Color Code Instruction
Color Code Instruction
Page: 1 NKDA-OPS/07-12/FEB/Revised 06
Annexure - II
Plot area & Ground a. Plot area must be demarcated using poly line (enclosed) and the color of
the poly line should be 240.
coverage area b. Ground coverage area must be demarcated using poly line (enclosed) and
the color of the poly line should be 230.
c. Front side must be drawn in color 13 and using poly line/line.
Plot Side Dimension d. Rear side must be drawn in color 23 and using poly line/line.
e. Side 1. side must be drawn in color 33 and using poly line/line.
f. Side 2. side must be drawn in color 43 and using poly line/line.
Principal use a. Must be drawn in layer named “principal”.
b. Area considered as principal use ,must be drawn in poly-line
and colored by the range of color from 100 to 150
Ex.- the color of the poly-line representing the ground floor is 100.
c. Area are not to be consider or like to subtracted from
principal use, to be drawn in same color as colored for the
principal use, with the line thickness 0.5
d. Mezzanine floor must be drawn in color 93 and using poly
line. And must be drawn in layer named “principal”
Floor Area Details
e. Mezzanine floor Area are not to be consider or like to
subtracted from principal use, to be drawn in same color as
colored for the principal use, with the line thickness 0.5 .
Page: 2 NKDA-OPS/07-12/FEB/Revised 06
a. To represent a inter space you have to draw a line between
Inter space for two lines.
b. Put the names of the buildings (A1, A2, B3, C7…etc.) by the
multiple side of the building line.
c. Make groups of these three elements (one line and two text
building elements representing the building names.)
d. Do not create any other group to represent something else.
Building Height a. Building height must be demarcated using line/poly line in the drawing.
b. The color of the building height is 250.
c. For only one block in the premises the building height must put only once.
d. For multiple blocks in the premises the building height put in each block detail
drawing with no repetition.
Car parking Details a. In drawing the car must be indicated as Triangle and drawn using poly line
b. Individual cars should be drawn in color 25.
c. Cars within the cover region drew using line thickness 0.5.
d. Cars within the open region drew using line thickness 0.25
e. Covered car parking areas including driveway should be shown using enclosed
poly-line in color 45 with line thickness 0.25.
f. Any area need to be subtracted from covered car parking areas should be
drawn in color 45 with line thickness 0.50.
g. All these details should be drawn in a single file.(preferably in master plan
drawing)
Internal Road a. Length of the Internal Road should be drawn in color 46 using poly line along
the center of the road.
b. The width of the internal road should be demarcated as a line having color 47.
Basement a. Service area in basement must be drawn in color 96 (for first level basement)
and 97 (for second level basement).
b. Parking area in basement including driveway must be drawn in color 98 (for
first level basement) and 99 (for second level basement)
c. Basement for floor must be drawn in color 200 (for first level basement) and
201 (for second level basement)
Note: - 1. AutoCAD version 2004/ 2005/ 2006 must be installed to run the OPS software.
2. The AutoCAD drawing when prepared for online submission should not use any color other than
white for any layer.
4. All the floor plans should contain detailed dimension.( mentioning room sizes only is not enough) .
Page: 3 NKDA-OPS/07-12/FEB/Revised 06
Annexure – III
INSTRUCTIONS AT A GLANCE
Mixed for Floor(0-50) : Area 100-150 Poly Line, Layer name ‘mixed’
Predominant for Floor (0 - : Area 100-150 Poly Line, Layer name ’principal’
50)
Facility Area (0 – 50) : Area 100-150 Poly Line, Layer name ‘facility’
Utility Area (0 – 50) : Area 100-150 Poly Line, Layer name ‘utility’
Front Open Space : Length, 53(53-62) Line/Poly Line and text represent
text the corresponding building name.
Rear Open Space : Length 63(63-72) Line/Poly Line and text represent
,text the corresponding building name.
Side 1 Open Space : Length, 73(73-82) Line/Poly Line and text represent
text the corresponding building name.
Side 2 Open Space : Length, 83(83-92) Line/Poly Line and text represent
text the corresponding building name.
Page: 4 NKDA-OPS/07-12/FEB/Revised 06
Inter Space : Length,text Other than Making groups of line and texts
mentioned color indicating building name.
code
Building Height : Length 250 Line/Poly Line
Page: 5 NKDA-OPS/07-12/FEB/Revised 06
Annexure – IV
1. Water demand calculation will have to be done assuming 200 lpcd for residential population and 65 lpcd
2. Sewerage line & drainage line will have to be shown separately in one drawing sheet and water supply
3. Position of departmental (P.H.E) water pipe line, manhole, master trap, sewerage line etc. to be shown
4. For plots more than 1500 sqm. where the length of sewer and drainage line are significant, invert levels
5. Capacity and dimensions of O.H.R, U.G.R and Fire Tank should be clearly given along with plan,
elevation and cross section in the drawing and that should satisfy the required demand.
6. Final approval of the service drawings are to be given by the P.H.E Department.
7. Location of UGR should be such that the PHED/WBHIDCO/NKDA authorities will have free access
8. Top of Manhole at least 300mm above adjacent GL, overflow line should be above GL.
Page: 6 NKDA-OPS/07-12/FEB/Revised 06
Annexure –V
a) In residential building – number of tenement per floor and total number of person in building and
b) For commercial building – Total carpet area of the building and number of person @10 sqm/person
and 65 liter/cap/day.
2. According to the demand calculation volume of reservoir should be checked with a total capacity of one
3. Portion of ferrule connection shown in the drawing should be checked with P.H.E’s water supply line or
pipe line
4. Within the premises there should be at least 4” X 4” free space over the supply line for installation of
water meter and that should be free approachable for any one.
5. The R.L on top of manhole covers such that there should not be any chance for contamination of UGR
6. The overflow line from UGR should be at least 100 mm over than surrounding GL so that there would
not be no chance of back flow of surface run off and contamination of UGR water.
7. There should be at least 300 mm free board in UGR from over flow line.
8. Over flow line should not be covered and while excess water from UGR drain out from the nearer
saucer drain that should not covered so that its over flowing of water can be easily visible to any habitants.
Page: 7 NKDA-OPS/07-12/FEB/Revised 06
Annexure –VI
1. There should be separate line for sanitary sewage and storm drainage.
4. Position of manhole shown in the drawing should be checked with P.H.E’s drawing.
5. Invert level of the master trap should be given in the drawing and the R.L of outfall or discharge point
6. Sanitary sewer line and storm sewer line should not intersect but if it is unavoidable then R.L of
intersection point should be check and that should not be at same level.
7. Position of discharge point of storm drainage shown in drawing should be checked with P.H.E’s
Page: 8 NKDA-OPS/07-12/FEB/Revised 06