Work Procedure For CCB Proposed Inside Staircase Working Platform
Work Procedure For CCB Proposed Inside Staircase Working Platform
Purpose
● PROJECT CODE : B50532EA
● PROJECT NAME : MASINLOC POWER PLANT EXPANSION □ For Information
Davidson Nam, Ki
J.W Do J.H.Lee H.S.Woo
A For Approval July 1, 2017 Emil Cortez Estipular Yoon
Contractor
Masinloc Power Plant Expansion Project Doc. No 0–WD862–CA731–00338
WORK PROCEDURE FOR THE PROPOSED Rev. No.
WORKING PLATFORM INSIDE STAIRCASE C
Page 2 of 24
TABLE OF CONTENTS
1.0 PURPOSE………………………………………………………………….. 3
2.0 SCOPE……………………………………………………………………… 3
1.0 Purpose
This procedure is to establish guideline for the construction of Working platform inside the
Staircase in order to facilitate the construction of the Permanent Stair and Landing in Central
Control Building South East and South West Portion.
2.0 Scope
This procedure is applicable in accordance with the attached drawing intended for the
construction of the Proposed Working Platform inside the Staircase of Central Control Building.
2.1 PROCEDURE
a. Survey Works
b. D25 – Steel Reinforcement Dowel Installation
c. 2 x 4 - Wooden Girt & Joist Installation Works
d. 19 mm thick Plywood Sheeting Works
3.2 VPCI Project EHS Manager shall ensure safe implementation of this procedure promoting an
Incident and Injury free environment.
3.3 VPCI & GTC Global Inc. QA/QC Engineer shall be responsible for the proper
implementation of construction standards. Ensure that this written method statement
and corresponding inspection of this particular work shall be carried out respectively.
3.4 GTC Global Inc. Construction Manager – shall have the overall responsibility for the
direction, monitoring, coordination and control of all the construction activities attached
and related to this work and the overall Health and Safety procedure.
3.5 GTC Global Inc. HSE Supervisor along with the Safety Officer shall ensure
implementation of all safety procedures, safety measures related to the nature of works
being carried out and in accordance with the HSE Plan.
3.6 GTC Global Site Supervisor shall be directly involved in the planning and execution of
the activities. He shall be responsible for the preparation of work plan, safety action
plan and safety as required.
Masinloc Power Plant Expansion Project Doc. No 0–WD862–CA731–00338
WORK PROCEDURE FOR THE PROPOSED Rev. No.
WORKING PLATFORM INSIDE STAIRCASE C
Page 4 of 24
4.0 Resources
4.1 Manpower
Construction Manager 1
Site Manager 1
QA/QC Engineer 1
QA/QC Inspector 1
Site Engineer 1
Safety Supervisor 1
Safety Officer 2
Surveyor 1
Survey Aide 2
First Aider 1
Foreman 1
Carpenter 4
Steel Man 2
Helper 4
Auto level 1
Hammer As
Required
Total Station 1
D25 Steel As
Reinforcement Dowel Required
Wood Lumber As
Required
19 mm Thick Plywood As
Required
Masinloc Power Plant Expansion Project Doc. No 0–WD862–CA731–00338
WORK PROCEDURE FOR THE PROPOSED Rev. No.
WORKING PLATFORM INSIDE STAIRCASE C
Page 5 of 24
5.0 Procedure
5.1 - SURVEYING
5.1.0 All elevation and alignment shall be established by the Surveyor accordingly.
5.1.1 Surveyor shall ensure that the alignment and elevation are properly set and checked
prior to the installation of Steel Reinforcement Dowels.
5.1.2 Survey check shall be conducted by GTC Surveyors to ensure the elevation and
alignments of dowels are properly in placed prior to concrete pouring.
5.2.1 Inside the Staircase North and South Wall, D20 Steel Reinforcement Dowel Bar
shall be installed and will be spaced every 1.0 meter horizontally at the same
elevation.
5.2.2 Reinforcing Steel Bars Diameter 20 mm Dowel dimension shall be as per attached
drawing and will be installed 300 mm below the Third Floor Slab Elevation 19.00
Meters.
