0% found this document useful (0 votes)
139 views

CV - Linkedin 5

Manu has over 24 years of experience in project control, planning, and construction management for oil and gas, infrastructure, and other industries. He has expertise in scheduling, cost control, risk analysis, progress reporting and other project controls functions. Some of Manu's roles include planning manager, project manager, and construction manager for projects involving pipelines, drilling, offshore platforms, and more. He is proficient in project management tools like Primavera and knowledgeable in techniques like earned value management.

Uploaded by

Samir Chaudhary
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views

CV - Linkedin 5

Manu has over 24 years of experience in project control, planning, and construction management for oil and gas, infrastructure, and other industries. He has expertise in scheduling, cost control, risk analysis, progress reporting and other project controls functions. Some of Manu's roles include planning manager, project manager, and construction manager for projects involving pipelines, drilling, offshore platforms, and more. He is proficient in project management tools like Primavera and knowledgeable in techniques like earned value management.

Uploaded by

Samir Chaudhary
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Career Summary

Myself Manu, having 24.9+ years of experience in Client / MNC, mainly in the field of
Project control & Planning Manager, Project Manager, Construction Manager in Oil &Gas on
shore & Off Shore (CPP, WHP, JACKETS, Drilling Projects & Shut down Projects & sub sea
Pipeline( Shallow & Deep)& CONSRUCTION. Having experience in infrastructures such as,
Airport, Rails (Bullet Train), Roads, Buildings, Airbases etc. I believe that I am an excellent
team player with a dedicated and dynamic approach to my business.
Project Value Engineering Front Engineering Schedules CONCEPT to EPC Design Portfolio
of Design Enterprises Project Management Tools & Techniques Planning Subject Matter
Expert CPM Methods Optimistic & Pessimistic Estimation PMC Operations Manpower
MANU. G. PILLAI, Forecasts Time & Cost Estimation Project Coordination Work flow logic Sequence Onshore
Sr.Planning &Project & offshore exposure Cost Control Techniques Making delay analysis report Well versed in
Controls/Project Manager, Wrench Tool Well versed in Digital Document Management System & MS Access
Construction Manager-(PMP-RMP- Procurement Management Contract Management Construction Management PERSONAL
PMI-)(RMS-DMS- USA) SKILLS: Leadership Skill Develop consistent & effective Project control philosophies,
(Up Stream, Down Stream, Pipe line, systems, and procedures for the project & for the Project control department.( Planning &
Drilling& Infra Structure) Cost& Risk& Construction)
Mob: 0091-8606571374
[email protected] • Perform and manage project Controls activity scheduling and monitoring” and construction
• Professional Skills
• Civil Engineering1998(3 • Preparing and verifying the shallow & deep water Pipeline schedules and its PMS.
yrs)
Project Management • “Provide planning and cost controlling support for all projects which includes variation
reporting, monitoring of milestone progress to the preparation of customer billing
• Logic Network & WBS
processes, etc”
• Enterprise Portfolio
Structure • Allotment and analysis of marine spreads and it plan
• P6-Project Scheduling
• PrimaveraL2/L3/L4 & • Detailed Pipeline activity with Diving chart with the coordination with Marine Barges
L5 Micro Scheduling
• Resource Loading • Preparing schedules for land acquisitions for Railways and Roads
&Leveling • Developing of Feasibility/FEED/ EPCI / EPCC/Pipeline EPCM / Detailed & Micro Schedules
• EVM-Earned Value (level-1/2/3/4)
Reports • Preparation of Pre commissioning & Commissioning Schedules
