The document describes specifications for suspended ceiling installation and toilet partition installation. For suspended ceilings, it specifies installing double gypsum panels on a steel frame, closing gaps on free sides, installing lighting fixtures, and lowering the ceiling height as required. It also describes specifications for installing one-sided moisture resistant gypsum board toilet partitions with steel frames and accessories. The work includes materials, installation, scaffolding usage, and is calculated per square meter installed.

Uploaded by

Mila Kuzmanović
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views

Gips

The document describes specifications for suspended ceiling installation and toilet partition installation. For suspended ceilings, it specifies installing double gypsum panels on a steel frame, closing gaps on free sides, installing lighting fixtures, and lowering the ceiling height as required. It also describes specifications for installing one-sided moisture resistant gypsum board toilet partitions with steel frames and accessories. The work includes materials, installation, scaffolding usage, and is calculated per square meter installed.

Uploaded by

Mila Kuzmanović
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

R2

10 ASSEMBLY WORKS

Procurement, transportation and installation of suspended ceilings with


double plasterboard d=2x12.5 mm in the premises and corridors of the
building, on the steel-galvanized "UD-CD" construction. Mount the panels
over the typical flexible aluminum substructure, which goes into position. The
position implies the closing of suspended ceilings on free sides (sides in
positions that do not end on walls and elements a.b. of the structure of the
building). The position includes the installation of revisions in the ceilings.
The unit price also includes: bandaging of the composition of the panels, with
coating with a thin layer of gypsum plaster, formation of all openings for
10,1 lighting, ventilation, etc. The unit price includes the construction of cascades m²
and the closing of suspended ceilings. Lower the ceiling to the height
according to the project, depending on the room, measured from the
mezzanine structure. Recessed lights, ventilation equipment, etc. must be
hung separately. In everything else, the provisions of the general conditions
apply. The unit price includes all drilling and trimming of the ceiling for the
installation of lamps, anemostats, diffusers, etc. which will not be paid
separately. The position includes all labor, material and use of scaffolding.
Calculation per m² of suspended ceiling.

Procurement of materials and installation of one-sided cladding of the


built-in installation element for the Geberit toilet in sanitary facilities,
moisture-resistant plasterboard d=12.5 mm, which are installed on a
standard metal substructure 75 mm thick made of steel galvanized CW
and UW profiles with a sheet thickness of 0.6 mm. Geberit built-in height
10,2 112 cm with a low-noise built-in cistern (Geberit art 111.311 or similar) m²
and a button for activating the cistern made of stainless steel with
additional fixing, in accordance with the project of hydrotechnical
installations. The price includes the making of joints
bandage tapes, puttying and smoothing of joints, substructure and
accessories for hanging, as well as the use of scaffolding. Calculation per
m² of completely finished coverings

WH
10 ASSEMBLY WORKS
Procurement, transport and installation of suspended ceilings with
double gypsum boards d = 2x12.5 mm in the rooms and corridors of the
building, on a steel-galvanized "UD-CD" construction. The panels are
mounted over a typical flexible aluminum substructure, which enters the
position. The position implies the closing of the suspended ceilings on the
free sides (sides on the positions that do not end on the walls and
elements a.b. of the building construction). The position implies the
installation of revisions in the ceilings. The unit price also includes:
banding the composition of the panels, with a thin layer of gypsum
plaster, forming all the openings for lighting, ventilation, etc. The unit
price includes the production of cascades and closing suspended ceilings.
Lower the ceiling to the height according to the project depending on the
room, measured from the mezzanine structure. Recessed luminaires,
ventilation equipment and other must be mounted separately. In
10,1 everything else, the provisions of the general conditions apply. The unit m²
price includes all drilling and decorating the ceiling for the installation of
lamps, anemostats, diffusers, etc., which will not be paid separately. The
position includes all work, material and use of scaffolding. Calculation per
m² of the executed suspended ceiling.

