. The sprinkler piping Deluge Valve H3 is diaphragm valve as described in
contains air pressure for the purpose of supervising Technical Data Sheet HD 235.
its leak tightness.
This system utilizes a Deluge Valve H3 and Riser INSTALLATION & COMMISSIONING
Check Valve model CH. The Riser Check Valve isolates The preaction system valves, panel, indicators
the Deluge Valve from the system air pressure. Riser must be installed in a readily visible and accessible
Check Valve provides an air check so that the system location. The system valves and accessory shall not be
can be automatically pressurized with a supervisory installed in an area having temperature less than
air or nitrogen pressure of 18 PSI (1.26 Bar). A su- 4oC (40oF). Heat tracing to system valve and
pervisory low pressure alarm switch can be set at accessory is not permissible. The system must be
6 PSI (0.42 Bar), on decreasing pressure, to indicate installed and operated carefully by a trained person,
whether there are any abnormal leaks in the sprinkler having good knowledge of equipment. All system piping
system piping. Loss of air pressure from the system must be flushed thoroughly before commissioning.
due to accidental leakage will not cause Deluge Valve
to open. After initial successful tests, an authorized person
must be trained to perform inspection, testing and
The releasing trim for Deluge Valve utilizes a Solenoid maintenance of the system.
Valve that is energized with cross-zone releasing cir-
cuit of release panel.

MAY, 2019 PAGE 1 OF 6 HD 127


HD FIRE PROTECT
PVT. LTD.

RECOMMENDED SEQUENCE OF d. Open the priming line so that the diaphragm


chamber reads the system water pressure. Open
INSTALLATIONS the manual release station partly to vent the air
In planning the installation, consideration must also & then close it.
be given to the disposal of relatively large quantities e. Open the upstream side of stop valve to read
of water that may be associated with draining of the the Deluge Valve Inlet water supply pressure.
system or performing flow test. The Deluge Valve is set.
1. Install the Deluge Valve on Riser in vertical f. Open the air supply line and check the
position. pressure is maintained up to 18 PSI (1.26 Bar)
2. Install the Riser Check Valve above Deluge Valve and Control Panel is kept on.
as shown in installation drawing. h. Check all the trim parts for possible leak.
3. On completion of system piping, install all the
trims as per trim drawing. Care must be taken INSPECTION AND MAINTENANCE
to ensure that Check Valves, Strainers, Valves
etc. are installed with the flow arrows in the Inspection and testing is to be carried out only by
proper direction. an authorized and trained personnel. DO NOT
TURN OFF the water supply or close any valve to
4. Connect all drain piping as shown in the drawing. make repair(s) or test the valve, without placing a
5. All unused opening on valve or trim parts must roving fire patrol in the area covered by the system.
be plugged. Also inform the local security personal and central
alarm station, so that there is no false alarm signal.
6. Connect air supply line. It is recommended to carry out physical inspection
7. Connect all electrical to control panel as per of the system at least twice a week. The inspection
wiring drawing. should verify that no damage has taken place to any
components and check for following normal condition of
8. Make sure that all the nut bolts, fittings are the system. The owner is responsbile for maintaining
screwed properly. the pre-action system.
9. Follow the valve resetting and test procedure.
NORMAL CONDITION
10. The pipe fittings and nipple must be cleaned. Use
thread sealent on male threads only. a. All main valves are open and sealed with tamper
proof seal.
11. For common drain piping a check valve to be
provided interconnecting main dran and the b. All drain valves are in closed condition.
funnel. c. No leak or drip is detected from drip valve.
12. The drain tubing to be drip funnel must be installed d. All water gauge of deluge valve, should show
with smooth bends that will restrict flow. the required pressure.
13. The drain piping must be free-flow and care must e. No leak in any trim or other piping.
be taken to direct the drain in proper area to
avoid damage due to release of system. f. Release panel is on and no abnormal indication
are seen.
14. A supervisory air or nitrogen supply is to be
installed as given in the data sheet. An air dryer, g. All testing procedure to be verified.
if specified, needs tobe installed as per authority
having jurisdiction. CAUTION
15. The electric connection through conduit is to be Procedure outlined below will result in operation of
made as per authority having jurisdiction. associated alarm. Concerned authorities to be in-
formed about the tests before conducting the tests.
RESETTING PROCEDURE
a. Close the upstream side stop valve of the Deluge
QUATERLY TEST
Valve. WATER FLOW ALARM TEST
b. Open drain valves and allow water to drain Open the sprinkler alarm gong test valve, the water
(if water flow was establish) & close drain will flow through sprinkler alarm and/or water flow
valve when water flow has ceased. switch. On satisafctory observation close the alarm
test valve.
c. Check all release devices are closed. Inspect the
release devices if system was subject to fire
condition.

MAY, 2019 PAGE 2 OF 6 HD 127


HD FIRE PROTECT
PVT. LTD.