• Presentations • Preparation of Pipeline schedules
• Interface with all
discipliners • Conducting QRA (SRA & CRA) for the Project
• Forecasting Milestones • Risk analysis by using PERTMASTER
• S-Curves & Bar Charts • Construction Progress Measurement System
• PERT Analysis & CPM • Preparing the ERP for the Project with detailed analyzing.
Analysis
• Ensure the project is executed to the project management practices and the requirements
• Resource Analysis & within the contract
Histogram
• Preparation of EPC/EPCIC Final reports and Project Close out reports to clients and
• Design Man hour Management.
calculation
• Preparing the detail network, schedules (Weekly& Monthly), reports for the multi -
• Delay Analysis & Risk discipline project
Analysis
• Controlling the construction activities
• Action Plan & Mitigation
Plan • Identify schedule variances and remedial actions to control project duration and reduce
impact on project budget
• Progress Monitoring &
Reporting • Lead time sheet administration and reporting for invoicing purposes
• EPCC Progress • Preparing the cash flows for the project with EV Management.
Measurements • Interface with all level of project management team and client management for project
• Detailed Work Plan & control issues and presentation
Reports • Provide detailed schedule analysis to support project management
• Site Construction • Prepare the project programs and develop WBS for detailing for Contractors for
Planning Works implementation.
• Fabrication & Erection • Assist the project Manager with various reports like progress report, Cost report, Recovery
works plans, Corrective action plans and Resource Identification
• Commissioning at • Manage project change control and maintain change control records and justifications
• SAP System Expert • Lead the pipeline (shallow/ deep) procedures and progress measuring methods.
Additional & Associated :
• Handling a team of Planners, Estimators, Cost controllers, Contracts administrator,
• PMP (PMI) Document
• PRIMAVERA (PMI) Awards
• RMP(PMI) • DOLPHIN ENERGY APPRECIATION AWARD, QATAR
• DMS ( USA) • ADGAS APPRECIATION AWARD from UAE
• RMS ( USA)
P a g e |1 of 6
Brief Of Employment Histories
➢ Freelance Consultant for EPC/EPCIC/EPCM and Tendering $ CONSTRUCTION ( Onshore/Offshore &
Pipeline) 2020 Mach to till Date
➢ PROTECON BTG Ltd ( Offshore & Pipeline) March-2018 –Jan2020) Sub Sea Pipeline, Kakinada
➢ PROTECON BTG Ltd –(Onshore)(Aug’2016 to March 2018) LPG Mundra, ADANI Group, Gujarat
,Bullet Train Project ( MUM- AHD) / Construction
➢ PETRONAS, Malaysia –( Off shore& Pipeline- Deep water up to 11000 Ft)(Aug’2013 to April2016)
➢ TECHNIP,France,Abu Dhabi-( Onshore / Off shore/ Pipeline up to Mid water level -7000Ft)
( May 2007 to July2013)
➢ CONTRACK INTERNATIONAL, USA ( AIRPORT/ ANA Bulk Fuels)(Dec’2006 – May’2007)
➢ MMG Saudi Aramco Project (Off Shore)(June’2006 – Dec’2006)
➢ Nasser S. Al-Hajri Company Limited, Qatar (On Shore/ Off Shore)(Apr’2005 – Mar’2006)
➢ RASCO Building Contracting, UAE( Building)(Jan’2003 – Nov’2004)
➢ GOVT OF DUBAI, Rulers Department, UAE( Infra Structure)(Jan’2001 – Jan’2003)
➢ Central Ordinance Depot, Pune ( Indian Army Force)( Infra Structure)(July’2000-Dec’2000)
Construction
➢ Bhima Construction group, India( Buildings/ Roads)(Aug’1999-July’2000) Construction
➢ Neo-Structo Construction Limited, India( Onshore)(Nov’1998-July’1999)Planning/Construction
➢ Kinetic Technology India Ltd( On shore)(May’1998-Oct1998) Planning / Construction

Detailed Employment History

FREELANCE CONSULTANT (2020 Mach to till Date) Mainly for Protecon, A&A Consultancy, Etc…

Job title: Senior Project Controls Specialist- CONSULTANT

Team of Reporting:- Planning Engineers3- , Cost Controller-2

Outlines of Major Responsibilities:

➢ Detailed EPCI & Construction schedule& Cost report Developing.


