A. 4TH FLOOR
1.00 CF-01 EXISTING CEILING SLAB PAINTED BLACK
PAINTING TO EXPOSED STEEL DECK AND BEAMS- ENAMEL PAINT
1.1 STOCK ROOM
1.2 MESS HALL
1.3 UTILITY ROOM ( INCLUDED ON THE ORIGINAL CONTRACT )
C. 6TH FLOOR
1.00 CF-01 EXISTING CEILING SLAB PAINTED BLACK
1.1 SEVER ROOM
3.00 CF-03 PLASTERBOARD CEILING IN SEMI GLOSS LATEX
3.1 FILE ROOM
3.2 VP ENGR.
3.3 AVP OPERATION
3.4 ELEVATOR LOBBY
3.5 STAIR LOBBY
4.00 CF-4 COVE OFFICE
5.00 CF-5 LIGHT COVE
6.00 CF-5 CURTAIN COVE
7.00 CF-07 PLASTERBOARD FOR WET SURFACE (SEMI GLOSS FINISH)
7.1 MALE TOILET
7.2 FEMALE TOILET
7.3 PWD
7.4 TOILET LOBBY
7.5 SERVER ROOM
8.00 CF-08 ACOUSTIC CEILING BOARD
8.1 I.T. OFFICE
8.2 BIDS AND ESTIMATE
8.3 OFFICE
9.00 CF-9 SHADOW LINE
11.00 CF-11 SPANDREL COMPOSITE METAL 300X900
11.1 OFFICE AREA
12.00 CF-12 LOBBY LIGHT COVE
14.00 CF-14 EXISTING CEILING SLAB
D. 7TH FLOOR
2.00 CF-02 PLASTERBOARD CEILING IN HIGH GLOSS LATEX
2.1 BOARD ROOM
3.00 CF-03 PLASTERBOARD CEILING IN SEMI GLOSS LATEX
3.1 AFM
3.2 RFM
5.00 CF-05 LIGHT COVE
6.00 CF-06 CURTAIN COVE
7.00 CF-07 PLASTERBOARD FOR WET SURFACE (SEMI GLOSS FINISH)
7.1 PANTRY & TOILET
7.2 POWDER ROOM
8.00 CF-08 ACOUSTIC CEILING BOARD
* 8.1 BOARD ROOM
9.00 CF-9 SHADOW LINE
14.00 CF-14 EXISTING CEILING SLAB
* 15.00 CF-15 COFFERED CEILING
SUB- TOTAL OF CEILING FINISHES
B. 5 FLOOR
1.00 50MM THK FLOOR TOPPING WITHOUT WIREMESH READY TO RECEIVE FINISH
1.10 FLOOR TOPPING
2.00 FF-01 VINYL SHEET FLOOR FOR HEAVY TRAFFIC BY ARMSTRONG
2.1 LOBBY
3.00 FF-02 POLISHED CEMENT FLOOR
3.1 OFFICES AREA
3.2 SERVER ROOM
3.3 UTILITY ROOM
3.4 HALLWAY AREA
4.00 FF-03 VINYL TILE FLOOR FOR HEAVY TRAFFIC BY ARMSTRONG
3.1 ATTY OFFICES
3.2 VP EQUIP.
3.3 CONTROLLER
3.4 VP FINANCE
3.5 VPADMIN
5.00 FF-04 40X40 CERAMIC TILES BY MARIWASA
5.1 TOILET
5.2 POWDER ROOM
6.00 FF-06 RUBBER MAT FLOOR 3/16 THK BY 3M
