0% found this document useful (0 votes)
142 views

Self-Assessment-Checklist

This document is a self-assessment checklist completed by the Development and Security Training Institute Inc. for accreditation of their assessment center. It details the institute's compliance with TESDA requirements for physical structure, administrative documentation, communication facilities, and staff complement needed to assess qualifications like Cookery NC II. Overall, the assessment center meets all requirements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
142 views

Self-Assessment-Checklist

This document is a self-assessment checklist completed by the Development and Security Training Institute Inc. for accreditation of their assessment center. It details the institute's compliance with TESDA requirements for physical structure, administrative documentation, communication facilities, and staff complement needed to assess qualifications like Cookery NC II. Overall, the assessment center meets all requirements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

TESDA-SOP-CO-05-F03

Rev.No.01-07/20/2015

ACCREDITATION OF ASSESSMENTCENTER
SELF-ASSESSMENT CHECKLIST

Name of Assessment Center- CGROUP SKILLS


Applicant Development and Security Training Institute Inc.
Address Lot 56 Blk LCH-220 Pajo St., Quirino 2C, Quezon City
(8)-289-85-11 Email
Contact Number [email protected]
loc. 106 address
Title of Qualification Applied for COOKERY NC II
Date Accomplished October 17, 2022

A. PHYSICAL STRUCTURE
Quantity
Item Remarks
Required Existing
A.1 Location and Area
A.1.1. Accessibility Accessible to public
transport  COMPLIED
A.1.2. Assessment area Minimum area provided to
permits ample workplace
for  COMPLIED
candidates

A.2. Lighting and Ventilation


A.2.1. Assessment room or
laboratories
Well lighted  COMPLIED

A.2.2. Air conditioning unit Optional  COMPLIED


Quantity shall be according
A.2.3. Blowers/fans to the size of the room  COMPLIED
A.3 Auxiliary Room
Storeroom for tools,
materials  COMPLIED
A.3.1. Storeroom
Bins/racks for critical
materials  COMPLIED
Must be able to
A.3.2. Room for performance
assessment
accommodate at least 10  COMPLIED
candidates/ batch
A.3.3. Chairs and tables
A.3.4. Comfort rooms
Clean and functional  COMPLIED
Separate for male and
female  COMPLIED
Located at convenient part
of the building  COMPLIED
A.4. Assessment Equipment, Hand tools, Supplies, Materials
In accordance with the list
A.4.1. Equipment in the Competency  COMPLIED
A.4.2. Hand tools Assessment Tools /Training  COMPLIED
Regulations of the
A.4.3. Supplies, materials Qualification/s applied for 
COMPLIED

A.5. Safety Provisions


A.5.1. Medicine cabinet With first aid kit and other COMPLIED
medical paraphernalia 
A.5.2. Open floor spaces Entrances and exits are
maintained  COMPLIED
A.5.3. Work stations, tool Are appropriately grouped
panels and equipment to provide ease of  COMPLIED
movement
A.5.4. Fire extinguishers Functional/ expiration date  COMPLIED
Located in conspicuous
and highly accessible  COMPLIED
locations/ places
A.5.5. Equipment lay out Arranged according to
sequence of operations to
allow maximum use of  COMPLIED
resources

B. Administrative
B.1.Documentary 1. Letter of Intent  COMPLIED
Requirements
2. SEC Registration or
equivalent (CDA-
registered, RA, except  COMPLIED
Sole Proprietorship)

3. Financial Statement  COMPLIED


4. Business Permit  COMPLIED
5. BIR Registration  COMPLIED
6. Company Profile  COMPLIED
7. Organizational
structure  COMPLIED
8. Staff complement and
profile  COMPLIED
9. Building lay out/ Floor
plan  COMPLIED
10. Self-assessment
checklist  COMPLIED
11. List of equipment/
tools and materials  COMPLIED
12. Location map  COMPLIED
13. Lease Contract/ Proof
of Ownership of the
location/premises of  COMPLIED
the Assessment
Center
14. Fire Safety Certificate  COMPLIED
B.2. Communication 1. Telephone/cell phone  COMPLIED
Facilities
2. Fax machine/ internet
connection  COMPLIED
3. Computer with
peripherals  COMPLIED
4. CCTV camera  COMPLIED
B.3. Staff Complement
Genesis S. Sto.  COMPLIED
B.3.1. Manager
Domingo
B.3.2. Cashier Arlan V. Consuelo  COMPLIED
B.3.3. Computer Operator/  COMPLIED
Arnulfo P. Lipata
Data Encoder
B.3.4. Liaison Officer John Jasper S. Estrella  COMPLIED
Marjorie Jazel C.  COMPLIED
B.3.5. Processing Officer
Barbasina
List of Tools and Equipment shall be based on the requirements identified in the Competency Assessment
Tools/Training Regulations
Submitted by: Name:
Signature:
DR. GENESIS S. STO. DOMINGO

Position/Designation:

SCHOOL ADMINISTRATOR/ Date of Submission:


October 17, 2022
ASSESSMENT CENTER MANAGER

You might also like