CV - Linkedin 5
CV - Linkedin 5
Myself Manu, having 24.9+ years of experience in Client / MNC, mainly in the field of
Project control & Planning Manager, Project Manager, Construction Manager in Oil &Gas on
shore & Off Shore (CPP, WHP, JACKETS, Drilling Projects & Shut down Projects & sub sea
Pipeline( Shallow & Deep)& CONSRUCTION. Having experience in infrastructures such as,
Airport, Rails (Bullet Train), Roads, Buildings, Airbases etc. I believe that I am an excellent
team player with a dedicated and dynamic approach to my business.
Project Value Engineering Front Engineering Schedules CONCEPT to EPC Design Portfolio
of Design Enterprises Project Management Tools & Techniques Planning Subject Matter
Expert CPM Methods Optimistic & Pessimistic Estimation PMC Operations Manpower
MANU. G. PILLAI, Forecasts Time & Cost Estimation Project Coordination Work flow logic Sequence Onshore
Sr.Planning &Project & offshore exposure Cost Control Techniques Making delay analysis report Well versed in
Controls/Project Manager, Wrench Tool Well versed in Digital Document Management System & MS Access
Construction Manager-(PMP-RMP- Procurement Management Contract Management Construction Management PERSONAL
PMI-)(RMS-DMS- USA) SKILLS: Leadership Skill Develop consistent & effective Project control philosophies,
(Up Stream, Down Stream, Pipe line, systems, and procedures for the project & for the Project control department.( Planning &
Drilling& Infra Structure) Cost& Risk& Construction)
Mob: 0091-8606571374
[email protected] • Perform and manage project Controls activity scheduling and monitoring” and construction
• Professional Skills
• Civil Engineering1998(3 • Preparing and verifying the shallow & deep water Pipeline schedules and its PMS.
yrs)
Project Management • “Provide planning and cost controlling support for all projects which includes variation
reporting, monitoring of milestone progress to the preparation of customer billing
• Logic Network & WBS
processes, etc”
• Enterprise Portfolio
Structure • Allotment and analysis of marine spreads and it plan
• P6-Project Scheduling
• PrimaveraL2/L3/L4 & • Detailed Pipeline activity with Diving chart with the coordination with Marine Barges
L5 Micro Scheduling
• Resource Loading • Preparing schedules for land acquisitions for Railways and Roads
&Leveling • Developing of Feasibility/FEED/ EPCI / EPCC/Pipeline EPCM / Detailed & Micro Schedules
• EVM-Earned Value (level-1/2/3/4)
Reports • Preparation of Pre commissioning & Commissioning Schedules
• Presentations • Preparation of Pipeline schedules
• Interface with all
discipliners • Conducting QRA (SRA & CRA) for the Project
• Forecasting Milestones • Risk analysis by using PERTMASTER
• S-Curves & Bar Charts • Construction Progress Measurement System
• PERT Analysis & CPM • Preparing the ERP for the Project with detailed analyzing.
Analysis
• Ensure the project is executed to the project management practices and the requirements
• Resource Analysis & within the contract
Histogram
• Preparation of EPC/EPCIC Final reports and Project Close out reports to clients and
• Design Man hour Management.
calculation
• Preparing the detail network, schedules (Weekly& Monthly), reports for the multi -
• Delay Analysis & Risk discipline project
Analysis
• Controlling the construction activities
• Action Plan & Mitigation
Plan • Identify schedule variances and remedial actions to control project duration and reduce
impact on project budget
• Progress Monitoring &
Reporting • Lead time sheet administration and reporting for invoicing purposes
• EPCC Progress • Preparing the cash flows for the project with EV Management.
Measurements • Interface with all level of project management team and client management for project
• Detailed Work Plan & control issues and presentation
Reports • Provide detailed schedule analysis to support project management
• Site Construction • Prepare the project programs and develop WBS for detailing for Contractors for
Planning Works implementation.
• Fabrication & Erection • Assist the project Manager with various reports like progress report, Cost report, Recovery
works plans, Corrective action plans and Resource Identification
• Commissioning at • Manage project change control and maintain change control records and justifications
• SAP System Expert • Lead the pipeline (shallow/ deep) procedures and progress measuring methods.
