1.0 INTRODUCTION
2.0 SCOPE
This specification establishes the design, installation and testing requirements for steam
tracing systems of pipes containing fluids, which has to be maintained at particular
temperature. It also keeps the temperature high enough for free flow of fluid and proper
pumpability. The pipelines requiring steam tracing will be indicated in P & ID's & Line-list.
Steam supply for tracing can be obtained from process steam lines or independent steam
supply header. In any case the source shall be such that tracers always get steam even if
other units are out of operation. As far as practicable, steam supply header shall be laid
such that lines requiring steam tracing are at minimum distance from the header.
)
3.3. Material
The material to be used for Steam Tracing shall confirm to Piping Material
Specifications Class
Title: Steam Tracing Specification Page 4 of 14
Supply manifolds shall be located conveniently to minimize the length of the supply
leads serviced b y it. The length of supply lead shall not exceed 15 mtrs. Manifold
shall be provided when three or more tracers are required
Tracers shall be routed to suit field conditions with due consideration to operation
and maintenance requirements.
3.7. Tracers
6" NB to 16" NB 2
Stam
Pressure (PSIG) 20 50 100 150
Tracing Length
(Meters) 30 45 60 75
Title: Piping Steam Tracing Specification Page 5 of 14
3.9. Installation.
a) The tracers shall be held in position by three turns of 16 SWG soft annealed
galvanized i r o n wire spaced every one meter. Galvanized i r o n wire used
shall confirm to IS - 280.
c) The position of the tracers around the traced pipe shall be as per Fig 1 & 2.
f) The tracers shall start at the highest point in a system in general. As far as
possible tracers shall be routed with a continuous slope towards trap. Total
2
pocket depth shall not exceed 1000mm for 1.0 kg/cm of differential
pressure available. The tracer pocket depth shall be the distance the tracer
rises in the direction of flow from a low point to high point.
g) The tracers shall be laid so as not to interfere with the normal working,
operation and maintenance of plant machinery.
h) The installation i n offsites shall be done to take care that the valves and
steam traps on supply and return manifolds are easily approachable. In any
case not more than 12 off takes shall be served by one supply or
condensate manifold.
Title: Piping Steam Tracing Specification Page 6 of 14
i) The steam supply lead lines shall be routed together, as far as possible. In
case of several tracers routed together, the spacing between individual
tracers may be reduced to allow box type insulation. However the spacing
shall be adequate in all cases to permit good welding and individual
clamping by U clamps, or other approved type of fastener.
j) The tracers shall be anchored at the middle point of the tracer run and ample
free space shall be provided for the expansion of tracers at the free ends as
shown in Fig.1.
5.0 TESTING
All tracers shall preferably be tested along with the steam piping to which they are
connected. In cases where tracers are not tested with the feed steam piping, separate
hydrostatic test shall be performed with test pressure in accordance with ASME B
31.3.
6.0 INSULATION
Insulation thickness material and method of application shall be as specified in
Insulation Standard I Specification. Tracer along with main pipe shall be insulated
together. Steam tracers from steam supply stations upto the entrance to main pipe
shall be insulated as steam pipe of the size encountered. The condensate return line
from the exit of the main pipe upto the condensate manifold shall be insulated for
personal protection.
Title: Piping Steam Tracing Specification Page 9 of 14
Title: Piping Steam Tracing Specification Page 10 of 14
Title: Piping Steam Tracing Specification Page 11 of 14
Title: Piping Steam Tracing Specification Page 12 of 14
Title: Piping Steam Tracing Specification Page 13 of 14
Title: Piping Steam Tracing Specification Page 14 of 14
Abbreviations: