M1 Assignment No. 1
M1 Assignment No. 1
COLLEGE OF ENGINEERING
ELECTRICAL ENGINEERING DEPARTMENT
CALOOCAN CAMPUS
ASSIGNMENT
ENGINEERING ECONOMY
SUBJ/SEC.:
SUBMITTED TO:
INSTRUCTOR
DATE SUBMITTED:
September 20, 2022
Engineering Economics
Assignment 1:
Solve the following and write your solution on a short bond paper.
2. A person earns a 10% commission for every item he sells. If he sold a set of
encyclopedias for P700.00 instead of its original price of P800.00, how much less
of a commission does he earn?
In determining the cost involved in fabricating sub-assembly B within a company,
the following data have been gathered:
Direct material P0.30 per unit
Direct Labor P0.50 per unit
Testing set-up P300.00 per set up
It is decided to subcontract the manufacturing of assembly B to an outside
company. For an order of 100 units, what is the cost per unit that is acceptable to
the company?
3. A luxury car is 22.5% off on a year-end sale. The selling price is P348,750.00. What
is the price of the car?
4. A man bought a $20.00 book and wishes to sell it. At what price should he mark it
if he wishes to give a 40% discount and make a 50% profit on the cost?
5. The salary of an employee’s job had five levels, each one 5% greater than the one
below it. Due to circumstances, the salary of the employee must be reduced from
the top (fifth) level, which means a reduction of P3,000.00 per month. Compute the
employee’s present salary per month.
6. Peter invested P300,000.00 with 15% return in an electronic shop and 8% return in
real estate. His annual income from his investments is P40,000.00. how much did
he invest in the electronic shop?
8. A land reclamation project requires the use of a P50-hp pump. The project
engineer has a choice between pumps P and R. The price, maintenance cost, and
efficiency for pump P are: P70,000.00, P3,400.00 and 80%, while the respective
values for pump R are: P150,000.00, P8,500.00, and 90%. The pump selected will
be used for P10/ kW-hr, determine which pump should be chosen.
Solution: