Substructure
Substructure
BILL NO 1 - SUBSTRUCTURE
Site Clearing
1.B.1 Clearing site including removal of roots and
growth of every description, removing top
soil up to a depth of 6" extended up to 10'-
0" beyond the outer walls of the proposed
building and carting away the waste
material from the site where directed &
leveling. (Approx. 2760.00 Sq.ft)
1 Item 3,600.00 3,600.00
Excavation & Earth work
Excavation commencing from existing
ground level, not exceeding 3'-4" deep in
any materials except rock requiring
blasting, part return fill in ram and surplus
disposed as directed.
1.B.2 For column footings 9.06 cube 1,959.00 17,748.54
Earthwork Supports
Earthwork supports, (Planking & Strutting)
total of depth excavation not exceeding 3'-
4" and distance between vertical sides
(opposing faces) not exceeding 6.56ft
S07 - 3
ITEM DESCRIPTION Qty UNIT RATE AMOUNT
Brought forward 215,079.28
Dewatering
S07 - 4
ITEM DESCRIPTION Qty UNIT RATE AMOUNT
C - CONCRETE WORK
Mass Concrete
1.C.2 6" thick under wall foundations 507.00 sq.ft 187.20 94,910.40
Reinforced Concrete
Formwork
1.C.9 Vertical sides of plinth beam ≤ 1'-0" high 720.00 L.ft 254.00 182,880.00
S07 - 5
ITEM DESCRIPTION Qty UNIT RATE AMOUNT
Brought forward 724,620.20
Reinforcement
In column footings
In column shafts
In Plinth beam
1.C.13 6mm dia as links in column shaft 1.00 cwt 9,194.00 9,194.00
1.C.14 6mm dia as stirrups in plinth beams 5.00 cwt 9,194.00 45,970.00
S07 - 6
ITEM DESCRIPTION Qty UNIT RATE AMOUNT
D - MASONRY WORK
Rubble Work
S07 - 7
ITEM DESCRIPTION Qty UNIT RATE AMOUNT
COLLECTION
S07 - 8