0% found this document useful (0 votes)
71 views

Float Exercise

Uploaded by

Amul Amnaje
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views

Float Exercise

Uploaded by

Amul Amnaje
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

1

9
6
E
H
B

3 2 3 6

A D G I

5
8
C
F

Find the duration of each path in the project and mark the critical path:

© 2013 McGraw-Hill Education


1
9
6
E
H
B

3 2 3 6

A D G I

5
8
C
F

Complete the forward pass for the project.


Hint: Early Start + Duration – 1 = Early Finish
© 2013 McGraw-Hill Education
1
9
6
E
H
B

3 2 3 6

A D G I

5
8
C
F

Complete the backward pass for the project.


Hint: Late Finish – Duration + 1 = Late Start
© 2013 McGraw-Hill Education
1
9
6
E
H
B

3 2 3 6

A D G I

5
8
C
F

Now find the float for each node.


Hint: Find the difference between the early start and the late start.
© 2013 McGraw-Hill Education
Float solution follows this page.

© 2013 McGraw-Hill Education


1
9
6
E
H
B

3 2 3 6

A D G I

5
8
C
F

Find the duration of each path in the project and mark the critical path:
• ABEHI = 25 days (this is the critical path as marked above)
• ADHI = 20 days
• ADGI = 14 days
• ACFI = 22 days
© 2013 McGraw-Hill Education
10 1 10 11 9 19
4 6 9
E
H
B

1 3 3 4 2 5 6 3 8 20 6 25

A D G I

4 5 8
9 8 16
C
F

Complete the forward pass for the project.


Hint: Early Start + Duration – 1 = Early Finish
© 2013 McGraw-Hill Education
10 1 10 11 9 19
4 6 9
E
H
B 10 10 11 19
4 9

1 3 3 4 2 5 6 3 8 20 6 25

A D G I
1 3 9 10 17 19 20 25

4 5 8
9 8 16
C
7 11 F
12 19

Complete the backward pass for the project.


Hint: Late Finish – Duration + 1 = Late Start
© 2013 McGraw-Hill Education
10 1 10 11 9 19
4 6 9
E
H
B 10 10 11 19
4 9 0
0
0

1 3 3 4 2 5 6 3 8 20 6 25

A D G I
1 3 9 10 17 19 20 25

0 5 11 0

4 5 8
9 8 16
C
7 11 F
12 19
3
3

Now find the float for each node.


Hint: Find the difference between the early start and the late start.
Watch the video “Float Exercise Explained” for a detailed explanation.
If you follow this approach on your exam, you can answer all float questions.