Additional & Associated :
• Handling a team of Planners, Estimators, Cost controllers, Contracts administrator,
• PMP (PMI) Document
• PRIMAVERA (PMI) Awards
• RMP(PMI) • DOLPHIN ENERGY APPRECIATION AWARD, QATAR
• DMS ( USA) • ADGAS APPRECIATION AWARD from UAE
• RMS ( USA)
P a g e |1 of 6
Brief Of Employment Histories
➢ Freelance Consultant for EPC/EPCIC/EPCM and Tendering $ CONSTRUCTION ( Onshore/Offshore &
Pipeline) 2020 Mach to till Date
➢ PROTECON BTG Ltd ( Offshore & Pipeline) March-2018 –Jan2020) Sub Sea Pipeline, Kakinada
➢ PROTECON BTG Ltd –(Onshore)(Aug’2016 to March 2018) LPG Mundra, ADANI Group, Gujarat
,Bullet Train Project ( MUM- AHD) / Construction
➢ PETRONAS, Malaysia –( Off shore& Pipeline- Deep water up to 11000 Ft)(Aug’2013 to April2016)
➢ TECHNIP,France,Abu Dhabi-( Onshore / Off shore/ Pipeline up to Mid water level -7000Ft)
( May 2007 to July2013)
➢ CONTRACK INTERNATIONAL, USA ( AIRPORT/ ANA Bulk Fuels)(Dec’2006 – May’2007)
➢ MMG Saudi Aramco Project (Off Shore)(June’2006 – Dec’2006)
➢ Nasser S. Al-Hajri Company Limited, Qatar (On Shore/ Off Shore)(Apr’2005 – Mar’2006)
➢ RASCO Building Contracting, UAE( Building)(Jan’2003 – Nov’2004)
➢ GOVT OF DUBAI, Rulers Department, UAE( Infra Structure)(Jan’2001 – Jan’2003)
➢ Central Ordinance Depot, Pune ( Indian Army Force)( Infra Structure)(July’2000-Dec’2000)
Construction
➢ Bhima Construction group, India( Buildings/ Roads)(Aug’1999-July’2000) Construction
➢ Neo-Structo Construction Limited, India( Onshore)(Nov’1998-July’1999)Planning/Construction
➢ Kinetic Technology India Ltd( On shore)(May’1998-Oct1998) Planning / Construction
FREELANCE CONSULTANT (2020 Mach to till Date) Mainly for Protecon, A&A Consultancy, Etc…
P a g e |2 of 6
➢ Undertake any other ad-hoc duties as required.
➢ Developing CPM from the contractors schedule after everymonth/week.
➢ Preparing the Installation Sequences for SiteManagement
➢ Preparing the Shut Down Schedule with HourlyResources
➢ Preparing the detailed construction schedule / Precom& commissioning schedules
➢ Co Ordination with H.O Engineering / Procurement and SiteManagement
➢ Preparation of Daily / Weekly / MonthlyReports
➢ Preparing the Vessel Movement/ Flare Installation and barge MovementSchedules.
➢ Preparing the Variationorders.
Job title: Project Manager Project Controls Manager.( LPG Mundra , Gujarat)
P a g e |3 of 6
PETRONAS, Malaysia - Aug’ 2013 to Apr 2016.( Off Shore)
Job title: Lead Planning & Project Controls Engineer(Equal to Manager Position as expiatory)(SK-316- NC3
Project )
P a g e |4 of 6
➢ Co Ordination with H.O Engineering / Procurement and SiteManagement
➢ Preparation of Daily / Weekly / MonthlyReports
➢ Preparing the Vessel Movement and barge MovementSchedules.
➢ Preparing the Variationorders.
➢ Attending and Presenting the Progress of Projects and its Constrains in Client / ManagementMeetings.
TECHNIP France, Abu Dhabi. ( 2007 To 2010) Site Office- On shore/ Off Shore
Job title: Sr. Planning & Controls Engineer for OAG-1 PROJECT, DAS ISLAND & Um Shaif( Offshore)- Client-
ADGAS
P a g e |5 of 6
➢ Developconsistent & effective Project control philosophies, systems, and procedures for the project
➢ Ensure the project is executed to the project management practices and the requirements with in the contract
➢ Preparing the detail network, schedules (Weekly& Monthly), reports for the multi -disciplineproject
➢ Identify schedule variances and remedial actions to control project duration and reduce impact on
projectbudget
➢ Make recommendation for performance improvement and/ or corrective action tomanagement
➢ Lead timesheet administration and reporting for invoicingpurposes
➢ Interface with all level of project management team and client management for project control issues
andpresentation
➢ Prepare project cashflows
➢ Provide detailed schedule analysis to support projectmanagement
➢ Prepare the project programs like Risk Analysis / delaysanalysis
➢ AssisttheprojectManagerwithvariousreportslikeprogressreport,Costreport,Recoveryplans
,Corrective action plans and Resource Identification
➢ Handling a team of Planners, Estimators, Cost controllers, Contracts administrator, Document
controller and Project Administrator
➢ Working together with Customer to achieve the performance
➢ Preparing the Method statements for the projects ( related to Technical services)
➢ Preparing the Field query for the projects ( related to Technical services)
➢ Review and approve Airport Layout Plan (ALP).
➢ Review and acceptance of forecast.
➢ Airspace and procedure changes
➢ Review and approve Airport Layout Plan (ALP).
➢ Review and acceptance of forecast.
➢ Airspace and procedure changes
➢ Biometric technology, crowd monitoring,
P a g e |6 of 6
➢ Prepare monthly vessel movement report for the monitoring of the vessel activities on a daily basis and register all
downtime, consumptions and vessel related issues relating to the project promptly to the project manager and
management.
➢ Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion
of the project work.
➢ Team leader of the Invoicing team
Nasser S. Al-Hajri Company Limited, Qatar ( Dolphin Gas Project with JGC, Qatar)- Apr’2005 to March’2006
Job title: Planning& Cost Engineer Shore/Off
Shore)
P a g e |7 of 6
➢ Preparing the Manpower and Equipment schedule for theProject
➢ Preparing the Material approvals for theprojects
➢ Invoicing ( Monthly) and submission of the ProgressReports
Central Ordinance Depot, Pune ( Indian Army Force) (July2000 thru’ Dec 2000)
Job title: Site Construction Engineer
Outlines of MajorResponsibilities:
P a g e |8 of 6
PERSONAL DETAILS
I hereby declare that whatever is mentioned above is true to the best of my Knowledge
And belief
Manu. G. pillai
P a g e |9 of 6