BCL02 Checklist - Setting Out

This checklist documents an inspection of the setting out of buildings for the Engineering Work Shop Building at the Bus Depot in Kegalle. It checks that the base lines, dimensions, and profile boards are set correctly in relation to the existing structures and according to the specified standards. Any defects identified are to be rectified and re-inspected.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
136 views

BCL02 Checklist - Setting Out

This checklist documents an inspection of the setting out of buildings for the Engineering Work Shop Building at the Bus Depot in Kegalle. It checks that the base lines, dimensions, and profile boards are set correctly in relation to the existing structures and according to the specified standards. Any defects identified are to be rectified and re-inspected.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Checklist No Issue No: 01

BCL02 Date: 29-06-2010 CHECK LIST FOR SETTING OUT OF BUILDINGS


Project Engineering Work Shop Building - Bus Depot at Kegalle Re-checked date Checking Event No:
Section/area Checked after rectification
Date of Check
Result of Rectification of
SL Item Inspection Defects Identified Defects
No
OK Not OK Not
1 Level of the site

2 Base Lines off sets from existing structure

3 Parallel/perpendicular to existing structure

4 Length/width

5 Diagonal checks

6 Cross Checking of dimensions @ 3-4 locations

7 Profile Boards concreted (pegs)

8 TBM (Nos…………)

9 TBM distance form building

10 TBM are fixed permanently (Cl 2.2.1.1 SCA /4/I)


Comments:

TO/WS SE