6.1 FILE ROOM
6.2 SUPPLIES ROOM
7.00 FF-06 800X800 HOMOGENOUS FLOOR TILES
7.1 LIFT LOBBY AREA
C. 6 FLOOR
1.00 50MM THK FLOOR TOPPING WITHOUT WIREMESH READY TO RECEIVE FINISH
1.10 FLOOR TOPPING
1.00 FF-01 VINYL SHEET FLOOR FOR HEAVY TRAFFIC BY ARMSTRONG
3.00 FF-02 POLISHED CEMENT FLOOR
3.1 UTILITY ROOM
3.2 SERVER ROOM
3.3 IT OFFICE
3.4 ENG'R. OFFICE
3.5 FILES ROOM
4.00 FF-03 VINYL TILE FLOOR FOR HEAVY TRAFFIC BY ARMSTRONG
4.1 AVP OPERATION
4.2 VP ENGRING
5.00 FF-04 40X40 CERAMIC TILES BY MARIWASA
5.1 TOILET
6.00 FF-05 RUBBER MAT FLOOR 3/16 THK BY 3M
6.1 FILES
7.00 FF-06 800X800 HOMOGENOUS FLOOR TILES
7.1 LIFT LOBBY
D. 7 FLOOR
2.00 FF-02 POLISHED CEMENT FLOOR
2.1 STO. ROOM
2.2 UTILYTY ROOM
3.00 FF-03 VINYL TILE FLOOR FOR HEAVY TRAFFIC BY ARMSTRONG
3.1 AFM
3.2 RFM
3.3 LIFT LOBBY
3.4 RECEPTION
4.00 FF-04 40X40 CERAMIC TILES BY MARIWASA
4.1 PANTRY TOLIET
4.2 POWDER ROOM
9.00 FF-09 CARPET TILE
9.1 BOARD ROOM
SUB- TOTAL OF CEILING FINISHES
WALL FINISHES
1.00 4TH FLOOR
1.1 INTERIOR WALL PAINT WHITE ( SEMI-GLOSS )
Wall A
1.1 Meeting room # 1
1.2 Meeting room # 2
1.3 Meeting room # 3
1.4 Meeting room # 4
1.5 Conferenec room
1.6 Training room
1.7 Stock room 1 & 2
1.8 Hallway
1.9 Pantry
1.20 Partition Between Rooms
1.10 Hardware
4.00 4F Training Room
1.10 Wall A
B. 5TH FLR
1.00 5F Executive Offices
1.1 INTERIOR WALL PAINT WHITE ( SEMI-GLOSS )
1.1 VP ADMIN
1.2 VP FINANCE
1.3 COMPROLLER
1.4 VP EQUIP
1.5 ATTY OFFICE
1.6 QMI
1.7 OFFICES
1.8 LOBBY
1.9 FILE ROOM
1.10 SERVER ROOM
1.11 SUPPLIES
1.12 ELEV. LOBBY
1.13 SERVICE STAIR
2.00 OTHERS
1.10 Wall A
1.20 Wall B
1.30 Open Shelves
1.40 Platform
1.60 Transaction Window
1.90 Reception Counter
1.10 Wall A
3.00 5F HUDDLE AREA- GLASS BOARD
3.1 Wall A
3.2 Writing board
3.3 Frame
3.4 Ledge
4.00 5F/6F Coffee station
5.00 5F Printer ( Inside )
