Electric Plans
Electric Plans
6 7 AC 8 10 AC
CL CL
CL CL
PL PL S2
9 11
S2
S1 S1
CL S2
PL PL PL
CL CL
1
S1
15
S2
CL CL
CL CL CL
PL PL S3 5
S3
14 12
17
S1 16
13
CL CL
CL
SCHEDULE OF LOADS
NOCECO
PROTECTION WIRES CONDUCT
CIRCUIT NO. DESCRIPTION VOLT WATT AMPERE
P F AT (TH HN) (PVC PIPE)
GROUND FLOOR SECOND FLOOR C3 4-CLO 220 400 1.82 2 100 15A 2-3.5 sq.mm 15 mm DIA
C11 2-CO 220 360 1.63 2 100 20A 2-5.5 sq.mm 15 mm DIA
3-CO 1-AC 20A 2-CO
C7 20A SPARE
C16 C10 30A
C11 C12 2-CO 220 360 1.63 2 100 20A 2-5.5 sq.mm 15 mm DIA
SPARE 1-AC 30A 20A 1-AC
C17 C12 C13 C13 1-AC 220 2760 12.55 2 100 30A 2-5.5 sq.mm 15 mm DIA
C14 1-CO 220 180 0.81 2 100 20A 2-5.5 sq.mm 15 mm DIA
1-CO 20A 20A 1-CO
C14 C15 C15 1-CO 220 180 0.81 2 100 20A 2-5.5 sq.mm 15 mm DIA
C16 SPARE
GROUND
C17 SPARE
GROUND
TOTAL = 63.59 AMPERES
CONVENIENCE OUTLET 1. ALL ELECTRICAL WORKS AND INSTALLATION SHALL COMPLY WITH THE LATEST
M
EDITION OF PHIL. ELECTRICAL CODE
METER
2. ALL ELECTRICAL WORKS HEREIN SHALL BE EXPERIENCED MEN UNDER THE DIRECT
PIN LIGHT
SUPERVISION OF A FULL TIME LICENSED ELECTRICAL ENGINEER. WORK SHALL BE
NEATLY PLACED, SECURELY FASTENED AND PROPERLY FINISHED.
CEILING LIGHT OUTLET
POWER LINE
3. SERVICE VOLTAGE SHALL BE 220 VOLTS SINGLE PHASE
4. BRANCH CIRCUIT INSTALLATIONS FOR BOTH LIGHTING AND POWER SHALL RUN IN
LIGHTING WIRE LINE PVC PIPES
SWITCH LINE 5. LIGHTING BRANCH CIRCUIT SHALL BE TWO-WIRE 3.5mm + GROUND WIRE IN 15mm DIA.
PVC PIPE
AC AIR CONDITIONING UNIT