Problem Description
System allows returning more budget than allocated to specific fund center and
commitment item.
Budget Report
Now take example for fund center FC02 and commitment item COMT00
Return the budget for fund center FC02 and commitment item COMT00 for more
than 1200.
Go to FMBB
www.sapebooks.com Page 6 of 14
Press Save Button
www.sapebooks.com Page 7 of 14
Now check this report once again for Budget
Current budget become negative due to return posting on specific fund center. This
solution will help you to stop such posting in BCS which makes current budget
negative.
www.sapebooks.com Page 8 of 14
Solution in SAP
Be aware that Usage Rate Checks are only relevant once you have posted
consumption. Until you have any consumption, the system will not provide
you any warning or error message.
You can do it from the IMG activity "Edit Tolerance Profiles" by chosen
"absolute variances allowed"
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Availability Control > Edit Tolerance Profiles
www.sapebooks.com Page 9 of 14
Use the setting for rates and absolute variance allowed.
Now assign this profile to FM area or derive this from derivation strategy for
tolerance profile.
www.sapebooks.com Page 10 of 14
Do the required configuration at below mention node,
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Availability Control > Settings for Availability Control Ledger
> Define Derivation Strategy for Tolerance Profiles
Note: This configuration (Derivation Strategy for Tolerance Profiles ) is optional and
you may directly assign to FM area at below mention node. It depends upon your
configuration.
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Availability Control > Settings for Availability Control Ledger
> Assign Tolerance Profiles and Strategy for Control Objects
Do not forget to reconstruct your availability control for your AVL ledger
Now go to FMBB to test this return transaction once again to check whether
availability checks work or not
www.sapebooks.com Page 11 of 14
Press on check option
www.sapebooks.com Page 12 of 14
Now system will not allow you to return / transfer budget more than original posted.
Enjoy!