Check List For DPR Preparation of Rural Roads in Hilly Areas

This document provides a checklist for preparing a detailed project report (DPR) under PMGSY guidelines. It is divided into 7 sections covering key project details like the alignment, design, carriageway width, drainage works, and others. Each item is assigned a priority level of high, medium-high, medium-low, or low to guide the level of detail required in the DPR. The checklist aims to capture all essential information needed for the road project development and implementation.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
390 views4 pages

Check List For DPR Preparation of Rural Roads in Hilly Areas

This document provides a checklist for preparing a detailed project report (DPR) under PMGSY guidelines. It is divided into 7 sections covering key project details like the alignment, design, carriageway width, drainage works, and others. Each item is assigned a priority level of high, medium-high, medium-low, or low to guide the level of detail required in the DPR. The checklist aims to capture all essential information needed for the road project development and implementation.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

PRIORITY CHECK LIST FOR PREPARATION OF D.P.R.

UNDER PMG GUIDELINES


PRIORITY LEVEL INDEX 1 2 HIGH MED-H

PART - I

State/ District/ Development Block Name of Road


1 2 Villages to be Connected NRRDA approval of Core Net Work Length in km. Estimated Cost Total Roadwork cost CD works cost Topographical details Design speed adopted No of curves Radii of curves horizental Length of transition curves Heavy cuts and fills if any Parallel drains 0ut fall Impact on erosion Side slope gradient in deserts/hills Water bodies/ local tanks if affected Formation width Height of embankment Width at toe line Location of borrow areas Source of embankment soil Format4 of SP20 available If soil meets the requirements Does it needs modification Source of modifier with lead Other local/waste materials if any
1 1 1 1 2 1 2 1 1 2

3 4 5 6 1 2 3 4 5 6 7 8 9 10 11

Alignment

Design
1 2 3 4
C

5 6 7 8 9 10

11 1 2 3
D

Is area subjected to flooding Source of materials with lead Source of alternate/waste materials Quality of materials Whether test results available Location of quarry if new Redevelopment of newly opened quarry Haul roads Storage of materials if out side the ROW Provision for salvage of top soil and its reuse No. of water Crossings Details of crossing No. of culverts Maximum afflux as per design Surface water flow Subsurface drainage Site for Camp for construction Approximate no. of workers expected Water for construction Design of Junctions Provision of Cattle crossings Side Ramps if any Bus Bays Bus Stand at destination Provision for turning radius at end Widening for storing materials Plantation scheme Scheme to contain induced development Provision for signs on working drgs.
2 1 1 2 1 1 1 1 1 2 2 1 2

Carriageway width

4 5 6 7 8

Detailed project report


1 1 2

Drainage Works

3 4 5 6

Others
1 2 3 4 5
G

6 7 8 9 10 11 12 13

FOR PREPARATION OF D.P.R. UNDER PMGSY GUIDELINES


PRIORITY LEVEL INDEX 3 4 MED-L LOW

4 4 3 3

3 3 4

4 4 4 4 4 4 4 4 4

3 4

4 4

4 4

4 4 4 3

3 4