0% found this document useful (0 votes)
62 views3 pages

Instalación Del Turbo

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views3 pages

Instalación Del Turbo

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

2013/04/22 Turbocharger - Install - If Equipped (RENR9703)

SMCS - 1052 i05324841

Installation Procedure
Required Tools
Tool Part Number Part Description Qty
A 6V-6640 Gasket Maker 1

Table 1

NOTICE
Keep all parts clean from contaminants.

Contaminants may cause rapid wear and shortened component


life.

1. Ensure that the turbocharger is clean and free from damage. Inspect the
turbocharger for wear. Refer to Systems Operation, Testing and Adjusting,
"Turbocharger - Inspect" for more information. If the turbocharger is worn, the
complete turbocharger must be replaced.

https://sis2.cat.com/#/detail?
tab=3&ieSystemControlNumber=SEBP73760018&componentId=00000070&serialNumber=GT400916&infoType=8&serviceMediaNumber=RENR97
Illustration 1 g01343533
Typical example

2. Test actuator (6) for correct operation. Refer to Systems Operation, Testing and
Adjusting, "Turbocharger - Inspect". If the actuator is damaged or the actuator does
not operate within the specified limits, the complete turbocharger must be replaced.

3. Clean the mating surfaces of the exhaust manifold. If necessary, install the studs to
the exhaust manifold. Tighten the studs to a torque of 18 N·m (13 lb ft).

4. Install a new gasket (7) to the exhaust manifold.

5. Position turbocharger (5) onto the exhaust manifold and install nuts (8). Tighten the
nuts to a torque of 44 N·m (32 lb ft).
Note: Do not use the actuator rod to lift the turbocharger.

6. Position a new joint (12) and tube assembly (14) onto turbocharger (5). Install bolts
(13) finger tight.

7. The turbocharger has different-sized bolts (13). Tighten M6 bolts to a torque of


9 N·m (80 lb in).
Tighten M8 bolts to a torque of 22 N·m (16 lb ft).

8. Position a new joint (16) onto the cylinder block. Install bolts (15) finger tight.

9. Tighten bolts (15) to a torque of 22 N·m (16 lb ft).


https://sis2.cat.com/#/detail?
tab=3&ieSystemControlNumber=SEBP73760018&componentId=00000070&serialNumber=GT400916&infoType=8&serviceMediaNumber=RENR97
If tube assembly (14) is secured with tube clips, tighten the fasteners for the tube
clips to a torque of 22 N·m (16 lb ft).

10. Lubricate the bearings of turbocharger (5) with clean engine oil through the oil inlet
port. Rotate the shaft of the turbocharger in order to distribute the lubricant.

11. Position tube assembly (3) onto turbocharger (5). Install new washers (2) and banjo
bolt (1) to tube assembly (3). Tighten the banjo bolt finger tight.

12. Install new washers (2) and banjo bolt (4) onto tube assembly (3). Connect the tube
assembly to the cylinder block. Tighten the banjo bolt finger tight.

13. Tighten banjo bolts (1) and (4) to a torque of 20 N·m (15 lb ft).
Note: Ensure that the tube assembly does not come into contact with any other
engine components.

14. The turbocharger is equipped with an adapter (9). Install a new gasket (11) (not
shown) and position adapter (9) onto the turbocharger. Install nuts (10). Tighten the
nuts to a torque of 44 N·m (33 lb ft).

15. Connect the air outlet hose to turbocharger (5).


If the engine is equipped with an air pipe, install the air pipe and install the gasket to
the cylinder head. Apply Tooling (A) to the fasteners for the air pipe. Tighten the
fasteners to a torque of 22 N·m (16 lb ft).

Tighten the hose clamps to a torque of 5 N·m (44 lb in).

Note: If the air outlet hose has a reflective heat shield, ensure that the reflective
heat shield is installed toward the engine.

16. Connect the air inlet hose to turbocharger (5).

17. If the valve mechanism cover is equipped with a heat shield, install the heat shield.
Tighten the fasteners for the heat shield to a torque of 9 N·m (80 lb in).

EC31-UP, EC41-UP, EC51-UP, EC61-UP, EC71-UP, EC91-UP, ECL1-UP, GT21-UP,


GT31-UP, GT41-UP, GT51-UP, GT61-UP, GT91-UP, GTH1-UP, N3C1-UP, N3X1-UP,
N4D1-UP, N4E1-UP, N4R1-UP, N4X1-UP, NCC1-UP, NCD1-UP, NCE1-UP, PNR1-UP,
PR51-UP, PR61-UP, PR91-UP, PRD1-UP, SM61-UP, X3B1-UP, XYC1-UP, XYD1-UP

PSP-000302AA
2021/04/08
15:02:20-05:00
i05324841
© 2021 Caterpillar Inc.
Caterpillar:
Confidential Green

https://sis2.cat.com/#/detail?
tab=3&ieSystemControlNumber=SEBP73760018&componentId=00000070&serialNumber=GT400916&infoType=8&serviceMediaNumber=RENR97

You might also like