0% found this document useful (0 votes)
43 views

Analysis and Impact of Reviewing and Revisiting SIP

The Nagbalayong National High School reviewed and revisited its School Improvement Plan in February 2020 as required by DepED Order 44. The School Improvement Plan is a three-year plan to improve the school, students, and community. Reviewing the plan allowed the school to identify completed projects and plans needing further work or focus. It also helped the administration set new priorities for continuing to enhance the school.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

Analysis and Impact of Reviewing and Revisiting SIP

The Nagbalayong National High School reviewed and revisited its School Improvement Plan in February 2020 as required by DepED Order 44. The School Improvement Plan is a three-year plan to improve the school, students, and community. Reviewing the plan allowed the school to identify completed projects and plans needing further work or focus. It also helped the administration set new priorities for continuing to enhance the school.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Department of Education
REGION III – CENTRAL LUZON
SCHOOLS DIVISION OF BATAAN
NAGBALAYONG NATIONAL HIGH SCHOOL
NAGBALAYONG, MORONG, BATAAN

Analysis and Impact of Reviewing and Revisiting School Improvement Plan

The issuance of DepED Order 44 s. 2015, entitled Guidelines on the Enhanced School


Improvement Planning (SIP) Process and School Report Card (SRC) set the standards on how to
conduct planning process in school level.
School Improvement Plan is a three-year plan of interventions undertaken with the help of
the community and other stakeholders. The SIP of the School is in its third and final year of
implementation.
Projects programs and activities included in SIP created a great impact in the school, in the

students and in the community. Nagbalayong National High reviewed and revisited SIP last February

17,2020. The school was able to ensure the success of all its learners for the fulfillment of the DepED

mission . The School Community Planning Team (SPT) was able to identify plans that already

achieved and completed. The results of revisit and review may pinpoint what part of school

plans need improvement; what part of the School plan needs attention and focus in order to

complete.

By this activity, the administration may sets priorities for further improvements.

Prepared by:

LYAN MARIE F. GENAVIA


Teacher III
Noted by:

DAVE D. BASTO
School Principal

Address: Cabildo Street, Nagbalayong, Morong, Bataan 2108 | Telephone : (047) 613-6883 | 09380706364
Email Address: [email protected] | Facebook Page:www.facebook.com/nagbalayongnhs2002
Republic of the Philippines
Department of Education
REGION III – CENTRAL LUZON
SCHOOLS DIVISION OF BATAAN
NAGBALAYONG NATIONAL HIGH SCHOOL
NAGBALAYONG, MORONG, BATAAN

Address: Cabildo Street, Nagbalayong, Morong, Bataan 2108 | Telephone : (047) 613-6883 | 09380706364
Email Address: [email protected] | Facebook Page:www.facebook.com/nagbalayongnhs2002

You might also like