SOLENOID VALVE TEST CAUTION


a. Close the inlet valve of deluge valve and open the The system must be inspected, tested and maintained
main drain valve. as instructed above, in addition to the requirement
of NFPA or as per requirement of authority having
b. Close the air supply valve and drain the air pressure
jurisdiction. The owner is responsible for the
through drain valve of check valve and observe low
inspection, testing and maintenance of the system
air in Pressure Switch is activated.
and devices.
c. Activate the detector (zone-1) and observe
solenoid valve is activated and water flow through
solenoid valve outlet and pressure drop at deluge
valve top chamber.
d. De-activate solenoid valve by build Air Pressure as
per requirement in Riser and de-activate initiating
zone-1 and reset then panel if required.
e. Reset the system as per resetting procedure.

AIR SUPPERVISORY LOW PRESSURE


ALARM TEST
Release air pressure gradually through valve provided
on check valve. When air pressure drops to 6 PSI
(0.42 Bar), the supervisory low pressure alarm must
be observed. Close the valve & observe that air
pressure has been established to 18 PSI (1.26 Bar),
the supervisory air pressure alarm must come to
normal condition. If required reset the release panel.

ANNUAL OPERATION TEST


Testing valve operation without causing water upply to
the deluge valve.
a. Close the main system valve controlling water
supply to the deluge valve.
b. Open the main drain valve provided on deluge inlet
side and allow water to drain. When water flow
from drain valve has stopped crack open the main
system valve and close the main drain valve partly
allowing the water pressure at inlet of
deluge valve to raise up to 1.4 Kg/Sq.Cm.(20 PSI)
and no more pressure is rising.
c. Actuate the solenoid valve from control panel as
per instruction of control panel manufacturer.
deluge valve must open and water flow must be
noticed through drip valve and through
solenoid valve. Close the main supply control valve
immediately and allow water to drain from
drain valve.
d. When water flow has stopped, reset the deluge
valve as per resetting procedure.

CAUTION
The steps b & c must be performed very quickly to
prevent water flow to riser.
NOTE: For abnormal condition of deluge valve refer
the data sheet No. HD235.

MAY, 2019 PAGE 3 OF 6 HD 127


HD FIRE PROTECT
PVT. LTD.

DOUBLE INTERLOCK PREACTION SYSTEM WITH ELECTRIC/ELECTRIC RELEASE


SCHEMATIC DIAGRAM

12

10

17

9
16

4 7 14
10 13

15

11
12 3

2 6
18
5
1

FRONT VIEW

10
8 17

16
4

12
7 15

11

15

18

14
REAR VIEW

MAY, 2019 PAGE 4 OF 6 HD 127


HD FIRE PROTECT
PVT. LTD.

DOUBLE INTERLOCK PREACTION SYSTEM WITH ELECTRIC/ELECTRIC RELEASE


PART LIST

PREACTION TRIM SIZE QUANTITY PER PREACTION TRIM


ITEM NO CODE NO DESCRIPTION SIZE/ MAKE 200 NB 150 NB 100 NB 80 NB 50 NB

BFV WAFER TYPE GEAR OPRT. 2”, HD MAKE


1 1 1 1 1 1
WITH TAMPER SWITCH * (MODEL NO.HDMW300)
2 6458 DELUGE VALVE FLANGE END 2”, HD MAKE (MODEL NO.DV-H3) - - - - 1
2 6455 DELUGE VALVE FLANGE END 3”, HD MAKE (MODEL NO.DV-H3) - - - 1 -
2 6454 DELUGE VALVE FLANGE END 4”, HD MAKE (MODEL NO.DV-H3) - - 1 - -
2 6453 DELUGE VALVE FLANGE END 6”, HD MAKE (MODEL NO.DV-H3) - 1 - - -
2 6457 DELUGE VALVE FLANGE END 8”, HD MAKE (MODEL NO.DV-H3) 1 - - - -
3 1951 EMERGENCY RELEASE STATION 1/2” HD MAKE (MODEL ERS-1) 1 1 1 1 1
4 9392 ANGLE VALVE 1-1/4” - - - 2 2
4 9394 ANGLE VALVE 2” 2 2 2 - -
5 9423 PRIMING VALVE 1/2” 1 1 1 1 1
6 RESTRICTED CHECK VALVE 1/2” 1 1 1 1 1
7 1825 ANTI RESET VALVE (ARV-1) 1/2” 1 1 1 1 1
8 3569 CHECK VALVE - FLANGE TO GROOVE 2”, HD MAKE (MODEL NO. CH) - - - - 1
8 114345 CHECK VALVE - FLANGE TO GROOVE 3”, HD MAKE (MODEL NO. CH) - - - 1 -
8 114346 CHECK VALVE - FLANGE TO GROOVE 4”, HD MAKE (MODEL NO. CH) - - 1 - -
8 114343 CHECK VALVE - FLANGE TO GROOVE 6”, HD MAKE (MODEL NO. CH) - 1 - - -
8 114347 CHECK VALVE - FLANGE TO GROOVE 8”, HD MAKE (MODEL NO. CH) 1 - - - -
9 1674 PRESSURE MAINTENANCE DEVICE* 1/2” (PMD-1) 1 1 1 1 1

