1. Unit testing has been introduced newly in the policy. What are objectives of Unit
Testing, and what are the various techniques of unit testing. What are the measures used
to measure it. How can u assure that it is compliance with your company Test Policy (10
Points).
6.You are going to take Load/Stress testing for a project which will be exhaustive one.
What are the questions that your project manager will be asking when you take that
assignment?(10 Points)
7.It has been observed that testers in your organization are performing tests on the
deliverables even after significant defects have been found. This has resulted in
unnecessary testing of little value because re-testing needs to be done after defects have
been rectified. You as the test manager list what recommendations you are going to
make on when to stop testing.(10 Points)
8. Which activity is included in Acceptance Testing, which is not done in System testing
to ensure the Customer Requirements are met?(10 Points)
9. List the 5 most common error tester’s makes? (10 points)