0% found this document useful (0 votes)
513 views7 pages

MOP - Upgrade DCI-PE-02 ASR920

The document provides a procedure to upgrade the ASR920 router from IOS-XE 03.17.03.S to 16.09.03. It includes pre-activity steps like copying software to bootflash and checking file integrity. The procedure captures services and traffic before upgrade, details the upgrade steps, and captures services and traffic after to verify the upgrade. It also includes rollback steps if needed.

Uploaded by

farih anashih
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
513 views7 pages

MOP - Upgrade DCI-PE-02 ASR920

The document provides a procedure to upgrade the ASR920 router from IOS-XE 03.17.03.S to 16.09.03. It includes pre-activity steps like copying software to bootflash and checking file integrity. The procedure captures services and traffic before upgrade, details the upgrade steps, and captures services and traffic after to verify the upgrade. It also includes rollback steps if needed.

Uploaded by

farih anashih
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Method of Procedure

Upgrade DCI-PE-02 ASR920

Revision Record
Date Revised Version Change description Author

05 September 2022 1.0 First Draft M. Naufal Kurniawan

1
Table of Contents
Background...................................................................................................................................3
Work Information.............................................................................................................................3
1.1.1 Site Address.................................................................................................................3
1.1.2 Work Schedule...............................................................................................................3
1.1.3 Activity Time Plan...........................................................................................................3
1.1.4 Software Requirement......................................................................................................3
Network Topology............................................................................................................................3
Pre-Activity....................................................................................................................................4
Before & After................................................................................................................................4
Detail Upgrade Procedure..................................................................................................................7
Rollback Procedure..........................................................................................................................7
Appendix......................................................................................................................................7

2
Background
The purpose of this document is to provide the information and procedure upgrade the ASR920.

Work Information
1.1.1 Site Address
No. Hostname Platform IP Address Site Name
1. DCI-PE-02 ASR-920-24SZ-M 10.255.102.27 Data Center Indonesia
Site Address and Hostname Information

1.1.2 Work Schedule


Date : 8 September 2022
Working Time : 02:00 – 06:00 AM
Work Description : Upgrade ASR920 IOS-XE 03.17.03.S to 16.09.03

1.1.3 Activity Time Plan


No. Activity Time Plan Status
1. Capture before all services 00:00 - 01:00
2. Execute the upgrade 02:00 – 02:30
3. Monitoring & Service checking after upgrade 03:00 – 04:00
4. Final verification & Monitoring traffic 04:00 – 05:00
5. Capture After all services 05:00 – 06:00

1.1.4 Software Requirement


IOS Rommon
Fuji-16.9.3 MD 15.6(43r)S
Download IOS asr920-universalk9_npe.16.09.03.SPA.bin
Download rommon asr920_15_6_43r_s_rommon.pkg
https://software.cisco.com/download/home/286288751/type/282046477/release/Fuji-16.9.3
https://software.cisco.com/download/home/286288751/type/282046486/release/15.6(43r)S
Network Topology
The network topology of below site is shown in Error: Reference source not found.
Topology
DCI-PE-02 Remote Client

Figure 1. Topology

3
Pre-Activity
Step task Owner(s) Status Remark
1 copy scp:asr920-universalk9_npe.16.09.03.SPA.bin bootflash: Multipolar  The images is already uploaded to the
Jumbox server, So we can copy from
there, Please make sure the bootflash
have a free space to store the image
2 copy scp:asr920_15_6_43r_s_rommon.pkg bootflash: Multipolar  The rommon is already uploaded to the
Jumbox server, So we can copy from
there, Please make sure the bootflash
have a free space to store the rommon
3 dir bootflash: Multipolar  Check the files is already transferred to
the bootflash
4 verify /md5 bootflash:asr920-universalk9_npe.16.09.03.SPA.bin Multipolar  Check the file integrity, Will be showing
5ca8a4a38b6b3cdd8c4d125339317e4b DONE if the security is match

5 verify /md5 bootflash:asr920_15_6_43r_s_rommon.pkg 99ac9ece7eb6c2f1d19727bd3f5653ca Multipolar  Check the file integrity, Will be showing
DONE if the security is match

Before & After


Step task Owner(s) Status Remark
1 terminal length 0 Multipolar  Hardware check, SDM must be use
terminal monitor VIDEO template
show version
show platform
show platform software status control-processor brief
show processes cpu
show license all
show hw-module all fpd
show ntp status

4
show interfaces description
show ip int brief
show run
show log
dir bootflash:
show sdm prefer current
2 Show xconnect all Multipolar  L2 & L3 service check
Show l2vpn service xconnect all
Show mpls l2transport vc
Show mpls traffic-eng tunnels role all
Show int des | i UPLINK
show int des | i DOWNLINK
Show arp
Show arp vrf dci-corp-linknet01-fo
Show vrf
Show ip ospf neighbor
Show mpls ldp neighbor
Show ip mroute
Show ip mroute vrf tgl-ftth-iptv-fo
Show bgp all summary
3 Ping 192.168.227.41 Multipolar  Reachability check
Ping 192.168.229.49

Ping vrf dci-corp-linknet01-fo 139.255.60.58


Ping vrf dci-corp-linknet01-fo 202.137.14.2
ping vrf dci-corp-linknet01-fo 139.255.4.49

ping vrf dci-corp-banknet01-fo 172.181.184.2

5
ping vrf dci-gcp-it01-fo 169.254.44.225
ping vrf dci-gcp-it01-fo 169.254.176.25

ping vrf dci-gcpbigdata-it01-fo 169.254.200.57

ping vrf dci-kseinet-schroder01-fo 10.16.2.218

ping vrf dci-nms-metro01-fo 192.168.234.162


ping vrf dci-nms-metro01-fo 192.168.234.163
ping vrf dci-nms-metro01-fo 192.168.234.164
ping vrf dci-nms-metro01-fo 192.168.234.165

4 http://support.link.net.id/cacti/index.php Multipolar  Open the browser then follow the url to


capture the traffic on cacti graph

6
Detail Upgrade Procedure
Step task Owner(s) Status Remark
1 configure terminal Multipolar  Enter configuration mode
2 boot system bootflash:asr920-universalk9_npe.16.09.03.SPA.bin Multipolar  Set boot file system
3 end Multipolar  Exit configuration mode
4 sh run | i boot Multipolar  Check boot config
5 configure terminal Multipolar  Enter configuration mode
6 no boot system bootflash:asr920-universalk9_npe.03.17.03.S.156-1.S3-std.bin Multipolar  Remove the previous boot file system,
7 Line vty 0 15 Multipolar  enter to line vty config
8 access-class 1 in vrf-also Multipolar  Access-list applied for all VRF
9 end Multipolar  Exit configuration mode
10 sh run | i bootfl Multipolar  Check boot config, Make sure only one
boot system for 16.09.03
11 show run | sec line Multipolar  Check line vty config, Make sure it’s
already applied
12 write memory Multipolar  Save configuration
13 upgrade rom-monitor filename bootflash:asr920_15_6_43r_s_rommon.pkg all Multipolar  Upgrade the rommon
14 reload Multipolar  Reload for upgrade

Rollback Procedure
If needed

Appendix
#Capture/Output/Files Remark