The document provides a budget proposal for a 6-day school-based in-service training workshop to be held from December 14-19, 2020 at the Covered Court of Mactan Air Base Elementary School. It estimates total expenditures of PHP 59,849 which includes PHP 3,760 for pre-implementation costs, PHP 46,500 for food, and PHP 4,563 for training materials. An additional 10% contingency of PHP 5,026 is included for a grand total budget of PHP 59,849. The proposal was prepared by the school's Professional Development Committee and approved by the Division Superintendent.

Uploaded by

El Abarico
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views

Inset Budget

The document provides a budget proposal for a 6-day school-based in-service training workshop to be held from December 14-19, 2020 at the Covered Court of Mactan Air Base Elementary School. It estimates total expenditures of PHP 59,849 which includes PHP 3,760 for pre-implementation costs, PHP 46,500 for food, and PHP 4,563 for training materials. An additional 10% contingency of PHP 5,026 is included for a grand total budget of PHP 59,849. The proposal was prepared by the school's Professional Development Committee and approved by the Division Superintendent.

Uploaded by

El Abarico
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PART III: Budgetary Requirements

Activity: School Based In-Service Training Level:


___ Division
___ District
_/_ School
Venue: Covered Court-Mactan Air Base Elementary School
Date: December 14-19, 2020
Mode of Professional Development Delivery: Face-to-Face Training Workshop
ITEM OF EXPENDITURE #REQUIRED Cost per Total # of Amount
(e.g. # of pax/units/sets/hr) Unit/Hour days
A. Pre-Implementation
Designing/Materials Development
Honoraria (only if needed)
Travelling Expenses
Materials
 Bondpaper 5 reams 200.00 1,000.00
 Computer Ink 4 bottles 400.00 1,600.00
 Envelope 58 pcs 20.00 1,160.00
Sub-total 3,760.00
Fares: Air
Land
Sea
Sub-total Pre-Implementation 3,760.00
Live-In
Accommodation & Food
Live-Out
B. Food
 Morning Snacks 60 pax 25.00 6 9,000.00
 Lunch 60 pax 100.00 5 30,000.00
 Afternoon Snacks 60 pax 25.00 5 7,500.00
Sub-total 46,500.00
Training Materials
 Assorted Colored Cartolinas 150 pcs 6.00 900.00
 Elmers Glue 10 btl 32.00 320.00
 Manila Paper 200 pcs 4.50 900.00
 Masking Tape 10 rolls 40.00 400.00
 Marker Ink 2 btl 79.00 158.00
 Linen paper 3 packs 45.00 135.00
 Marking Pen 20 pcs 42.50 850.00
 Scissors 30 pcs 30.00 900.00
Sub-total 4,563.00
Equipment Rental (Specify)
Streamer/Banner
Reproduction Cost
Allowance (Consider both F3 and JEL
Components)
Per Diems
Program Staff Honoraria

Travelling Expenses (Consider both F3 and JEL


Components)
Fares: Air
Land
Sea
Vehicle Rental
Terminal Fees
Toll Fees
Fuel
Sub-total Implementation 4,563.00
Total A & B 50,260.00
Contingency 10% 5,026.00
GRAND TOTAL 59,849.00

APPROVAL SHEET
This Program Design has been prepared by the School PDC Team on November 20-25, 2020.

LEONOR A. PANTOLLANO VERONICA E. MALULAN FLORICEL R. PONCE IVEMAY B. BISNAR ETHYLE B. BICALDO ARALINE B. DELARMENTE
Chairman PDC Coordinator LAC Coordinator Member Member Secretariat

Contents Noted:

SINFRONIA R. BERDIN
PSDS Approval Recommended:

OLIVER M. TUBURAN EdD


Chief, Curriculum Implementation Division Approved:
WILFREDA D. BONGALOS PhD, CESO VI
Schools Division Superintendent