Unit testing aims to validate that individual software units perform as designed. It should include definition of objectives, techniques like black/white-box testing, and measures like code coverage. Regularly updating the test plan is important to ensure testing remains effective with changing requirements and schedules. When time is reduced for testing, scope may need to be reduced by prioritizing critical tests or increasing test automation.

Uploaded by

Vijayananthan Ks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

CSTE Subjective 2

Unit testing aims to validate that individual software units perform as designed. It should include definition of objectives, techniques like black/white-box testing, and measures like code coverage. Regularly updating the test plan is important to ensure testing remains effective with changing requirements and schedules. When time is reduced for testing, scope may need to be reduced by prioritizing critical tests or increasing test automation.

Uploaded by

Vijayananthan Ks
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 7

CSTE Mock Exam: Paper4 Date: 14th June 2008

Duration: 75 mins

1. Unit testing has been introduced newly in the policy. What are objectives of Unit
Testing, and what are the various techniques of unit testing. What are the measures used
to measure it. How can u assure that it is compliance with your company Test Policy (10
Points).

2. Explain 5 risks in an e-Commerce project. Identify those Personnel who must be


involved in the risk analysis of a project and describe what they need to do. How will you
prioritize the risks? (10 Points).
3.The top management was feeling that when there are any changes in the technology
being used, development schedules etc, it's a waste of time to update the Test Plan also
from time to time. Instead they are emphasizing that you should put your time into testing
than working on the test plan. Your Project Manager asked you for your opinion. You
have argued that Test Plan is very important and you need to update your test plan from
time to time. It’s not at all a waste of time and testing activities would be more effective
when you have your plan clear.
Explain with some metrics, how you would support your argument to have the test plan
in place all the time. (15 Points).
4.You have estimated a testing phase of 4 weeks in your test plan. Due to changing
requirements, the development team delays the hand-off to you (the testing team) by a
week. But your final shipment date is the same. Without change in any of the other
resources (man power, or any other resource), what would you do in order to cater to the
situation (one week less for testing).(10 Points).
5.Define the standards for the following: (15 Points).
i. Test plan
ii. Test scripts and
iii. Test Report

6.You are going to take Load/Stress testing for a project which will be exhaustive one.
What are the questions that your project manager will be asking when you take that
assignment?(10 Points)
7.It has been observed that testers in your organization are performing tests on the
deliverables even after significant defects have been found. This has resulted in
unnecessary testing of little value because re-testing needs to be done after defects have
been rectified. You as the test manager list what recommendations you are going to
make on when to stop testing.(10 Points)
8. Which activity is included in Acceptance Testing, which is not done in System testing
to ensure the Customer Requirements are met?(10 Points)
9. List the 5 most common error tester’s makes? (10 points)