Date: 2079-06-28

To,
Project Manager,
Nagarjun - Gulliver World J/V

Invoice for Bridge Load Test

Dear Sir/Madam,
Please find herewith the invoice for Bridge Load Test at Pa Khola, Nuwakot

S.No. Item description Unit Quantity Rate (NRs) Amount(NRs)

A Mobilization from KTM to Site Ls 15,000 15,000

B Demobilization from Site to KTM Ls 15,000 15,000

C Bridge Load Test nos 1 80,000 80,000

D Allowances for Engineer days 2 3,000 6,000

E Allowances for Sub-engineer days 2 2,000 4,000

F Allowances for Lab Technician days 2 2,000 4,000

G Vehicle Hold Charge day 1 4,000 4000

H Report Preparation Ls 5,000

Total 133000

Vat @ 13% 17290

Grand Total With VAT 150290

In Words: One Lakh Fifty Thousand Two Hundred and Ninety (Including VAT)

Note:

1. Lodging and Fooding should be provided by Client.

2. Required load and truck and other bridge load accessories should be arranged by client.

3. 50% payment before test and 50% after report submission.

Thanking for the kind consideration,


Sincerely yours,

Suchita Bajracharya
Account Officer
Viswa Consult Pvt. Ltd.
Date: 2079-08-12

To,
Project Manager,
M/S Thegim Galwa JV

Invoice for Bridge Load Test

Dear Sir/Madam,
Please find herewith the invoice for Bridge Load Test at Dhanagadhi

S.No. Item description Unit Quantity Rate (NRs) Amount(NRs)

A Mobilization from KTM to Site Ls 40,000 40,000

B Demobilization from Site to KTM Ls 40,000 40,000

C Bridge Load Test nos 1 100,000 100,000

D Allowances for Engineer days 2 3,000 6,000

E Allowances for Sub-engineer days 2 2,000 4,000

F Allowances for Lab Technician days 2 2,000 4,000

G Vehicle Hold Charge day 1 4,000 4000

H Report Preparation Ls 5,000

Total 203,000

Vat @ 13% 26390

Grand Total With VAT 229390

In Words: Two Lakh Twenty-Nine Thousand Three Hundred Ninety (Including VAT)

Note:

1. Lodging and Fooding should be provided by Client.

2. Required load and truck and other bridge load accessories should be arranged by client.

3. 50% payment before test and 50% after report submission.

Thanking for the kind consideration,


Sincerely yours,

Suchita Bajracharya
Account Officer
Viswa Consult Pvt. Ltd.