Current Forging Tool History Sheet
Current Forging Tool History Sheet
Previous Sheet
Cummulative Qty -
Tool Name / Number M/C Number - Validation Qty - 300000 ± 20000
Previous Sheet
Validation Qty -
Tools code
SL
Processing Data Tools Production and replacement details
.No
Date OE / OET Produced Qty Qty produced after Validation Cummulative QTY Date of change/Validation Engineer sign
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Note:
1)Fill out the quality abnormality report and report it to your superior, except for periodic replacements 3) Mark with RED color paint for the non-usable tools
2)Every abnormal consumption will be noted in abnormal cunsumption report-Supervisor 4)Note the consumption details at the time of consumption
5) At the time of abnormality follow abnormality handling procedure
Created date: 05-06-2018 Revision.no/date: 00/- Ref.Doc.No:PRD/R/08 Issu.no/Date:05-06-2018
Tools code - Previous Sheet Validation Qty - Previous Sheet Cumulative Qty -
Tools Production and replacement details
SL
.No Date OE / OET Produced Qty Qty produced after Validation Cumulative QTY Date of change/Validation Shift Incharge sign
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Note:
1- If any abnormality inform to shift incharge immediately. 4- Update the Tool History Sheet at the End of the shift.
2- Tool Failure analysis to be done for every abnormal consuption by respective operator. 5- Note the consumption details in the Tool Change Record at the time of consumption.
3- Mark with RED colour paint for the non-usable tools 6- At the time of abnormality follow abnormality handling procedure.
Dept Head Sign
Created date: 05-06-2018 Revision.no/date: 00/- Ref.Doc.No:PRD/R/08 Issu.no/Date:05-06-2018
Shift Incharge
DATE EMP.NO PART NUMBER OUTPUT Shot blasted ON VALIDATION QTY CUMMULATIVE QTY
Sign
Note;
1- Start with Previous sheet Validation & Cummulative Qty, 5- Die life is completed inform to your superior for further action,
2- Mark with Round which side of the die is running. 6- Use new sheet for New tool.
3- Update the Tool History Sheet at the End of the shift. 7- Tool Failure analysis to be done for every abnormal consuption by
4- Mark with RED colour paint for the non-usable tools respective operator.
Dept Head Sign
SIGMA FORGING & FORMING PRIVATE LTD
ON / OFF Work Instruction Flow Diagram
COUNTER ON
SOURCE OFF
SHORT FEED ON
OFF