0% found this document useful (0 votes)
21 views

Consulting Form

Uploaded by

Anish Parmar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Consulting Form

Uploaded by

Anish Parmar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

From:

1. COMPANY : INDIAN [ ] FOREIGN [ ]


AREA LOCATION :

2. COMPANY TURN OVER : -


YEAR 2014-2015. -
YEAR 2015-2016. -
YEAR 2016-2017. -
YEAR 2017-2018. -
YEAR 2018-2019. -

3. SINGLE LARGEST WORK DONE COMPLETION CERTIFICATE :-


VALUE OF WORK :

DESCRIPTION OF WORK :-
4) TYPE OF WORK REQUIRED :-
(a) Earthwork [ ]
(b) Road Works [ ]
(c) Building Construction [ ]
(d) Water works [ ]
(e) Other Works [ ] ________.

(5) VALUE OF WORK REQUIRED :- 100/200/400/1000 Crs.


Required.
Rs. _________UP TO ____.

(6) PREFERABLE STATES FOR WORK :


(7) Ready to work:
(a) Direct bidding : Yes [ ] No [ ]
(b) Joint Venture : Yes [ ] No [ ]
(c) Back to Back : Yes [ ] No [ ]
(d) Sub- Contract : Yes [ ] No [ ]
(8) COMPANY'S SPECIALIZATION /EXPERTISE IN WORK :
_________________________________________.

(9) SOLVENCY : ____( In Crs. )

(10) BANK GARUNTEE LIMITS ( UN UTILISED ) :


RS.______________.

(11) IN HAND LIQUIDITY FOR WORK :


RS. _____________.

STAMP & SIGNATURE.


________

DESIGNATION. ________
DATE. ______

You might also like