100% found this document useful (1 vote)
389 views

Non Conformance Report

This document is a non-conformance report template used for construction projects. It contains sections for reporting the project details, describing the non-conformance, proposed corrective actions, follow-up on implementing those actions, and sign-offs from relevant parties.

Uploaded by

umar baba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
389 views

Non Conformance Report

This document is a non-conformance report template used for construction projects. It contains sections for reporting the project details, describing the non-conformance, proposed corrective actions, follow-up on implementing those actions, and sign-offs from relevant parties.

Uploaded by

umar baba
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Client:

Non Conformance Report


Construction Supervision Consultant:
Doc. No.:
Rev.:
Rev. Date:
Contractor:

Project no. & Title:


Color Code for Filling this Report: Consultant Contractor/Department Head
Report No.: Date: Type: Major Minor
Source of Non Conformance: Inspection Audit Others

Evidence(Documents/Pictures/ Records etc.):


Attachments:

Date:

Initiated/Audited by (Sign.): Received by (Sign.):

Name: Name:
Designation: Date: Designation: Date:
Proposed Corrective Action: Target Date:

Submitted By (Sign.): Received By (Sign.):

Name:
Designation: Date: Designation: Date:
Approval Authority Decision Regarding Corrective Action: Approved Disapproved
Remarks In Case of Approval/ Comments or Suggestion In Case of Disapproval

Dispatched to site on Date: Person:


Implementation of Corrective Action (1st Follow Up): Accepted Rejected Repair Rework
Implementation of Corrective Action (2 Follow Up):
nd
Accepted Rejected Repair Rework
Implementation of Corrective Action (3rd Follow Up): Accepted Rejected Repair Rework

RESIDENT ENGINEER SENIOR ENGINEER QUALITY MANAGER


TEAM LEADER

Remarks

Signature:

Date:
Distribution:

You might also like