➢ Preparing the Sub sea Pipeline Schedule ( Deep Water)
➢ Preparing of Project budget with Mile stones/Progress earned.
➢ Preparing of cash flows ( Cash in/ out)
➢ Detailed analysis of Engineering/procurement/Construction Milestones.
➢ Earned value (EV) management for the company with respect to budgeted cost.
➢ Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims
from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly
recorded.
➢ Provide planning and cost controlling support for all projects which includes variation reporting, monitoring of
milestone progress to the preparation of customer billing processes, etc
➢ Perform and manage project activity scheduling and monitoring
➢ Perform technical and commercial review of EPCI long time tenders (subcontractor’s quotations) for the
preparation of Service agreements
➢ Ensure effective project implementation and utilize productive reports from the creation of WBS with the use of
project management system to monitor the status of all purchases, invoicing and delivery up to the closure of the
project.
➢ Conduct and analyses the safety movements and explain to PMT
➢ Prepare monthly vessel movement report for the monitoring of the vessel activities on a daily basis and register all
downtime, consumptions and vessel related issues relating to the project promptly to the project manager and
management.
➢ Prepare the divers management with allocated Barge captains.
➢ Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion
of the project work.
➢ Verify the Marine Spreads and the feasibility for installing the pipelines
➢ Perform project costing related reporting to the team and management’s review on a monthly basis to ensure that
expenditures are kept within the project budget.
➢ Provide cost control and planning advice to the internal PMT team as and when required.

P a g e |2 of 6
➢ Undertake any other ad-hoc duties as required.
➢ Developing CPM from the contractors schedule after everymonth/week.
➢ Preparing the Installation Sequences for SiteManagement
➢ Preparing the Shut Down Schedule with HourlyResources
➢ Preparing the detailed construction schedule / Precom& commissioning schedules
➢ Co Ordination with H.O Engineering / Procurement and SiteManagement
➢ Preparation of Daily / Weekly / MonthlyReports
➢ Preparing the Vessel Movement/ Flare Installation and barge MovementSchedules.
➢ Preparing the Variationorders.

PROTECON BTG Ltd, India – AUG’ 2016 to Jan 2020

Job title: Project Manager Project Controls Manager.( LPG Mundra , Gujarat)

Team of Reporting:- Planning Engineers- 4, Cost Controller-3,Site Manager

Outlines of Major Responsibilities:

➢ Detailed EPCI & Construction schedule& Cost report Developing.


➢ Preparing the land acquisition schedules for Railways/ Roads
➢ Preparing of Project budget with Mile stones/Progress earned.
➢ Preparing of cash flows ( Cash in/ out)
➢ Detailed analysis of Engineering/procurement/Construction Milestones.
➢ Earned value (EV) management for the company with respect to budgeted cost.
➢ Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims
from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly
recorded.
➢ Provide planning and cost controlling support for all projects which includes variation reporting, monitoring of
milestone progress to the preparation of customer billing processes, etc
➢ Perform and manage project activity scheduling and monitoring
➢ Perform technical and commercial review of EPCI long time tenders (subcontractor’s quotations) for the
preparation of Service agreements
➢ Ensure effective project implementation and utilize productive reports from the creation of WBS with the use of
project management system to monitor the status of all purchases, invoicing and delivery up to the closure of the
project.
➢ Conduct and analyses the safety movements and explain to PMY
➢ Prepare monthly vessel movement report for the monitoring of the vessel activities on a daily basis and register all
downtime, consumptions and vessel related issues relating to the project promptly to the project manager and
management.
➢ Prepare the divers management with allocated Barge captains.
➢ Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion
of the project work.
➢ Verify the Marine Spreads and the feasibility for installing the pipelines
➢ Perform project costing related reporting to the team and management’s review on a monthly basis to ensure that
expenditures are kept within the project budget.
➢ Provide cost control and planning advice to the internal PMT team as and when required.
➢ Undertake any other ad-hoc duties as required.
➢ Developing CPM from the contractors schedule after everymonth/week.
➢ Preparing the Installation Sequences for SiteManagement
➢ Preparing the Shut Down Schedule with HourlyResources
➢ Preparing the detailed construction schedule / Precom& commissioning schedules
➢ Co Ordination with H.O Engineering / Procurement and SiteManagement
➢ Preparation of Daily / Weekly / MonthlyReports
➢ Preparing the Vessel Movement/ Flare Installation and barge MovementSchedules.
➢ Preparing the Variationorders.

