Nature of IT Project
IT project
responsibilities for the conclusion of an institute’s certain information technology goals (Rouse,
2015).
network improvements, hardware installation, cloud computing, business analytics and data
In tallying to the typical problem that can made the project to fail, factor that can badly a
affect the success of an IT project advances comprises of the advances in technology through the
project’s implementation, framework changes that affect security and data management. IT
project may also accede to the first-use penalties which signify the overall risk an organization
undertakes when executing a new technology for the first time. Because the technology has not
yet been fully executed or used before by the organization, there will be likely to be a
There are numerous diverse methods in managing an IT project that affect the project life
cycle. Organization can use one of these methods to help in lessen the risk of expensive rework,
changing technology and expansive planning during the presentation of the project. The project
life cycle of usual IT project went from iteration of planning, implementation and controlling
until the project is closed and shifted into operation (Rouse, 2015).
According to Rouse (2015) there are three distinct IT project management life cycles:
PROJECT MANAGEMENT A1 (RA1) 3
Adaptive life cycle. This project life cycle also utilize iteration of planning and
implementation, though the planning normally lasted for about two weeks. This approach uses a
rolling wave of planning and implementing through short rushes of both planning and
implementing. Change is anticipated in this method to the IT project which is idea for software
Predictive Life cycle. In this approach the project manager and team firstly define the
project scope, project roster, and estimated project costs before the project implementation
initialize. As being part of the project planning it is normal for the phases of the project to be
defined. In order for the project to transition from its initiation phase to its ending phase each
phase must be definite and concluded in the specific order as scheduled (Rouse, 2015).
Iterative life cycle. ‘This approach requires the project management to be defined firstly
in the project, though cost planning and activity length estimation are planned at higher level
early in the project. As the project implementation occurs costs and period estimates are made
for the most forthcoming work through iteration of planning. The iterative life cycle also plans
for iteration of benefits released to the organization. For instance an iterative life cycle would
design new software with additional features with each new release as part of project’ (Rouse,
2015).
IT Project Implementation
Project Introduction
Steam is a digital distribution owned and develops by Valve Corporation, which feature
multiplayer gaming, digital right management (DRM), social networking and video streaming.
Steam also offer the users with installation and automatic update of games through its platform
and social features like in-game chat and voice chat ("Steam", n.d.).
PROJECT MANAGEMENT A1 (RA1) 4
IT Project overview
Before Steam initial release, Valve Corporation had made their game online via the
internet. Example of their game would be Counter-Strike. However Valve had issue in updating
its online games, where when the game are being patch will result in most of the online player
In an effort to resolve this issue, Valve has made a solution in making an online platform
that has function to update games automatically apply a better anti-piracy and anti-cheat
Lastly Valve has rocky relationship with its Publishers and somewhat gotten worsen as
number of publishing companies has lessen through the industry-wide consolidation of the late
1990’s. Also, the distributor usually charges substantial placement fees for premium shelf space
and endcaps (Case, 2002). ‘The net result is that the actual developer may only see $7-8 of the
Technical Feasibility. Valve has conducted a survey at their website, which their
founding was that there are as many as 75% of their have broadband connections though it
unclear however as online survey are famously self-selecting. On the other hand some countries
is drastically building huge broadband framework. Let take example like in South Korea, about
60% of its household has broadband connection, this is because the Korean government has
goals which is getting 80% penetration of 20 megabit connections by 2005 (Case, 2002).
company was founded, which means Valve Corporation has no outside finance to fund its
PROJECT MANAGEMENT A1 (RA1) 5
project, as Valve Corporation use the reason of self-funding to have freedom to shape the
Initiation Phase. In order to make sure the buyers made by Valve were pleased and
having the best gamin experience, they decide to create Steam as the solution to the problem.
Steam was created to grip several projects itself as well as connecting hub for gamers
nationwide. Through Steam, Consumers are able to get efficient matchmaking with other users.
