The document discusses potential changes and exclusions to the training Schedule-II for LDC engineers. It suggests excluding, restricting, or briefly covering several topics to reduce the time required, as the scenario is changing dynamically. Operational and protection aspects would still be emphasized.

Uploaded by

Surajit Banerjee
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Syllabus Committee Schedule I and II

The document discusses potential changes and exclusions to the training Schedule-II for LDC engineers. It suggests excluding, restricting, or briefly covering several topics to reduce the time required, as the scenario is changing dynamically. Operational and protection aspects would still be emphasized.

Uploaded by

Surajit Banerjee
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 87

Schedule-II (for LDCs) starts from

page 67
Scenario is dynamically changing.
So "current" scenario needs to be
updated every 6 months / year.

Not required for LDC engineers

Emphasis on operational
and protection aspects

explaining optimal mix requires in detail


would require some time. So if it is deemed
necessary, then exclusive time needs to be
planned for it.

May be excluded
for LDC engineers
May be excluded
for LDC engineers

May be restricted
within 2 hours for
IEC & LDC engineers
only the interface SEMs
used for energy
accounting, as specified
in metering regulations
of CEA

recommendations of
Ramakrishna Task
Force report may be
included

May be covered
as briefly as
possible
Maintenance of sub-
stations may be covered
briefly, only mentioning the
types of maintenance carried
out, time required to complete
each type of maintenance
and periodicity of such
maintenance

May be excluded for LDC


engineers
The latest CERC & CEA
regulations, MOP orders
which are extremely relevant
to POSOCO's functioning
may be included. These are
already covered in the Basic iv, v and vi may be
System Operator deleted and substituted
Certification Course, which by relevant CERC
is conducted periodically by regulations on RLDC F&C
NPTI.

SCED and Ancillary Services


administered by NLDC, also
needs to be included in full
detail

May be replaced
by POSOCO's own
WPP for managing
contracts.
Salient features of
the same may be
included
May be excluded for LDCs

1A and 2A may be clubbed together


and treated as site experience for
LDC engineers, to be completed in
2 weeks