P a g e |3 of 6
PETRONAS, Malaysia - Aug’ 2013 to Apr 2016.( Off Shore)

Job title: Lead Planning & Project Controls Engineer(Equal to Manager Position as expiatory)(SK-316- NC3
Project )

Team of Reporting:- Planning Engineers- 3, Cost Controller-2,Estimator-2


Outlines of Major Responsibilities:

➢ Designing Project controls Procedures basis for TopManagement.


➢ proficient in Planning & Scheduling, Cost Monitoring & Control, Working Capital & Cash flow Management and
Project Budgeting.
➢ Verifying the Deep Water Pipeline schedule and PMS ( 24” & 32”) Dia
➢ Conducting QRA ( SRA& CRA) on a Monthlybasis.
➢ Allotment and analysis of marine spreads and it plan
➢ Detailed Pipeline activity with Diving chart with the coordination with Marine Barges
➢ Preparation of detailed Pipeline schedule
➢ Developing CPM from the contractors schedule after everymonth/week.
➢ Conducting Schedule review session with Contactors & Sub-Contractors.
➢ Implementation of Progress Measurement system(PMS).
➢ Level 1 to 4 schedule should be implemented to control theproject.
➢ S curves to be implemented by assets and by systemwise.
➢ Prepare and Implementation of Productivity Chartsfor knowing the efficiency and manpower.
➢ Verify the Punch lists for Mile stonepayment.
➢ Preparation of CPA chart for Topmanagement.
➢ Two weeks look ahead schedule should be in Excel spread sheet and it has to extract from the level – 4 schedule.
➢ KPI charts to be submitted fordisciplines
➢ Run Down Curves ( AllDiscipline)

TECHNIP France, Abu Dhabi. ( 2012 To 2013) On shore &off shore


Job title: Sr. Project controls Engineer/Construction Manager for Sub Sea ( 12” / 18” & 30” ) Pipeline Replacing for
DUBAI PETROLEUM ( DPE) Deep water of 11000FT

Outlines of Major Responsibilities:


➢ Detailed EPCI & Construction scheduleDeveloping for the deep water Pipeline Installation.
➢ Preparing the day to day schedule update of the Pipeline Installation by using PMS. ( Qty/ Length)
➢ Detailed analysis of Engineering/procurement/Construction Milestones.
➢ Earned value management for the company with respect to budgeted cost.
➢ Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims
from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly
recorded.
➢ Provide planning and cost controlling support for all projects which includes variation reporting, monitoring of
milestone progress to the preparation of customer billing processes, etc
➢ Perform and manage project activity scheduling and monitoring
➢ Perform technical and commercial review of EPCI long time tenders (subcontractor’s quotations) for the
preparation of Service agreements
➢ Ensure effective project implementation and utilize productive reports from the creation of WBS with the use of
project management system to monitor the status of all purchases, invoicing and delivery up to the closure of the
project.
➢ Prepare monthly vessel movement report for the monitoring of the vessel activities on a daily basis and register all
downtime, consumptions and vessel related issues relating to the project promptly to the project manager and
management.
➢ Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion
of the project work.
➢ Developing CPM from the contractors schedule after everymonth/week.
➢ Preparing the Installation Sequences for SiteManagement
➢ Preparing the Shut Down Schedule with HourlyResources

P a g e |4 of 6
➢ Co Ordination with H.O Engineering / Procurement and SiteManagement
➢ Preparation of Daily / Weekly / MonthlyReports
➢ Preparing the Vessel Movement and barge MovementSchedules.
➢ Preparing the Variationorders.
➢ Attending and Presenting the Progress of Projects and its Constrains in Client / ManagementMeetings.
TECHNIP France, Abu Dhabi. ( 2007 To 2010) Site Office- On shore/ Off Shore
Job title: Sr. Planning & Controls Engineer for OAG-1 PROJECT, DAS ISLAND & Um Shaif( Offshore)- Client-
ADGAS

