This checklist documents an inspection of the setting out of buildings for the Engineering Work Shop Building at the Bus Depot in Kegalle. It checks that the base lines, dimensions, and profile boards are set correctly in relation to the existing structures and according to the specified standards. Any defects identified are to be rectified and re-inspected.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
136 views
BCL02 Checklist - Setting Out
This checklist documents an inspection of the setting out of buildings for the Engineering Work Shop Building at the Bus Depot in Kegalle. It checks that the base lines, dimensions, and profile boards are set correctly in relation to the existing structures and according to the specified standards. Any defects identified are to be rectified and re-inspected.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1
Checklist No Issue No: 01
BCL02 Date: 29-06-2010 CHECK LIST FOR SETTING OUT OF BUILDINGS
Project Engineering Work Shop Building - Bus Depot at Kegalle Re-checked date Checking Event No: Section/area Checked after rectification Date of Check Result of Rectification of SL Item Inspection Defects Identified Defects No OK Not OK Not 1 Level of the site
2 Base Lines off sets from existing structure
3 Parallel/perpendicular to existing structure
4 Length/width
5 Diagonal checks
6 Cross Checking of dimensions @ 3-4 locations
7 Profile Boards concreted (pegs)
8 TBM (Nos…………)
9 TBM distance form building
10 TBM are fixed permanently (Cl 2.2.1.1 SCA /4/I)