Introduction
Introduction
BACKGROUND, SECTIONS OF
MyTripGen 2020, PURPOSE AND
SCOPE, GLOSSARY,
SCOPE OF DATA, TRIP
GENERATION GRAPHS &
TABLES FORMAT
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
1.1 BACKGROUND
The Malaysian Trip Generation Manual 2021 to September 2021 for this study.
(MyTripGen) 2020 is the 5th Edition of Newer versions of the Manual were
Malaysia Trip Generation Manual aims to published at the end of each phase.
provide transportation engineers and
planners with guidance for estimating the Expansion of trip generation database
amount of traffic that would be expected has been continuously made over the
to be generated by a new development or years to improve the overall quality of the
expansion of an existing land use. As original manual in order to gain greater
indicated in Figure 1.1, the database of confidence and acceptance of the trip
the Malaysian traffic-land use relationship rates and equations among transport
was developed in year 1995 – 1996 with practitioners in the country.
255 numbers of site surveys in Trip
However, the current 5th Edition of the
Generation Pilot Study. Subsequently, in
database between the previous manual
year 2000 – 2010, there are 306, 315 and
and current MyTripGen 2020 are non-
355 numbers of site surveys respectively
compatible due to huge gap of trip rates
for Trip Generation Phase II Study to Trip
between existing data (MTGM 2010) and
Generation Phase IV Study.
new data. MyTripGen 2020 covers all
land use types from sites located all over
MyTripGen 2020 study was done during
the country. The land use categories in
the Pandemic Covid-19 period which
MyTripGen 2020 has been updated with
started in March 2020. Total number of
PLANMalaysia Manual GIS Rancangan
205 site surveys was done within March
Pemajuan Versi 2.0 as a guide.
1-1
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
Users of MyTripGen 2020 are urged to read the introductory sections of the manual
prior to using the trip rate relationship. An index for land use codes and description are
respectively provided in Sections 3 and 4 and should be referred to establish land use
type.
1-2
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
MyTripGen 2020 enables practitioners to The road authority can impose specified
predict the number of vehicle trips LOS requirements on the development
generated by a specific land use during proponent to maintain a designated LOS
planning stage of development or by upgrading existing junctions or road
expansion of existing development. link. If the development proponent lacks
Generated trip equations or rates are the financial resources for junction or
proportioned into trip attraction (IN) and road link upgrades, then the proposed
trip production (OUT). In many instances, level of development can be scaled down
these extra trips adversely impact or reduced accordingly to commensurate
existing levels of traffic demand, normally with the generated trips. It is therefore
quantified in terms of Level of Service important to accurately predict the
(LOS) as illustrated in Figure 1.2. number of trips expected from a planned
development.
LOS LOS LOS LOS LOS LOS
A B C D E F
The context of the study needs to be
Worse traffic performance viewed from the development process
and progress perspective of the physical
Figure 1.2: Level of Service (LOS) built environment currently being taken.
All efforts are being made to ensure that
The manual is therefore an important
the various problems that occur with this
document for preparing and reviewing
form of development are avoided by
traffic impact assessment or small area
undertaking prudent steps in the planning
traffic studies which often required by
stage. With the widespread use of
government agencies as part of planning
MyTripGen 2020 and associated
approval processes. The trip generation
procedures in the planning process, the
forecasting step forms one small step in
sustainability of road network can be
such traffic studies. Since it is the
maintained even with further increase of
foundation or the first step taken in the
traffic volumes on the road network, thus
traffic planning process, it has direct
allowing for efficient and economic
impacts on the internal traffic circulation,
movement of people and goods.
roadway capacity, signalized junction
operations and, at times, funding of off-
site improvements.
1-3
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
1.4 GLOSSARY
There are several key terminologies that will be used throughout MyTripGen 2020.
Some terminologies may sound customary but have its own technical meaning. A
glossary of several terms to enhance understanding of the manual and to serve as a
quick reference for the user is as follows:
ORIGIN
(TRIP START)
A
B
DESTINATION
(TRIP END)
1-4
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
1-5
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
Average Rate This corresponds to the average trip rate value that is
Value obtained from averaging the individual trip rates for all sites
considered for a particular land use in the trip generation
process.
Regression This is a formula that relates the predicted trips (Y) to the
Formula land use variable/parameter (X) which is considered to
have a direct relationship to the trips generated by that
land use.
1-6
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
1-7
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
The initial approach intended to be Hence, existing data from MTGM 2010
adopted in this MyTripGen was to was re-analysed and new improved trip
improve the previous MTGM 2010 data generation equations were derived
by adding trip generation data from new without adding the new data collected
sites. However, the approach of adding during pandemic. There will be two (2)
new data collected to the previous 2010 parts of data in this MyTripGen as
trip generation data could not be done shown. These two (2) parts will be
due to the advent of Covid-19 pandemic distinctly kept separated as to their
as the traffic condition is envisaged to be applicability in the professional use of the
different from normal condition. Manual. Some land uses only present
one (1) type of data, while some presents
both.
1-8
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
Improved trip generation The vehicle and passenger car unit trip
2010 Data
equations & tables based on rates in this manual are intended for sites
A MTGM 2010 data for normal
with small area traffic studies rather than
traffic situation.
regional transport studies. Regional
New trip generation data transport studies often define and
Pandemic
Covid-19
comprising of equations
B
Data
and tables derived using calculate trips differently from site traffic
trip generation data during studies and small area traffic studies. The
Covid-19. database in this manual covers a wide
range of land use types and reflects
The data collection for this study focused
geographic differences between trip
on vehicle trip and equivalent passenger
generations in various states in Malaysia.
car unit (PCU) trip rates to measure
To achieve this comprehensiveness,
stand-alone land use developments.
sample sizes are less than those aspired
These stand-alone development survey
for most land use categories. Subsequent
sites generally reflect modern design
efforts are needed to expand the
practices, which provide adequate on-site
database to better statistical confidence
parking and are oriented towards
needs.
automobiles for site access. This type of
modern development is dominant in
Malaysia.
1-9
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
Simple analysis summary sheets for each land use category surveyed have been
developed and included in the manual. Five (5) graphs are presented in each sub-
category, which describes as in Figure 1.6 and illustration for five (5) different graphs
and tables are shown in Figure 1.7.
AM Peak Hour of Commuter
Figure 1.7: Illustration for five (5) different graphs and tables
1-10
Ministry of Works Malaysia
SECTION 1: INTRODUCTION
MyTripGen 2020
On the right-side of each graph, one (1) table is shown. The data presented in the table
is as described in Figure 1.8.
5-28
1-11