Syllabus Committee Schedule I and II
Syllabus Committee Schedule I and II
page 67
Scenario is dynamically changing.
So "current" scenario needs to be
updated every 6 months / year.
Emphasis on operational
and protection aspects
May be excluded
for LDC engineers
May be excluded
for LDC engineers
May be restricted
within 2 hours for
IEC & LDC engineers
only the interface SEMs
used for energy
accounting, as specified
in metering regulations
of CEA
recommendations of
Ramakrishna Task
Force report may be
included
May be covered
as briefly as
possible
Maintenance of sub-
stations may be covered
briefly, only mentioning the
types of maintenance carried
out, time required to complete
each type of maintenance
and periodicity of such
maintenance
May be replaced
by POSOCO's own
WPP for managing
contracts.
Salient features of
the same may be
included
May be excluded for LDCs