Float Exercise
Float Exercise
9
6
E
H
B
3 2 3 6
A D G I
5
8
C
F
Find the duration of each path in the project and mark the critical path:
3 2 3 6
A D G I
5
8
C
F
3 2 3 6
A D G I
5
8
C
F
3 2 3 6
A D G I
5
8
C
F
3 2 3 6
A D G I
5
8
C
F
Find the duration of each path in the project and mark the critical path:
• ABEHI = 25 days (this is the critical path as marked above)
• ADHI = 20 days
• ADGI = 14 days
• ACFI = 22 days
© 2013 McGraw-Hill Education
10 1 10 11 9 19
4 6 9
E
H
B
1 3 3 4 2 5 6 3 8 20 6 25
A D G I
4 5 8
9 8 16
C
F
1 3 3 4 2 5 6 3 8 20 6 25
A D G I
1 3 9 10 17 19 20 25
4 5 8
9 8 16
C
7 11 F
12 19
1 3 3 4 2 5 6 3 8 20 6 25
A D G I
1 3 9 10 17 19 20 25
0 5 11 0
4 5 8
9 8 16
C
7 11 F
12 19
3
3