5.1 DR 200
5.2 DR400
C. 6TH FLOOR
6.00 6F Offices
1.1 INTERIOR WALL PAINT WHITE ( SEMI-GLOSS )
6.10 Wall A
6.1 FILES
6.2 ENGR.
6.3 VP ENGR.
6.4 AVP OPERATION
6.5 I.T OFIICE
D. 7TH FLOOR
1.00 Reception Cabinet / Table
1.00 Board Room cabinet
SUB- TOTAL DETAILING
B. WINDOWS
1.00 W-01
2.00 W-02
3.00 W-03
4.00 W-04
5.00 W-05
6.00 W-06
7.00 W-07
8.00 W-08
9.00 W-09
10.00 W-10
11.00 W-11
SUB- TOTAL DOORS AND WINDOWS
V. STAIRS
1.00 STAIRS
Wall using 150mm thk CFMI Formblock
1.10 Wall GF to 2F
1.20 Wall 2F to 3F
1.30 Wall 3F to 4F
1.40 Wall 5F to 6 F
1.50 Wall 6F to 7F
2.00 STAIRS WALL PLASTERING USING SKIMCOAT
2.10 Wall A GF to 2F
2.20 Wall A 2F to 3F
2.30 Wall A 3F to 4F
2.40 Wall A 5F to 6 F
2.50 Wall A 6F to 7F
3.00 STAIRS WALL PAINTING FINSH SEMI-GLOSS
3.10 Wall A GF to 2F
3.20 Wall A 2F to 3F
3.30 Wall A 3F to 4F
3.40 Wall A 5F to 6 F
3.50 Wall A 6F to 7F
4.00 STAIRS WALL PAINTED BLACK FINISH
4.10 Wall A GF to 2F
4.20 Wall A 2F to 3F
4.30 Wall A 3F to 4F
4.40 Wall A 5F to 6 F
4.50 Wall A 6F to 7F
5.00 STAIRS WALL 6MM ALUMINUM GROOVE.
5.10 Wall GF
5.20 Wall 2F
5.30 Wall 3F
5.40 Wall 4F
5.50 Wall 5F
5.60 Wall 6F
6.00 STAIRS WALL 10MM ALUMINUM GROOVE.
6.10 Wall GF
6.20 Wall 2F
.30 Wall 3F
6.40 Wall 4F
6.50 Wall 5F
6.60 Wall 6F
SUB- TOTAL STAIR
TOTAL AMOUNT
Prepared by :
Richard Day
Project Manager
Unit Rate THIS PERIOD
Quantity Unit
Unit Cost % WDA QTY EVALUATED QTY
- sq.m
-
-
CEIVE FINISH
239.70 sq.m 605.31 72.88% 174.69 174.69
- sq.m
241.60 sq.m
174.69 sq.m
66.91 sq.m
54.88 sq.m
58.62 sq.m
-
EIVE FINISH
387.54 sq.m 605.31 0.00%
171.72 sq.m
6.80 sq.m
6.48 sq.m
12.30 sq.m
13.44 sq.m
13.44 sq.m
13.44 sq.m
25.58 sq.m
19.78 sq.m
-
EIVE FINISH
381.04 sq.m 605.31 0.00%
6.00 sq.m
19.95 sq.m
21.58 sq.m
43.80 sq.m
-85.33 sq.m
18.60 sq.m
24.06 sq.m
-
20.80 sq.m
5.32 sq.m
15.48 sq.m
124.30 sq.m
29.20 sq.m
29.20 sq.m
38.64 sq.m
72.66 sq.m
-
-
15.90 sq.m
8.97 sq.m
22.00 units
1.00 lot
- lot
1.00 lot
10.30 sq.m
10.10 sq.m
2.30 sq.m
1.00 unit
1.00 unit
2.00 lots
4.00 pcs
4.00 pcs
-
-
-
-
-
10.00 pcs 3,600.00 0.00%
5.00 pcs 3,600.00 100.00% 5.00 5.00
12.00 pcs 3,600.00 0.00%
3.00 pcs 3,600.00 0.00%
-
2.00 sets
2.00 sets
1.00 sets
3.00 sets
1.00 sets
1.00 sets
2.00 sets
1.00 sets
1.00 sets
1.00 sets
1.00 sets
6,737.50
88,443.75
-
-
-
-
-
-
-
16,818.17
84,038.26 Remaining qty is for deductive
-
-
-
14,000.00
20,580.00
4,438.00
4,214.00
-
-
9,947.45
10,751.62
4,924.15
-
-
-
-
-
-
-
-
-
16,170.00
840.00
-
-
-
-
-
-
-
-
-
18,738.22
23,464.08
12,227.76
12,227.76
12,227.76
-
-
-
-
630.00
2,730.00
735.00
-
7,050.24
7,402.75
5,144.47
-
-
2,660.00
3,812.50
-
-
-
-
-
-
20,395.76
15,713.33
-
-
-
-
-
-
7,667.14
8,041.68
4,252.18
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
105,741.60
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3,750.00
3,750.00
3,750.00
3,750.00
3,750.00
16,875.00
3,750.00
18,750.00
16,875.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
18,000.00
-
-
-
3,750.00
2,500.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
22,752.40
22,752.40
-
-
-
-
7,791.54
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
705,311.46