0% found this document useful (0 votes)
25 views

EID Generator Application Requirements

The document outlines the requirements and documentation needed for an inspection of a generator and transfer switch installation. It includes a list of documents to submit, technical data required for the generator and transfer switch, minimum installation requirements, and a diagram of the recommended breaker arrangement.

Uploaded by

generaljomo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

EID Generator Application Requirements

The document outlines the requirements and documentation needed for an inspection of a generator and transfer switch installation. It includes a list of documents to submit, technical data required for the generator and transfer switch, minimum installation requirements, and a diagram of the recommended breaker arrangement.

Uploaded by

generaljomo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

RGA/

RGI
MINISTRY OF PUBLIC UTILITIES
GOVERNMENT ELECTRICAL INSPECTORATE DIVISION
REQUIREMENTS FOR GENERATOR APPLICATION
Documentation to be submitted for an Inspection of a Generator and Transfer Switch

1. Submission of a completed Application Form.


2. Submission of an approved License from the Minister of Public Utilities.
3. Submission of a single line diagramme showing the Generator, Transfer Switch, Breaker
arrangements, Normal Power supply feeder, Generator Power supply feeder, Emergency Board
supply feeder and other auxiliary Switches.
4. Category of the generator based upon the National Electric Code (NEC) 2011 Articles 700,
701 and 702.
5. Submission of the following Technical data on Generator and Transfer switch: -
GENERATOR
• Manufacturer • Engine Serial No.
• Rated Power in kW • Alternator Serial No.
• No. of Phases • Feeder Cable
• Supply Voltage • Generator Set Circuit Breaker
• Frequency

TRANSFER SWITCH
• Type • Voltage Rating
• Manufacturer • Power Rating in KVA/MVA
• No. of Phases • Serial No.
• Rated Current • No. of Poles

Please Note: On the day of the inspection, the generator is to be started and a load test conducted.

REQUIREMENTS FOR GENERATOR INSTALLATION


GENERATOR AND TRANSFER SWITCH
MINIMUM REQUIREMENTS
1. The Rated Power of the Generator shall be compatible with the connected load.
2. The Frequency, Phase Rotation and Generated Voltage shall be compatible to that of the
Supply Authority.
3. The installation of the Generator Transfer and other Switches, shall comply with the National
Electrical Code (NEC) Requirements at Table 110 (A) (1) (Working Spaces).
4. Equipment installed shall be in accordance with the requirements listing of Item 3.10 (Marking)
TTS 171 Part 1.
5. A fire extinguisher is to be readily accessible from the generator’s location.
6. The breaker arrangements shall comply with the drawing (GEI Breakers Arrangement).
7. The generator and transfer switch shall comply with the National Electric Code (NEC) 2011
Articles 700, 701 and 702.
8. For a three (3) pole transfer switch, if the neutral is bonded to the generator’s earth terminal
and/or generator chassis at the generator, no ground rod is to be driven. If the neutral is not
bonded to the earth terminal or to the generator’s chassis, a ground rod is to be driven with the
generator earthed at this point and a ground conductor run linking this ground rod to the main
earth ring.
9. For a four (4) pole transfer switch, a ground rod is to be driven and the neutral bonded to the
generator’s earth terminal. A ground conductor linking this ground rod to the main earth ring
shall also be installed.
NB: Attached is a copy of the GEI Breakers Arrangement
RGA/
RGI


GOVERNMENT ELECTRICAL INSPECTORATE DIVISION
REQUIREMENTS FOR GENERATOR INSTALLATION

Normal Supply Generator Supply


TS
1 2 3

5 GENERATOR

PANEL

GEI Breakers Arrangement


Legend: TS – transfer switch
1 – normal supply breaker
2 – normal supply isolator within sight of TS
3 – generator supply isolator within sight of TS
4 – generator supply breaker
5 – main switch for emergency/standby power panel

NOTE: Either 2 or 3 may be excluded if:


a). The normal supply breaker or the generator breaker are of the lockable type; or
b). The normal supply breaker or the generator breaker is within sight of TS