Team of Reporting:- Planning Engineers- 6, Cost Controller-2,Estimator-2


Outlines of Major Responsibilities:

➢ Detailed EPC & Construction scheduleDeveloping


➢ Progress & Man-hour Monitoring the Sub Contractors ( TARGET /DESCON)
➢ Detailed Project and Discipline “S-Curves”
➢ Detailed analysis of Engineering/procurement/Construction Milestones.
➢ Earned value management for the company with respect to budgeted cost.
➢ Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims
from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly
recorded.
➢ Provide planning and cost controlling support for all projects which includes variation reporting, monitoring of
milestone progress to the preparation of customer billing processes, etc
➢ Perform and manage project activity scheduling and monitoring
➢ Perform technical and commercial review of EPCI long time tenders (subcontractor’s quotations) for the
preparation of Service agreements
➢ Ensure effective project implementation and utilize productive reports from the creation of WBS with the use of
project management system to monitor the status of all purchases, invoicing and delivery up to the closure of the
project.
➢ Prepare monthly vessel movement report for the monitoring of the vessel activities on a daily basis and register all
downtime, consumptions and vessel related issues relating to the project promptly to the project manager and
management.
➢ Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion
of the project work.
➢ Detailed delay analysis and remedialactions
➢ Home office services like Engineering , Procurement updating by using separatesoftware
➢ Handling the Sub Contractors with the schedule as well as thereports
➢ Risk assessment by using Pert MasterSoftware
➢ Construction Progress Measurement System by usingCPMS
➢ Preparation of weekly and Monthly reports for theclient.
➢ Assist the project Manager with various reports like progress report, Cost report, Recovery plans,
Corrective action plans and ResourceIdentification
➢ Co-ordinationofallDisciplineEngineersandinspectionswithsub-contractorandclient.
➢ Establishment of regular Progress &quality control meetings with the sub-contractor andclient
➢ Co-ordination and conduction of all relevant Engineers and inspections with the applicable local
authority, asrequired
➢ Make recommendation for performance improvement and/ or corrective action tomanagement
➢ Ensure that all inspections have been carried out of all materials and/or equipment that have been
delivered to site to ensure compliance with the projectspecifications.
➢ Identify schedule variances and remedial actions to control project duration and reduce impact on
projectbudget

CONTACK INTERNATIONAL. On shore (USArmy Corporation of Engineers, Afghanistan) (Dec 2006-May


2007)SR> PROJECT CONTROLS ENGINEER/ SITE MANAGER ( Airport / ANA Bulk Fuels)
Team of Reporting:- Planning Engineers-3, Cost Controller-12
Project:- ANA BULK FUEL PROJECT / KABUL AIR PORT CONSTRUCTION

Outlines of Major Responsibilities:

P a g e |5 of 6
➢ Developconsistent & effective Project control philosophies, systems, and procedures for the project
➢ Ensure the project is executed to the project management practices and the requirements with in the contract
➢ Preparing the detail network, schedules (Weekly& Monthly), reports for the multi -disciplineproject
➢ Identify schedule variances and remedial actions to control project duration and reduce impact on
projectbudget
➢ Make recommendation for performance improvement and/ or corrective action tomanagement
➢ Lead timesheet administration and reporting for invoicingpurposes
➢ Interface with all level of project management team and client management for project control issues
andpresentation
➢ Prepare project cashflows
➢ Provide detailed schedule analysis to support projectmanagement
➢ Prepare the project programs like Risk Analysis / delaysanalysis
➢ AssisttheprojectManagerwithvariousreportslikeprogressreport,Costreport,Recoveryplans
,Corrective action plans and Resource Identification
➢ Handling a team of Planners, Estimators, Cost controllers, Contracts administrator, Document
controller and Project Administrator
➢ Working together with Customer to achieve the performance
➢ Preparing the Method statements for the projects ( related to Technical services)
➢ Preparing the Field query for the projects ( related to Technical services)
➢ Review and approve Airport Layout Plan (ALP).
➢ Review and acceptance of forecast.
➢ Airspace and procedure changes
➢ Review and approve Airport Layout Plan (ALP).
➢ Review and acceptance of forecast.
➢ Airspace and procedure changes
➢ Biometric technology, crowd monitoring,

