Standard Operation Procedure (In English)
Standard Operation Procedure (In English)
h) Architectural Drawings
16-3
b) The Development Area Permit Section scrutinizes the building
design and necessary documents
16-4
1.1.2 Building Permit Without D-Map
h) Architectural Drawings
c) If the file is complete, asked for the payment of the Land Registry
verification fees and site inspection fees to Urban Land
Administration Department (ULAD) through the system. If the
16-5
Urban Land Administration Department (ULAD) replies, the
applicant is electronically informed to pay 100% Scrutinization
fees, Land Registry verification fees and site inspection fee. (If
some elements are missing in the application file, the
applicants is informed to modify its application)
Time 15 working days (It counts from when the press release date is
over.)
16-6
Declaration Forms, Procedures, Mapping Procedures, Service Fees
are uploaded on www.ybps.ycdc.gov.mm website to easily download
by public and the original documents are needed to scan and
submit.
1.1.3 Building Completion Certificate (BCC)
16-7
d) If it is complete, the applicant is informed through the
system to pay 25% of scrutinizing fee.
16-8
e) The scanned original National Registration Card of the
applicant (NRC)
h) Architectural Drawings
16-9
r) Declaration of Responsibility signed by the Piling
Company (if needed )
16-10
g) In accordance with the rules, the regulations and
specifications, the Development Area Permit Section
scrutinizes the site inspection report, the projected
building design and documents.
16-11
p) To start the construction, the Licensed Contractor in-charge
of the building pays the guarantee deposit fees for
Building Construction through the system.
16-12
f) Theodolite reading
16-13
e) If the application is complete and the instruction to
approve is got, the applicant is informed through the
system to pay 25% of scrutinizing fee for the Building
Completion Certificate.
16-14
f) The scanned original Demarcation Map (D-Map) issued by
relevant department within 3 years and grant or Evidence
of Land Ownership
h) Architectural Drawings
16-15
t) Declaration of Responsibility signed by the Certified
Professional in-charge of the Deep Excavation Design
(if needed)
16-16
e) Once the payment has been made, the Development
Area Inspection Team, Engineering Department (Water
Flow Management), Engineering Department (Water &
Sanitation), Engineering Department (Roads & Bridges)
and Urban Land Administration Department make
inspection on the construction site.
16-17
j) The Development Area Permit Section will scrutinize
the building design and necessary documents.
Above 12 storey,
16-18
The Signing Status/ Deputy Director General (Chief Engineer)
Rank
i) Theodolite Reading
16-19
l) Outside the façade of the building to install 2 digital
CCTV camera of outdoor type with night vision, of 2
mega pixel and memory storage for up to 30 days and
of UPS or Battery Back Up that can continue to use
cameras and DVRs for 1 hour when electricity goes off.
Proof of availability for public use to cover the road in
front of the building for security
16-20
f) The applicant makes payment electrically.
16-21
h) Photo Report of the existing environment of the projected
building
16-22
The Signing Status/ Staff Officer (Assistant Engineer)
Rank
16-23
d) The Inspection Team sends the Report to the
Development Area Permit Section through the system.
16-24
f) Declaration of Responsibility of the Certified Professional
in-charge of supervising the demolition works
16-25
The Signing Status/ Deputy Director (Assistant Chief Engineer)
Rank