Steam allows the user to buy games online through its platform; this concept gives the consumer
The gaming industries are massive, and this also has effect for any business that has
digital content. Traditional Publisher is been seen to lose the most, because the source of their
income could potentially dry up. Retailers may also lose its revenue, though there exist an
opportunity for making up some of the loss by selling Steam subscription. The developer would
gain a lot from this as not only developer gain just revenue but also for total creative and
financial control of their projects. User has better gaming experience and does not have to worry
This factor below need to be considering the project team as it has potential pitfall. Issues
of privacy will be inevitable because Steam application can track usage models, and there no
stopping a company from selling the data to the other institute. On how smooth will the Steam-
enable application let for user-made mode is uncertain. If user mods cannot be install easily, this
will resulted in situation similar to Half-life; Counterstrike is a user-made mod, if it wasn’t for
PROJECT MANAGEMENT A1 (RA1) 6
Counterstrike, Half-life would be just remember as just normal Shooter game from the past
(Case, 2002).
information regarding Valve finance. Though Valve has allowed developer to offer number of
Prevent cheating, as the content is located and manage by the central server.
Making sure the patches and other data are automatically downloaded so that
everyone has the same version of the game. In case when an update broke
Developer can track the usage model, so that they can see how the player plays
the game. This is for the developer to make improvement on adding and making
new content.
Implementation Phase. The steam client made available for public beta testing at
January 2003 during the dated of Counter-strike 1.6 beta, which is mandatory to be install and
use. During that time its primary task was streamlining the patch process common in online
computer games (Au, 2015). Steam is an optional part for all the games; 80,000-300,000 players
tested the system during the beta period (Bode, 2003). The system and website clogged under the
strain of thousands of players spontaneously attempting to play the latest version of Counter-
PROJECT MANAGEMENT A1 (RA1) 7
Strike (Bode, 2003). In 2004, Steam replaced World Opponent Network. The online features of
games which required World Opponent Network stop working unless they are converted to
there are varieties of tools accessible to aid with completing task and performing responsibilities.
Some tool requires the use of computer software and other can be utilizing manually. Project
manager should use the tool that suit with their management style. There is no single tool
addresses all what the manager needs. Program Evaluation Review Technique (PERT) and Gantt
Charts the normally used project management tools and both of these tools can be produces
Project Plan
A project plan is a document function to monitor the control and the implementation of a
project. In terms of IT, project plan refers to the Gantt chart and any other document that shows
project schedule and activities. A project plan are used for the purpose of to communicate and
document stakeholder goods and project expectation, to calculate and control associated risk and
decomposition of work. It commonly used to outline the whole scope of the project and to
ascertain required deliverables for the project. Having comprehensive project deliverables allows
PROJECT MANAGEMENT A1 (RA1) 8
all stakeholders to get the same understanding on the project scope. Each team then knows what
WBS divides each project work and project deliverable into smaller practicable
components. Items at the lower level are name work packages. A work package can be cost
estimated, arranged, controlled individually and monitored. By breaking the larger project into a
smaller one help the project to be well planned, manage and tracked (Chandana, 2017).
Steam should use WBS because they will benefit of the following (Mukund, 2017):
Critical path Analysis is a method that categorizes the activities necessary to complete a
task, including identifying the time needed to finish each task and the relationship between the
task. Also known as critical path Method, critical path analysis helps assist in to predict a project
Steam should use Critical Path Method as the will benefit the following (Sharma, 2015):
Allow the calculation of the float of each every activity. The float tells how long activity
References
https://web.archive.org/web/20150609105517/http://www.salon.com/2002/04/16/modding/
http://www.dslreports.com/shownews/32981
http://www.dslreports.com/shownews/32475
from http://ttps://www.extremetech.com/computing/50650-valve-changes-online-gaming-
rules
project-manager-article
Golze, B. (2004). Valve to shut down WON servers. GameSpot. Retrieved 6 October 2017, from
https://www.gamespot.com/articles/valve-to-shut-down-won-servers/1100-6102754/
http://www.investopedia.com/terms/c/critical-path-analysis.asp
PROJECT MANAGEMENT A1 (RA1) 11
https://www.simplilearn.com/wbs-approach-in-project-management-article
https://www.techopedia.com/definition/24775/project-plan
management
Sharma, R. (2015). Pros and Cons of the Critical Path Method. Brighthub Project Management.
advantages-and-disadvantages-of-critical-path-method/
http://store.steampowered.com/about/
http://www.valvesoftware.com/company/Valve_Handbook_LowRes.pdf