MMG. ( SAUDI ARAMCO PROJECT-(Off shore) -(June’2006 to Dec’2006)


Job title: Project Control Engineer

Reporting:- Planning Engineers- 2,Cost Engr-1

Outlines of Major Responsibilities:

➢ Preparing the project performanceevaluation


➢ Preparing the project schedules for the project on Daily assignments andresources.
➢ Preparing the Resources analysis like Manpower, Equipment, Materials,etc...
➢ Organizing work fronts and co-ordination on dailybasis
➢ Preparing the weekly and monthly project planningreports
➢ Preparing the Look-ahead schedules ( Day to day LookAhead)
➢ Preparing Claims and back charges to sub -contractors
➢ Preparing the Manpower and Equipment recovery plans for theproject
➢ Contracts over viewing and progress comparison with respect toProductivity
➢ Estimation, Costing & Invoice Overviewing
➢ Detailed analysis of Engineering/procurement/Construction Milestones.
➢ Earned value management for the company with respect to budgeted cost.
➢ Responsible to control and monitor project total expenditure including verifying and checking of invoices and claims
from suppliers, vendors and subcontractors to ensure that all project expenditures are captured and properly
recorded.
➢ Provide planning and cost controlling support for all projects which includes variation reporting, monitoring of
milestone progress to the preparation of customer billing processes, etc
➢ Perform and manage project activity scheduling and monitoring
➢ Perform technical and commercial review of EPCI long time tenders (subcontractor’s quotations) for the
preparation of Service agreements
➢ Ensure effective project implementation and utilize productive reports from the creation of WBS with the use of
project management system to monitor the status of all purchases, invoicing and delivery up to the closure of the
project.

P a g e |6 of 6
➢ Prepare monthly vessel movement report for the monitoring of the vessel activities on a daily basis and register all
downtime, consumptions and vessel related issues relating to the project promptly to the project manager and
management.
➢ Coordinate and work with the project management team to resolve project issues to ensure the delivery/completion
of the project work.
➢ Team leader of the Invoicing team

Nasser S. Al-Hajri Company Limited, Qatar ( Dolphin Gas Project with JGC, Qatar)- Apr’2005 to March’2006
Job title: Planning& Cost Engineer Shore/Off

Shore)

Outlines of Major Responsibilities:

➢ Preparing the project performanceevaluation


➢ Preparing the project schedules for theproject
➢ Preparing the Resources analysis like Manpower, Equipment, Materials,etc...
➢ Organizing work fronts andco-ordination
➢ Preparing the weekly and monthly project planningreports
➢ Preparing the Look-aheadschedules
➢ Preparing Claims and backcharges
➢ Preparing the Method statements for theprojects
➢ Preparing the Field query for theprojects
➢ Preparing the Manpower and Equipment recovery plans for theproject
➢ Preparing the Material approvals for theprojects
➢ Contracts over viewing and progresscomparison
➢ Estimation, Costing & Invoice Overviewing

Rasco Building Contracting, UAE(January 2003 thru’ November2004)


Job title: Project Control Engineer ( MEP/ CIVIL)

Outlines of Major Responsibilities:


➢ Preparing the project schedules for theproject
➢ Organizing work charts andco-ordination
➢ Preparing the weekly and monthly project planningreports
➢ Preparing the Look-aheadschedules
➢ Preparing the Manpower and Equipment recovery plans for theproject
➢ Liaison, co-ordination, advising and instructing the Rasco Co Group management personnel, client and sub-
contractorsonallmattersrelativeto,andconcerning,qualityassuranceandcontrolatsite.
➢ Ensured the establishment, implementation and maintenance of all quality assurance/control technical
documentation, both electronic and manual relative to sitecontrol.
➢ Ensuredtheestablishmentofasub-contractorProjectmanagementsystemwhereverrequired.
➢ Ensuredthatalldocumentationwascontrolledinaccordancewiththequalitymanagementprocedures.
➢ Ensured that all works were monitored by means of internal and 3rd partyaudits.
➢ Planning dept. will carrying all the auditingDocumentations
➢ ensured that the following duties were carried out by the individual project controlmanager/engineer
➢ Preparing the Material approvals for theproject

