0% found this document useful (0 votes)
120 views1 page

1569 - Method Statement For Construction of Segments of Balance Cantilever Structure Viaduct 2 R1

The document is a letter from an engineer approving a method statement for construction of segments of a balance cantilever structure viaduct submitted by AFCONS Infrastructure. The engineer reviewed the method statement and found it satisfactory, recommending approval subject to contract requirements. The engineer advises informing them of any changes.

Uploaded by

Manvendra Nigam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views1 page

1569 - Method Statement For Construction of Segments of Balance Cantilever Structure Viaduct 2 R1

The document is a letter from an engineer approving a method statement for construction of segments of a balance cantilever structure viaduct submitted by AFCONS Infrastructure. The engineer reviewed the method statement and found it satisfactory, recommending approval subject to contract requirements. The engineer advises informing them of any changes.

Uploaded by

Manvendra Nigam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Authority’s Engineer for

Package 14 MUMBAI - NAGPUR Expressway

Ref: ESI-AFCONS/TL/1569/2022 Date:27.09.2022

To AFCONS Infrastructure
Attn. Mr. Sekhar Das, Project Manager

Copy to Mr. S. K. Survase, Chief Engineer and Project Director (Nodal)


Mr. Subash Borse, Executive Engineer

Subject: Construction of Hindu Hriday Samrat Balasaheb Thackerey


Samruddhi Mahamarg (Nagpur-Mumbai Super Communication
Expressway) in the state of Maharashtra on EPC mode for Package-
14, from Km. 623.379 to Km. 636.479 in section Village
Taranganpada-Pimpri Saddroddin to Village Vashala BK in District
Nashik & Thane.
– Submission of Method statement for construction of segments of Balance
Cantilever structure Viaduct 2 R1.

Ref: Your letter No: 3456/NMSCEW/TL/2485/2022 dated 24.09.2022

Mr. Sekhar Das,

The method statement f Method statement for construction of segments of Balance


Cantilever structure Viaduct 2 R1. vide your letter ref. no.3456/NMSCEW/TL/2485/2022
dated 24.09.2022, are being reviewed by Authority Engineer and found satisfactory, and
recommending the approval of the same, subject to compliance of contract requirement.

This is for your kind information and necessary action, and please feel free to contact
us for any clarification, if required. You are also advised that in case of any changes in any
content please inform us to keep away from any detriment to structure without delay.

For and on behalf of


EPTISA Servicios de Ingenieria S.L.

Majid Imran,
Acting Team Leader

Global Head Office Gurgaon Office South Asia Head Office Project Office
Emilio Muñoz, 35-37. Office No. 208 & 209, 2nd Floor, Unit No. 1203, 12th Floor, Kasar Building Ground Floor, Page 1 of 1
28037 Madrid. JMD Regent Square, PS SrijanCorporate Park, Near VipassanaCenter,
T +34 915 949 500 M.G. Road, Gurgaon - 122002, Tower 1, Block EP & GP, Dhammagiri, Igatpuri,
F +34 915 473 934 T +91-124-4056714 Sector V, Salt Lake, PIN – 422 403, Maharashtra
Kolkata – 700091

You might also like