The document summarizes the students' progress on their capstone design project over the past week. They finalized their project budget of 568.54 DHS for high quality solar panel, wind turbine, fan, and inverter components. As part of their project plan, they will discuss their interim report and create a sketch and block diagram for their solar-wind hybrid energy harvesting device in the coming week. They presented their 80-day project plan that tracks collecting ideas, approving a design, researching, and submitting interim and final reports with feedback from their instructor.

Uploaded by

Shamma S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
950 views

LOG-book 7

The document summarizes the students' progress on their capstone design project over the past week. They finalized their project budget of 568.54 DHS for high quality solar panel, wind turbine, fan, and inverter components. As part of their project plan, they will discuss their interim report and create a sketch and block diagram for their solar-wind hybrid energy harvesting device in the coming week. They presented their 80-day project plan that tracks collecting ideas, approving a design, researching, and submitting interim and final reports with feedback from their instructor.

Uploaded by

Shamma S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

ELE 4902: Capstone Design Project

faculty of engineering technology and since.

LOG-BOOK 7

Capstone Design Project I

Student Name ID

Bakheeta Ali H00370633


Rouda Mohamed H00372790
Shamma Saber H00370759
Muzoun Mahmood H00372085

Instructor:
Dr. Emad Abdu-Elrady.

1
ELE 4902: Capstone Design Project
faculty of engineering technology and since.

Introduction:
During this week, we followed up with the last week’s work. Last week We discussed as a group

members about what our project will achieve and we are trying to we are trying to achieve a solar-wind

turbine for hybrid energy harvesting, which is the process of converting ambient energy into electrical

energy that may be utilized to power autonomous electronic devices or circuits.. Also, we talked about As

part of the solution, a solar panel will be mounted above or below the vertical wind turbine atop a fan

which will be used as wind, and both will be linked to a device that will store the harvested energy. The

project will cover a large region of the natural environment, ultimately providing a practical option for

capturing solar and wind energy.

Deliverables

This week we made our budget for our project with a high quality components with a fair price and good

performance. As the total budget will equal to 568.54 DHS and the components are Flexible Solar Panel

Mono-crystalline 200W With Tape Rv Caravan High Price Solar Panel that cost 1.67DHS per

piece ,Wind turbine Micro Vertical axis costs 293.87 DHS, Fan with LED light and remote control

rechargeable battery table tripod camping costs 90 DHS and 500W solar inverter 12v 24v inverter with

charger costs 183 DHS.

2
ELE 4902: Capstone Design Project
faculty of engineering technology and since.

As will be discussed, the overall cost of the project is 568.54 DHS. As part of the plan completion,

keeping an eye on the projects budget is important to accomplish our objectives. Overall, customers are

searching for high quality, a fair price, sound design, and performance. Therefore, functionality is a

significant client demand that our solution must match. We also talked about project management. This

figure shows our project plan till writing the report. We used the project plan 365 software. To

get this plan. As it is showing in the table, the plan took us 80 days to get our project, collect the

ideas, approve one idea, search for information, and finally write the interim report 1, after that

we got our feedback and started the interim report 2 and the presentation. After getting the

feedback we finally started the final report and the final presentation of the project. Moreover,

this plan shows how the group communicates to discuss the ideas and all the project details. We

did a physical meeting on campus first. Then we thought that we needed extra time, so we did a

zoom meeting. Also, we always communicate on our WhatsApp group.

3
ELE 4902: Capstone Design Project
faculty of engineering technology and since.

Next week we will discuss about the project interim report and do a sketch for the project and edit on the

report block diagram.