The document outlines a schedule for constructing a commercial building using MS Project. It details 31 tasks needed to complete the project including site clearing, excavation, concrete work, masonry, structural steel installation, roofing, electrical work, and meetings. It also lists the resources like laborers, equipment, and materials needed and their costs to perform each task. The schedule accounts for task dependencies, durations, and resource assignments to plan and track the project from start to completion.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
53 views
Yibe 1
The document outlines a schedule for constructing a commercial building using MS Project. It details 31 tasks needed to complete the project including site clearing, excavation, concrete work, masonry, structural steel installation, roofing, electrical work, and meetings. It also lists the resources like laborers, equipment, and materials needed and their costs to perform each task. The schedule accounts for task dependencies, durations, and resource assignments to plan and track the project from start to completion.