5.2.3 Prior to form closure, D20 mm dowel reinforcement installation shall be inspected
and approved by GTC QC Engineer.
5.2.4 Plywood form will be used as formwork system on the wall. Form dimensions shall
be as per requirement that will facilitate easy installation and removal after the
concrete pouring.
5.2.5 Plywood Forms will be fastened by pipe as horizontal and vertical studs pipe after
elevation and alignment is confirmed.
5.2.6 Sufficient supports and bracings will be provided to keep the form in place to restrain
the lateral pressure during concrete pouring and additional movement imposed by
vibrator during the consolidation of the concrete.
5.2.7 After the concrete pouring of the wall, the form will be removed only after 24 hours
after the concrete pouring.
5.3.1 Check the D20 Steel Reinforcement Dowel Alignment and Elevation
5.3.2 After checking the elevation and alignment of the D20 Steel Reinforcement Dowels
and Adjustment of the difference on the Elevation and Alignment as required for
the installation of the 2 x 4 Wooden Lumber Girt and Joist proceed the Girt and Joist
installation respectively
5.3.3 Install the 2 - 2 x 4 Wooden Lumber Girt on the Top of the D20 Steel
Reinforcement dowel flushed on the surface of the Concrete Wall and fasten with
Concrete Nail to restrain any movement. This Girt shall be installed on both inside
face of the North and South Wall of the Staircase.
5.3.4 After the complete installation of the 2 x 4 Wooden Lumber Girt proceed the 2 x 4
Wooden Lumber Joist Installation which are spaced every 400 mm center to center.
Masinloc Power Plant Expansion Project Doc. No 0–WD862–CA731–00338
WORK PROCEDURE FOR THE PROPOSED Rev. No.
WORKING PLATFORM INSIDE STAIRCASE C
Page 6 of 24
5.4.1 Install the 19 mm thick Plywood Sheet on the top of the 2 x 4 Wooden Lumber Joist.
5.4.2 Plywood Sheet shall be fixed on the Joist by nailing to restrain movement.
5.4.3 After the Plywood Sheeting the Platform is considered complete and will served as
working platform for the next stage of work like Steel Reinforcement Installation
and Form Installation.
5.4.5 Proceed for the construction of the Permanent Stair and Landing accordingly.
6.1 All personnel must wear appropriate PPE at all times. Personnel are empowered to stop
work if safety precautions are not in place.
6.2 The Job Site Supervisor shall ensure that all Safety requirements are put in practice, copy of
MS and JHA (Attached) are available on site for guidance and consultation.
6.3 Contractor Safety Representative shall carry out the safety site inspection to ensure the
safety requirements laid out in the safe work plan are followed during and after the completion of
the works.
6.4 Job Site Supervisor and Safety Representative shall be present at all time while works are in
progress.
6.5 Appropriate PTW to be prepared and implemented, modification without OWNER approval is
prohibited.
6.6 Assessed risk as necessary and communicated to concerned parties prior to start of any
work.
6.7 Safety Briefing / Tool Box Talk must be conducted by Supervisors prior to start of work in the
language of workforce.
6.8 Incidents and injuries, damaged to property or near misses should be reported.
6.10 A clear and good communication must be maintained by all personnel involved on the
activity.
6.11 Personnel must be trained/experienced and familiarized with the scope of works to be
undertaken. The location of marshal point must be identified, emergency evacuation procedure
must be clear to all workers exercises must be conducted as required.
6.12 Contractor Safety Manager / Representative shall review Safety Action Plan.
7.0 Attachment
Attachment # 01.
Attachment # 02.