Procurement of materials and installation of one-sided lining of the


installation installation element for the Geberit toilet bowl in sanitary
facilities, moisture-resistant gypsum boards d = 12.5 mm, which are
installed on a standard 75 mm thick metal substructure made of
galvanized steel CW and UW 0.6 mm thick sheet metal profiles. Geberit
installation height 112 cm with low-noise built-in cistern (Geberit art
111.311 or equivalent) and button for activating stainless steel cistern
with additional fixing, in accordance with the project of hydraulic
installations. The price includes the production of joints
10,2 m²
1160.62 € 31.20 € 36,211.34

23.30 € 39.00 € 908.70


55.83 € 31.20 € 1,741.90

1.50 € 39.00 € 58.50


Nabavka, transport i ugradnja spuštenih plafona sa jednostrukom gips pločom d=12,5 mm u prostorijama i hodnicima
objekta, na čelično-pocinkovanu „UD-CD“ konstrukciju. Montirajte panele preko tipične fleksibilne aluminijumske
podkonstrukcije, koja se postavlja na svoje mesto. Položaj podrazumeva zatvaranje spuštenih plafona na slobodne strane
(strane na pozicijama koje se ne završavaju na zidovima i elementima a.b. konstrukcije objekta). Pozicija uključuje
ugradnju revizija u plafone. U jediničnu cenu je uključeno i: bandažiranje sastava panela, sa premazivanjem tankim slojem
gipsanog maltera, formiranje svih otvora za osvetljenje, ventilaciju i dr. U jediničnu cenu je uračunata izrada kaskada i
zatvaranje spuštenih plafona. Spustite plafon na visinu prema projektu, u zavisnosti od prostorije, mereno od međuspratne
konstrukcije. Ugradna svetla, oprema za ventilaciju itd. moraju biti odvojeno okačeni. U svemu ostalom važe odredbe
opštih uslova. U jediničnu cenu je uključeno sve bušenje i obrezivanje plafona za ugradnju svetiljki, anemostata, difuzora i
sl. koje se ne plaćaju posebno. Pozicija uključuje sav rad, materijal i upotrebu skele. Obračun po m² spuštenog plafona.

„Nabavka materijala i ugradnja jednostrane obloge ugradnog instalacionog elementa za Geberit toalet u sanitarnim
čvorovima, gips ploče otporne na vlagu d=12,5 mm koje se postavljaju na standardnu metalnu podkonstrukciju debljine 75
mm od pocinkovanog čelika. CV i UV profili debljine lima 0,6 mm Geberit ugradna visina 112 cm sa ugradnim
vodokotlićem bez buke (Geberit art 111.311 ili sl.) i dugmetom za aktiviranje vodokotlića od nerđajućeg čelika sa
dodatnim fiksiranjem, u skladu sa projektom hidrotehničkih instalacija.U cenu je uračunata izrada spojnica zavojne trake,
gletovanje i gletovanje spojeva, podkonstrukcije i pribora za kačenje, kao i korišćenje skela. Obračun po m² potpuno
gotovih obloga"
Nabavka, transport i montaža spuštenih plafona sa duplim gips pločama d=2k12,5mm u prostorijama i hodnicima objekta,
na čelično-pocinkovanu „UD-CD“ konstrukciju. Paneli se montiraju preko tipične fleksibilne aluminijumske
podkonstrukcije, koja ulazi u poziciju. Položaj podrazumeva zatvaranje spuštenih plafona na slobodne strane (strane na
pozicijama koje se ne završavaju na zidovima i elementima a.b. konstrukcije zgrade). Položaj podrazumeva ugradnju
revizija u plafone. U jediničnu cenu je uključeno i: trakiranje sastava panela, tankim slojem gipsanog maltera, formiranje
svih otvora za osvetljenje, ventilaciju itd. U jediničnu cenu je uključena izrada kaskada i zatvaranje spuštenih plafona.
Spustite plafon na visinu prema projektu u zavisnosti od prostorije, mereno od međuspratne konstrukcije. Ugradne
svetiljke, oprema za ventilaciju i ostalo moraju se montirati odvojeno. U svemu ostalom važe odredbe opštih uslova. U
jediničnu cenu su uključena sva bušenja i dekoracije plafona za ugradnju svetiljki, anemostata, difuzora i sl. koje se ne
plaćaju posebno. Pozicija uključuje sav rad, materijal i upotrebu skele. Obračun po m² izvedenog spuštenog plafona

Nabavka materijala i ugradnja jednostrane obloge instalacionog instalacionog elementa za Geberit VC šolju u sanitarnim
čvorovima, gips ploče otporne na vlagu d=12,5mm, koje se postavljaju na standardnu metalnu podkonstrukciju debljine
75mm od pocinkovanog čelika CV i UV profili od lima debljine 0,6 mm. Geberit ugradna visina 112 cm sa niskošumnim
ugrađenim vodokotlićem (Geberit art 111.311 ili ekvivalent) i dugmetom za aktiviranje vodokotlića od nerđajućeg čelika
sa dodatnim fiksiranjem, u skladu sa projektom hidrauličnih instalacija. U cenu je uračunata izrada spojnica