10 114071 PRESSURE GAUGE 0-300 PSI, UL LISTED 3 3 3 3 3


11 1416 SPRINKLER ALARM (GONG BELL)* HD MAKE (TYPE-A) 1 1 1 1 1

12 PRESSURE SWITCH POTTER MAKE, UL LISTED 2 2 2 2 2


13 SOLENOID VALVE PARKER MAKE, UL LISTED 1 1 1 1 1
14 POTTER MAKE, UL LISTED 1 1 1 1 1
CROSS ZONE DV RELEASING PANEL *
15 TRIM FITTINGS 1 1 1 1 1
16 - - - - -
AUTOMATIC SPRINKLER **
17 - - - - -
HEAT DETECTOR/ SMOKE DETECTOR **
18 SPLASH PROOF FUNNEL 1 1 1 1 1

* OPTIONAL SUPPLLY
** NOT SUPPLLIED BY HD FIRE

NOTES:
DELUGE VALVE END CONNECTION (OPTIONAL - G X G/ F X F) F = FLANGE END
CHECK VALVE END CONNECTION (OPTIONAL - G X G/ F X G / F X F) G = GROOVE END
BUTTERFLY VALVE END CONNECTION (OPTIONAL - G X G/ WAFER TYPE / LUG TYPE)
PRESSURE GAUGE (OPTIONAL - HDP-1 / HDP-2)
OPTIONAL TRIM SUPPLY - LOOSE / SEMI ASSEMBLED)
SHAPE OF FITTINGS / VALVES MAY CHANGE.
SYSTEM PIPING, SPRINKLER, DETECTOR NOT SUPPLIED BY HD FIRE
PRIMING LINE BY OTHERS

MAY, 2019 PAGE 5 OF 6 HD 127


HD FIRE PROTECT
PVT. LTD.

ORDERING INFORMATION

X XX X X X X

Size Actuation Device Air Maintenance Control Panel Compressor* Compressor


Device Pressure
1 50 DE Double Interlock N None N None
N None L 18 PSI
Pre-action with A Included 1 1/6 HP
2 65 1 PMD-1
Electric/ Electric
3 80 Release 2 1/3 HP
2 Nitrogen Air
Maintenance 3 1/2 HP
4 100
Device 4 3/4 HP
5 150
5 1 HP
6 200
6 1-1/2 HP

*Compressor standard supply is 50 Hz., 60 Hz is optional supply.

LIMITED WARRANTY
HD FIRE PROTECT PVT. LTD. hereby referred to as HD FIRE warrants to the original purchaser of the fire protection products manufactured by HD FIRE and to any other person
to whom such equipment is transferred, that such products will be free from defect in material and workmanship under normal use and care, for two (2) years from the date of
shipment by HD FIRE. Products or Components supplied or used by HD FIRE, but manufactured by others, are warranted only to the extent of the manufacturer’s warranty.
No warranty is given for product or components which have been subject to misuse, improper installation, corrosion, unauthorized repair, alteration or un-maintained.
HD FIRE shall not be responsible for system design errors or improper installation or inaccurate or incomplete information supplied by buyer or buyer’s representatives.
HD FIRE will repair or replace defective material free of charge, which is returned to our factory, transportation charge prepaid, provided after our inspection the material is
found to have been defective at the time of initial shipment from our works. HD FIRE shall not be liable for any incidental or consequential loss, damage or expense arising directly
or indirectly from the use of the product including damages for injury to person, damages to property and penalties resulting from any products and components manufactured
by HD FIRE. HD FIRE shall not be liable for any damages or labour charges or expense in making repair or adjustment to the product. HD FIRE shall not be liable for any
damages or charges sustained in the adaptation or use of its engineering data & services. In no event shall HD Fire’s product liability exceed an amount equal to the sale price.
The foregoing warranty is exclusive and in lieu of all other warranties and representation whether expressed, implied, oral or written, including but not limited
to, any implied warranties or merchantability or fitness for a particular purpose. All such other warranties and representations are hereby cancelled.

NOTICE :
The equipment presented in this bulletin is to be installed in accordance with the latest publication standards of NFPA or other similar organisations and also with the
provision of government codes or ordinances wherever applicable.
The information provided by us is to the best of our knowledge and belief, and consist of general guidelines only. Site handling and installation control is not in our scope.
Hence we give no guarantee for result and take no liability for damages, loss or penalties whatsoever, resulting from our suggestion, information, recommendation or
damages due to our product.
Product development is a continuous programme of HD FIRE PROTECT PVT. LTD. and hence the right to modify any specification without prior notice is reserved with
the company.

D-6/2, ROAD NO. 34, WAGLE INDUSTRIAL ESTATE, THANE 400 604, INDIA.
HD FIRE PROTECT PVT. LTD. • TEL: + (91) 22 2158 2600 • FAX: +(91) 22 2158 2602
Protecting What Matters Most to You • EMAIL: [email protected] • WEB: www.hdfire.com

MAY, 2019 PAGE 6 OF 6 HD 127

You might also like