Chapter 11
Project Control
Focus of Control
Scope
Cost
Time
11-2
1
7/9/2018
Scope
Technical problems
Technical difficulties
Quality problems
Client wants changes
Interfunctional complications
Technological breakthroughs
Intrateam conflict
Market changes
11-3
Cost
11-4
2
7/9/2018
Time
11-5
11-6
3
7/9/2018
11-7
4
7/9/2018
Cybernetic control
Go/no-go control
Post control
11-10
5
7/9/2018
Cybernetic Control
11-11
6
7/9/2018
11-13
Go/No-go Controls
11-14
7
7/9/2018
11-15
Phase-Gated Processes
11-16
8
7/9/2018
Postcontrol
11-17
11-18
9
7/9/2018
11-19
Flexible Accurate
Cost effective Simple
Useful Easy to maintain
Ethical Fully documented
Timely
11-20
10
7/9/2018
Benchmarking
11-22
11
7/9/2018
11-24
12
7/9/2018
11-25
11-26
13
7/9/2018
Cybernetic controls
– Response tends to be positive
Go/no-go controls
– Response tends to be neutral or negative
Post controls
– See as a report card
– Response depends on “grade”
11-28
14
7/9/2018
11-30
15
7/9/2018
11-31
Change Guidelines
11-32
16