Govt.of Dubai, Rulers Department(January2001 thru’ January 2003)


Job title: Civil Engineer ( Planning) ( MEP/ CIVIL)

Outlines of Major Responsibilities:

➢ Preparing the project schedules for theproject


➢ Organizing works and Projectco-ordination
➢ Preparing the weekly and monthly project planningreports
➢ Preparing the Look-aheadschedules

P a g e |7 of 6
➢ Preparing the Manpower and Equipment schedule for theProject
➢ Preparing the Material approvals for theprojects
➢ Invoicing ( Monthly) and submission of the ProgressReports

Central Ordinance Depot, Pune ( Indian Army Force) (July2000 thru’ Dec 2000)
Job title: Site Construction Engineer

Outlines of Major Responsibilities:


➢ The quality assurance management of all architectural, civil and underground contracts required for the
Hydraulic bay Project with the preparation of all quality assurance handover packages required by the client.
controlling of the manpower’s of more than 700no
➢ Handling of Internationalclients
➢ Preparing drawings by using Autocad
➢ Preparing the Field query for theprojects
➢ supervision of steel fabricationworks
➢ making of bills for theclients
➢ labours supervision and coordination

Bhima Construction group, India(August 1999 thru’ July 2000)


Job title: Planning And Site Coordination Engineer

Outlines of Major Responsibilities:


➢ The quality assurance management of all sub-contractors awarded the architectural, civil, HVAC,
insulationandpaintingcontractsrequiredfortheTrida(Trivandrumdevelopmentauthority)withthe
reviewofallqualityassurancehandoverpackagessuppliedbythesub-contractors.
➢ Co-ordination and conduction of all relevant Engineers and inspections with the applicable local
authority, asrequired.
➢ Preparing the Method statements for theprojects
➢ Preparing the Manpower and Equipment Mobilization and demobilizations fortheProject
➢ Preparing the Material approvals for theprojects

Neo-StructoConstruction Limited, India ( Petrochemical ) (November 1998 thru’ July 1999)


Job title: Civil Engineer

Outlines of Major Responsibilities:


➢ The Supervision of all architectural, civil and structural works required for the CCR and aromatics projects
involved in the expansion of by the generalcontractor.
➢ controlling of the manpower’s of more than300
➢ Handling of Internationalclients
➢ Preparing drawings by using Autocad
➢ Preparing the Field query for theprojects
Kinetic Technology India Ltd (Refinery Project) (May1998 thru’ October 1998)
Positionheld : Civil Engineer(RefractorySupervisor)

Outlines of MajorResponsibilities:

➢ Worked as a Refractory consultant Engineer in thefirm


➢ Preparing the Field query for theprojects
➢ Preparing the Manpower and Equipment recovery plans for theproject
➢ Preparing the Material approvals for theprojects
➢ Preparing the Look-aheadschedules
➢ Handling the clients for progressmeetings
➢ Contracts over viewing and progresscomparison
➢ Estimation, Costing & Invoice Overviewing
➢ The supervision and preparation of all construction documentation, inclusive of, but not limited to,
drawings, specifications, contract documentation, etc. required for the Refinery project in Cochin Refinery.

P a g e |8 of 6
PERSONAL DETAILS

Date of birth : 29-05-1976


Passport Number : Z – 24 39552
Date of issue : 14-10-2008 (RENEWED FROM UAE)
Date of Expiry : 09-06-2023
Emigration status : Emigration clearance not required
License : Valid UAE/ INDIAN driving License
Languages Known : English, Hindi, Tamil, Malayalam,Urdu
Acknowledgement

I hereby declare that whatever is mentioned above is true to the best of my Knowledge

And belief

Manu. G. pillai

P a g e |9 of 6

You might also like