Check List For DPR Preparation of Rural Roads in Hilly Areas
Check List For DPR Preparation of Rural Roads in Hilly Areas
PART - I
3 4 5 6 1 2 3 4 5 6 7 8 9 10 11
Alignment
Design
1 2 3 4
C
5 6 7 8 9 10
11 1 2 3
D
Is area subjected to flooding Source of materials with lead Source of alternate/waste materials Quality of materials Whether test results available Location of quarry if new Redevelopment of newly opened quarry Haul roads Storage of materials if out side the ROW Provision for salvage of top soil and its reuse No. of water Crossings Details of crossing No. of culverts Maximum afflux as per design Surface water flow Subsurface drainage Site for Camp for construction Approximate no. of workers expected Water for construction Design of Junctions Provision of Cattle crossings Side Ramps if any Bus Bays Bus Stand at destination Provision for turning radius at end Widening for storing materials Plantation scheme Scheme to contain induced development Provision for signs on working drgs.
2 1 1 2 1 1 1 1 1 2 2 1 2
Carriageway width
4 5 6 7 8
Drainage Works
3 4 5 6
Others
1 2 3 4 5
G
6 7 8 9 10 11 12 13
4 4 3 3
3 3 4
4 4 4 4 4 4 4 4 4
3 4
4 4
4 4
4 4 4 3
3 4