Synopsis New
Synopsis New
9/10/2022
OF PROPOSED PROJECT TITLE
–“PURCHASING PROCEDURES IN
GOVT., PUBLIC ORGANIZATION AND
GOVT. UNDERTAKINGS”
Format A
Synopsis (2-3 pages)
(approval of synopsis by guide/supervisor must be attached in the final projecthard copy)
Course name: PGDMM
Enrollment No.: PMM/2021/4400158/BH Study /Exam Centre : Bhilai
Name of the Student: Likendra Kumar verma
Address of the Student: Vill - Mungi, House no. 007, near housing board Po. -Chandkhuri
farm, Dist : Raipur (C.G) 492101
Email Id of the Student : [email protected]/ [email protected] (Approval of
the synopsis would be communicated on the same email Id)
Mobile No. (To be filled mandatorily) : 8770513744
Proposed Title of the Project : Purchasing Procedures in Govt., Public Organization
and Govt. Undertakings.
Problem under study: .(problem you intend to study and where the study will be conducted)
Problem intend to study /Objective of study :-
The objective of the study is to identify the challenges in public procurement and
suggestive measures to be taken for streamlining the system : - A government
entity which is also known as government-owned enterprise or government-owned
corporation or statutory corporation or government-owned-company or nationalised
company in India is a Statutory Corporation, companies and other bodies in which
Government of India has a Financial or Controlling Interest or is established by
the government
India's public procurement market is estimated to be between 20 and 22 per cent of the
GDP, or about $500 billion annually. Therefore, it is utmost important to have an eye on
Procedure and rules to be followed for procurement.
Public procurement covers Public sector enterprises (PSUs), Autonomous bodies,
Statutory bodies, Promotion councils, Boards, Agencies and offices under various
ministries. These all govt bodies procurement activities come under public procurement.
PSUs which comes under Maharatnas, Navratnas and Miniratnas like BHEL, SAIL, BPCL,
Coal India, GAIL, NTPC, RNIL, REC are self-sufficient in their procurement through their
profits. While procurement in govt. institutions are different from PSU ‘s and Private
sectors public limited companies and have less frequency.
LIKENDRA VERMA 1
2 SYNOPSIS
However, in general the following lacking have been observed during initial studies in
procurement of govt. institutions: -
We will analysis the following broad parameters in the Centrally funded technical
institutions, which will give us crux of our study to reach the conclusions.
LIKENDRA VERMA 2
3 SYNOPSIS
Limit for the research Project :- Although research is being done for the centrally funded
technical institutes in Raipur area, we will have a limited contacts over other institutes
and we can have overview of the procedures and problems in a limited manner. Our focal
point for study will be IITBhilai.
Time Period for study : Data of last Financial year (FY 21-22) & 1 st & 2nd Quarters of
(FY 22-23). Existing state of affairs of the organization will be considered for the study.
Geographical area : - A project report will be prepared in capital city of Raipur. IIT Bhilai is
operated in transit campus of Govt Engineering college ,Raipur. Where the data will be
collected . Data from other CFTI’s will be collected based on telephonic discussions and
general assumption for the institutes.
Departments of the Organizations:- We will do a qualitative analysis for the stores &
purchase department and feedback from the departments of Physics, chemistry,
Mechanical , EECS lab will be taken for the same.
Brief background ( About the organization where the study will be conducted)
1) Indian Institute of Technology (IIT) Bhilai was established in the state of Chhattisgarh
by Ministry of Human Resource and Development in the year 2016.
IIT Bhilai offers Bachelor of Technology (BTech), Master of Technology (MTech), Master of
Science (MSc) and Doctoral programs (PhD) in various departments.
LIKENDRA VERMA 3
4 SYNOPSIS
IIT Bhilai is striving for research-driven undergraduate and postgraduate education. Our
objective is to create an education system with multifaceted outcomes including
research, entrepreneurship, technical leadership, and above all, responsible citizenship.
3) AIIMS Raipur : It is one of the Six AIIMS healthcare institutes being established by the
Ministry of Health & Family Welfare, Government of India under the Pradhan Mantri
Swasthya Suraksha Yojna (PMSSY). With the aim of correcting regional imbalances in
quality tertiary level healthcare in the country, and attaining self sufficiency in graduate
and postgraduate medical education. It has got 49th place in NIRF ranking and 5th place in
All India rankings of AIIMS.
Methodology:-
Qualitative research method is being used for this Project report. Departmental work
procedures will be observed under guide and all the data from the Govt offices will be
collected as per govt norms.
Based on collected data existing challenges in the department/ Central funded Govt.
institutions will be identified.
The following methods will be used for qualitative study for the research project ,during
detail study in nearby institutes procurement team ie. IIT Bhilai, NIT Raipur, AIIMS Raipur
& IIM Raipur : -
1) Open ended question will be asked for knowing the common difficulties which
is being faced by the Procurement team.
LIKENDRA VERMA 4
5 SYNOPSIS
LIKENDRA VERMA 5