Unit 06 - Assignment Brief 1 - Digital Transformation - 082022
Unit 06 - Assignment Brief 1 - Digital Transformation - 082022
Submission Format:
Format: The submission is in the form of an individual written report that shows how you have manage
the project. This should be written in a concise, formal business style using single spacing
and font size 12. You are required to make use of headings, paragraphs and subsections as
appropriate, and all work must be supported with research and referenced using the
Harvard referencing system. Please also provide a bibliography using the Harvard
referencing system.
Submission Students are compulsory to submit the assignment in due date and in a way requested by
the Tutors. The form of submission will be a soft copy in PDF posted on corresponding
course of http://cms.greenwich.edu.vn/
Note: The Assignment must be your own work, and not copied by or from another student or from
books etc. If you use ideas, quotes or data (such as diagrams) from books, journals or other sources, you
must reference your sources, using the Harvard style. Make sure that you know how to reference
properly, and that understand the guidelines on plagiarism. If you do not, you definitely get fail
Assignment Brief and Guidance:
Introduction to theme
The environmental impact of digital transformation
The amount of data created and stored globally is expected to reach 175 Zettabytes by 2025, a six-fold
increase from 2018. This will demand additional hardware and power consumption, which; in turn, will
increase the environmental impact of the digital sector and there is already increasing attention on the
environmental footprint of ICT equipment and services as they become more widespread in all aspects of
human life.
It is the responsibility of everyone to take action in addressing the challenges of climate change, as
professionals we must also seek ways that the digital sector can play its part. While digital technologies
are one of the sectors that has achieved greater efficiency; achieving about 100 times more computation
power from the same amount of energy per decade, it remains unsustainable. The sector must continue
Page 1
to seek ways in which it can continue to support and drive innovation, while addressing the global
climate emergency for a greener and fairer future.
This unit will enable students to explore the impact of digital endpoint devices and ways to reduce
environmental damages, OR the potential of refurbishing, repairing and reusing devices rather than
replacing
Tasks
As a member of Research and Development department, you have been assigned a mini-project to find
out the impact of remoting working including benefit, potential future development as well as
challenges to implement remoting working and how to tackle them.
You need to do primary research (both qualitative and quantitative research) and secondary research to
find out that impact and conduct a report for your research. Even it’s a mini-project, you must apply
project management (PM) techniques such as project charter with aims, objectives, cost etc. As for time
management, you need to produce WBS and Gantt chart with reasonable tasks and time. A project
logbook is required to provide evidence of the project development process and ongoing reflection for
every week. This logbook will be needed later for your reflection and evaluation in Assignment 2. As part
of QA (quality assurance) policy, in the report you also need to critically evaluate the PM process and
appropriate research methodologies applied.
Your report must have an introduction stating the project aims and objectives. This must be followed by
a copy of your project management plan. Your plan should show the milestones when you will review
with your tutor your ongoing progress so far. You will submit your logbook which shows how you have
carried out the project.
LO1 Establish project aims, objectives and timeframes based on LO1 & LO2
the chosen theme D1. Critically evaluate the
P1 Devise project aims and M1 Produce a comprehensive project management
objectives for a chosen project management plan, process and appropriate
scenario. milestone schedule and project research methodologies
P2 Produce a project schedule for monitoring and
applied.
management plan that completing the aims and
covers aspects of cost, scope, objectives of the project.
time, quality, communication,
risk and resources.
P3 Produce a work
Page 2
breakdown structure and a
Gantt Chart to provide
timeframes and stages for
completion.