Manpower Reduction Plan
Manpower Reduction Plan
No. of Reduction
Description Projects Plan
Completed 4 16
In process 4 24
To be started 1 3
Total 9 43
Current
Sr. No. Description Department
Deployment
1 Reduction of 2 manpower in powder coating shop Production 15
2 Reduction of manpower in Press shop Production 22
3 Reduction of manpower in Assembly shop Production 11
Reduction of manpower in incoming stores by
4 optimising work Stores 11
Reduction of manpower in Outgoing stores by
5 optimising work Stores 11
6 Reduction in Manpower at Electrical Department E&E 12
Reduce one shift of Powder coating for 100%
7 requirment Production 26
4 7 1 4 Jun-20 Done
4 7 1 4 Jun-20 Done
6 6 1 6 Jun-20 Done
13 13 1 13 Sep-20 In process
To be
3 10 1 3 Nov-20 started
2 2 4 Oct-20 In process