TITLE OF TASK : WORKING PLATFORM INSIDE STAIRCASE SUB-CONTRACTOR : GTC GLOBAL INC. JESA No. :
Revision
Revised by : Authorized Environmental Person(VPCI) : Authorized Safety Person(VPCI) :
Date
Acknowledgement by other crew
Additional Hazards Identified Additional Control Implemented Members
(Yes/No)
WEEK DATE
SAFETY IN-CHARGE (VPCI) SIGNATURE PERMIT No. REMARKS
ST
1
ND
2
RD
3
TH
4
Provide appropriate
resting shelter and
drinking station intended
Heat stroke / Heat stress to the workers involved YES
with the tasks
Safety awareness
regarding heat stroke /
heat stress should be
discuss prior to start the
work
Barricade and signage Proper planning should Used full body harness
4 2 x 4 Wooden Lumber Installation
should be put in place to be initiated prior to start involving working at
for the Girt and Joist the work
warn the public heights
Inspect the equipment
prior to start the activity
Safety briefing and vigilant
Fall Hazard YES
monitoring
Only certified and trained
personnel should involve
to the activity
Proper orientation /
training to the involve
personnel prior to start the
work
Barricade and signage Ensure the area is free Wear proper personal
should be put in place to from any obstruction protective equipment
prior to start the work
warn the public such as, hand gloves,
All materials should be long sleeve, safety shoes, YES
slip / tripping hazard
properly segregated hard hat including safety
Maintain good goggles
housekeeping on
working area
Safety briefing and Wear proper personal
vigilant monitoring protective equipment
such as, hand gloves,
long sleeve, safety shoes, YES
Personal injury (Eye, head, foot, body) Unauthorized personnel
should not be allow to hard hat including safety
goggles
work on working area
Attachment # 03.
Risk Assessment
RISK ASSESSMENT
300MW Masinloc Coal Fired Power Plant
GTC GLOBAL INC. Activity: WORKING PLATFORM INSIDE STAIRCASE
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Minor physical
A. Preparation of Tools and Personal injury (Eye, head, foot, body) 2 2 D Barricade and signage should be put in place to warn the public 1 2 E
injury
Materials
Safety briefing and vigilant monitoring
In case of bad weather condition / heavy rains, work should be stop immediately
Minor physical
Bad weather condition 2 3 C 1 3 D
injury
Always update / monitor the weather condition
Personal injury (Eye, head, foot, body) Minor 2 3 C Safety briefing and vigilant monitoring 1 3 D
physical
Barricade and signage should be put in place to warn the public
injury
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Minor Safety briefing to all personnel prior to start the work
physical 2 3 C 1 3 D
Horse play Assign personnel to continuous monitoring on working area
injury
Remove all unnecessary / scattered materials stowed on the ground working place
Provide planks or any hard plate for the access when installing rebar’s
Minor In case of bad weather condition / heavy rains, work should be stop immediately
Bad weather condition physical 2 2 D 1 2 E
injury Always update / monitor the weather condition
Ensure all manpower should follow the proper manhandling procedure in preparation of
Minor materials
Hit by hand tools physical 2 2 D 1 2 E
injury Use lifting equipment in preparation of materials
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Serious Unauthorized person should not allow to work on working area
physical
Hit by sharp objects 3 5 B 1 5 D
injury / Wear proper personal protective equipment such as; hand gloves, long sleeve, safety shoes,
fatality hard hat including safety goggles
D. 2 x 4 Wooden Lumber Only certified rigger should be rig the materials
Installation for the Girt
and Joist Inspect all lifting gears prior to start the work
Proper orientation / training to the involve personnel prior to start the work
Minor Proper segregation of material should be maintain on working area
Slip / Tripping hazard physical 2 3 C 1 3 D
injury Maintain good housekeeping on working area
Wear proper personal protective equipment such as; hand gloves, long sleeve, safety shoes,
Minor
hard hat including safety goggles
Personal injury (Eye, head, foot, body) physical 2 3 C 1 3 D
injury Unauthorized personnel should not allow to work on working area
Minor In case of bad weather condition / heavy rains, work should be stop immediately
Bad weather condition physical 2 3 C 1 3 D
injury Always update / monitor the weather condition
Likely
4 8 12 16 20
4
Probable
3 6 9 12 15
3
Occasional
2 4 6 8 10
2
Unlikely
1 2 3 4 5
1
Likelihood
Very Low Low Moderate High Very High
12 1 2 3 4 5
Consequence
16 - 25 Unacceptable / Intolerable A
10 - 15 Substantial B
3-5 Tolerable D
1-2 Acceptable E