0% found this document useful (0 votes)
49 views

Invoice

This document is a furniture proposal from William Tanaka containing pricing and payment terms. It provides an itemized list of furniture for different rooms including living room, kitchen, and two bedrooms. The total proposed price is Rp124,000,000 with a 50% down payment required upfront and the remaining balance paid in installments after delivery, installation, and retention period. The proposal is valid until agreed upon by both parties.

Uploaded by

bintaro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Invoice

This document is a furniture proposal from William Tanaka containing pricing and payment terms. It provides an itemized list of furniture for different rooms including living room, kitchen, and two bedrooms. The total proposed price is Rp124,000,000 with a 50% down payment required upfront and the remaining balance paid in installments after delivery, installation, and retention period. The proposal is valid until agreed upon by both parties.

Uploaded by

bintaro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Kepada : Mrs.

Dewi
Hal : Penawaran FURNITURE
Project : Lloyd
Tanggal : 29 Mei 2022

NO PEKERJAAN UKURAN UNIT VOLUME HARGA/UNITE JUMLAH


A. LIVING ROOM (HPL TACO + TACO SHEET)
1 Panel Belakang TV 3,85 x 2,39 1 9,2 Rp 725.000,00 Rp 6.670.000,00
2 Kabinet Pajangan Samping TV 0,6 x 0,34 x 2,75 1 2,75 Rp 2.500.000,00 Rp 6.875.000,00
3 Cabinet Bawah TV 3,5 x 0,4 x 0,34 1 3,5 Rp 2.500.000,00 Rp 8.750.000,00
4 Koef Curtain 2,53 x 0,2 x 0,35 1 1 Rp 1.250.000,00 Rp 1.250.000,00
5 Koef Curtain Meja Makan 2,1 x 0,2 x 0,35 1 1 Rp 1.250.000,00 Rp 1.250.000,00
B. KITCHEN (HPL TACO + TACO SHEET)
1 Cabinet Kulkas 1,05 x 0,7 x 2,75 1 2,9 Rp 2.500.000,00 Rp 7.250.000,00
2 Cabinet Tambahan Atas Dapur 1,1 x 0,4 x 0,575 1 1,11 Rp 2.500.000,00 Rp 2.775.000,00
3 Biaya Ganti Pintu Kabinet Atas Dapur 1,15 x 0,02 x 1,375 1 1,58 Rp 800.000,00 Rp 1.264.000,00
4 Cabinet Dispenser 0,44 x 0,75 x 2,75 1 2,75 Rp 2.500.000,00 Rp 6.875.000,00
5 Island 1,9 x 0,75 x 0,84 1 1,9 Rp 2.500.000,00 Rp 4.750.000,00
6 Top Table Island Solid Surface 1,88 x 0,75 1 1,88 Rp 2.200.000,00 Rp 4.136.000,00
C. MASTER BEDROOM (HPL TACO + TACO SHEET)
1 Divan 2 x 1,9 x 0,3 1 3,8 Rp 2.000.000,00 Rp 7.600.000,00
2 Nakas 0,97 x 0,45 x 0,5 1 1 Rp 2.500.000,00 Rp 2.500.000,00
3 Lemari Baju 1,15 x 0,6 x 2,7 1 3,105 Rp 2.650.000,00 Rp 8.228.250,00
4 Bench + Dudukan Busa (Kain idefab) 1,47 x 0,46 x 0,7 1 1,47 Rp 2.500.000,00 Rp 3.675.000,00
5 Meja Rias 0,8 x 0,45 x 0,7 1 1 Rp 2.500.000,00 Rp 2.500.000,00
6 Cermin Meja Rias 0,5 x 0,66 1 1 Rp 1.750.000,00 Rp 1.750.000,00
7 Headboard Busa 2,27 x 2,67 1 6,06 Rp 1.250.000,00 Rp 7.575.000,00
8 Panel Dinding Samping Head Board 1,015 x 2,75 1 2,8 Rp 1.000.000,00 Rp 2.800.000,00
9 Koef Curtain 2,5 x 0,35 1 2,5 Rp 1.250.000,00 Rp 1.250.000,00
D. BEDROOM 2 (HPL TACO + TACO SHEET)
1 Divan 2,4 x 1,7 x 0,35 1 4,08 Rp 2.000.000,00 Rp 8.160.000,00
2 Cabinet Belakang Kasur 1,8 x 0,26 x 2,75 1 5,1 Rp 2.250.000,00 Rp 11.475.000,00
3 Lemari Baju 1,6 x 0,6 x 2,75 1 4,4 Rp 2.500.000,00 Rp 11.000.000,00
4 Koef Curtain 2,4 x 0,35 1 2,4 Rp 1.250.000,00 Rp 1.250.000,00
5 Pengadaan Saklar dan Stopkontak Tambahan (Standard) FREE
6 LED Strep FREE
Instalasi + Mobilisasi Rp 2.500.000,00
TOTAL Rp 124.108.250,00
TOTAL (Pembulatan) Rp 124.000.000,00

Note:
* Rel laci semua menggunakan Rel knockers soft close
* Engsel pintu menggunakan engsel setara knockers
* Finishing luar kabinet HPL setara TACO
* Finishing dalam kabinet TACO SHEET
* Penawaran tidak termasuk pekerjaan di luar list di atas
* Harga belum termasuk wallpaper dan pemasangannya
* Harga tambahan lampu spot plafon dan lampu gantung

Term Payment
Grand Total Produksi Rp 124.000.000
DP 1 Start Produksi (50%) - Biaya Gambar Rp 50.000.000
DP 2 After Delivery (20%) Rp 24.800.000
After Instalation (25%) Rp 31.000.000
After Retention (5%) Rp 6.200.000

Pembayaran dilakukan ke No. Rek. BCA a/n William Tanaka : 288.931.1368


Bukti pembayaran mohon untuk di WA ke no. 081388831368

Warmest Regards,
William Tanaka

You might also like