Management Walkthrough (11.03.22)

The document summarizes observations from a management walkthrough of the Twin Residences construction project on November 3, 2022. Several safety issues were observed including unstable scaffolding, poor cable management, improper ladder use and electrical panel cover. Corrective actions were implemented immediately. Other positive observations included proper scaffolding erection, sorting of rebar, availability of safety equipment, pedestrian access provisions, and good housekeeping. The walkthrough was conducted between 2-2:30pm and findings were documented and reviewed by safety, OSH and project management staff.

Uploaded by

Randy Lucas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views3 pages

Management Walkthrough (11.03.22)

The document summarizes observations from a management walkthrough of the Twin Residences construction project on November 3, 2022. Several safety issues were observed including unstable scaffolding, poor cable management, improper ladder use and electrical panel cover. Corrective actions were implemented immediately. Other positive observations included proper scaffolding erection, sorting of rebar, availability of safety equipment, pedestrian access provisions, and good housekeeping. The walkthrough was conducted between 2-2:30pm and findings were documented and reviewed by safety, OSH and project management staff.

Uploaded by

Randy Lucas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

BETONBAU PHIL., INC.

Management Walkthrough Observation


TWIN RESIDENCES PROJECT Date: November 3, 2022 (Thursday) Time: 1400-1430H

#1

Comment: Unstable scaffolding erection, to provide horizontal support.


Corrective Action: additional support was provided.

Action by : HSE/
Issued Date : November 3, 2022 Status: Closed Completion Date: November 3, 2022
Operation

#2

Comment: Poor cable management; to elevate cable wirings.


Corrective Action: Cable was elevated.

Action by : HSE/
Issued Date : November 3, 2022 Status: Closed Completion Date:November 3, 2022
Operation/

#3

Comment: Improper location of Bar bending foot switch.


Corrective Action: Foot switch was place in proper location.

Action by : HSE/
Issued Date : November 3, 2022 Status: Closed Completion Date:November 3, 2022
Operation/

#4

1/3
#4

Comment: Improper use of ladder was observed.


Corrective Action: Ladder was removed at stored properly.

Action by : HSE/
Issued Date : November 3, 2022 Status: Closed Completion Date: November 3 , 2022
Operation/

#5

Comment: To improve the cover of the electrical panel. Corrective Action: .Electrical panel cover was improved.

Action by : HSE/
Issued Date: November 3, 2022 Status: Closed Completion Date:November 5, 2022
Operation

#6

Comment: Proper scaffolding erection was observed.


Good Observation
Action by : HSE/
Issued Date : November 3, 2022
Operation/

#7

Comment: Proper sorting ang piling of rebar stirrup.


Good Observation
Action by : HSE/
Issued Date : November 3, 2022
Operation/

2/3
#8

Comment: Complete set of Oxy acethy was observed.


Good Observation
Action by : HSE/
Issued Date : November 3, 2022
Operation/

#9

Comment: Pedestrian access was provided.


Good Observation
Action by : HSE/
Issued Date : November 3, 2022
Operation/

#10

Comment: Good houskeeping; proper sorting and piling of materials with


demarcation was observed.
Good Observation
Action by : HSE/
Issued Date : November 3, 2022
Operation/

Prepared by: Jaymar L. Tacang Reviewed by: Jessen Canaling Noted by: Jayson Regalado
Safety Officer OSH Practitioner Project Manager

3/3