Electrical Scope

The document provides a scope of work and bill of materials for electrical and instrumentation components for a 35MW geothermal power project. It includes items for the generator, power transformer, switchgear, outdoor switchyard, emergency service system, control equipment, lighting, and other miscellaneous components.

Uploaded by

sparkCE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views12 pages

Electrical Scope

The document provides a scope of work and bill of materials for electrical and instrumentation components for a 35MW geothermal power project. It includes items for the generator, power transformer, switchgear, outdoor switchyard, emergency service system, control equipment, lighting, and other miscellaneous components.

Uploaded by

sparkCE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

1.

2 SCOPE OF WORK AND BOM FOR ELECTRICAL, I&C


Project :1 x 35MW Geothermal Power Project
ITEM DESCRIPTION EMP CA ME

E.1 Generator and Auxiliaries


E.1.1 Generator Neutral Grounding Cubicle M F

E.2 Power Transformer


E.2.1 Main Transformer

E.2.1.1 Main Transformer(Main Body) M F

E.2.1.2 Radiators M F
E.2.1.3 Main Conservator M F
E.2.1.4 HV Bushing M F
E.2.1.5 Others(Piping, Terminal box, etc.) M F
E.2.2 Unit Auxiliary Transformer M F
E.2.3 Auxiliary Transformer M F

E.3 Switchgear and Electrical Panel


E.3.1 11kV Generator Circuit Breaker M F
E.3.1 11kV Station Service Circuit Breaker M F
E.3.2 Generator VT/SA Cubicle M F
E.3.3 13.2kV Switchgear M F
E.3.4 6.9kV Switchgear M F
E.3.5 415V Switchgear M F
E.3.6 415V Non-Essential Control Center M F
E.3.7 415V Essential Control Center M F
E.3.8 415/240V Miscellaneous Distribution Board M F

E.4 220kV Outdoor Switchyard


E.4.1 220kV SF6 Gas Breaker(with CH, LA, ES) M F
E.4.2 220kV Disconnecting Switch M F
E.4.3 220kV Take-Off Structure M F
E.4.4 220kV Trolley wire M F

E.5 Emergency Service System


5.1 Emergency Diesel Generator
E.5.1.1 Main Body Skid with Gen & Engine M F
E.5.1.2 Aeration Hood M F
E.5.1.3 Aeration Duct M F
E.5.1.4 Exhaust Duct (Lower) M F
E.5.1.5 Exhaust Duct (Upper) M F
E.5.1.6 Exhaust Duct (Outlet) M F
E.5.1.7 Exhaust Silencer M F
E.5.1.8 Exhaust Outlet Piping M F
E.5.1.9 Window Pressure Shatter M F
E.5.1.10 Exhaust Inlet Piping M F
E.5.1.11 Fuel Oil Piping with valve & fitting M F
E.5.2 110V DC Battery Charger M F
E.5.3 UPS DC Battery Charger M F
E.5.4 110V DC Distribution Board M F
E.5.5 Uninterruptible Power Supply M F
E.5.6 DC Motor Starting Panel M F
E.5.7 Battery for EOP M F
E.5.8 Battery for UPS M F

E.6 Telephone, Internal Communication and Clock System


E.6.1 Telephone System M/F
E.6.2 Public Address System M/F
E.6.3 Clock System M/F

E.7 Control, Protection & Monitoring Equipment


E.7.1 Generator & Transformer Protection Relay Panel M F
E.7.2 Revenue Metering Panel M F
E.7.3 Turbine & Generator Regulation Cubicle M F
E.7.4 Turbine Protection Panel M F
E.7.5 Remote Monitoring System M F
E.7.6 Distributed Control System (for STG) M F
E.7.7 Distributed Control System (for BOP) M F
E.7.8 Turbine Supervisory Instrument Panel M F
E.7.9 Protection Panel Switchyard M F
E.7.10 Interface Panel Switchyard M F
E.7.11 240V UPS Distribution Board M F
E.7.12 Synchronizing Panel M F
E.7.13 Operator Console Desk (OWS) M F
E.7.14 Operator Console Desk (OWS) M F
E.7.15 Operator Console Desk (Historian) M F
E.7.16 Operator Console Desk (EWS) M F
E.7.17 Operator Console Desk (Printer) M F
E.7.18 Operator Console Desk (Printer) M F
E.7.19 Operator Console Desk (Printer) M F
E.7.20 Operator Console Desk (Printer) M F
E.7.21 Metering Panel Switchyard M F
E.7.22 Fire Protection Control Panel M/F

E.8 Lighting and Earthing


E.8.1 Lighting Panel for Electrical Building M/F
E.8.2 Lighting Panel for Outdoor Area M/F
E.8.3 Emergency Lighting panel M/F

E.9 Other
E.9.1 High Voltage power Cable M F
E.9.2 Medium Voltage Power Cable M F
E.9.3 Low Voltage Power Cable M F
E.9.4 Control Cable M F
E.9.5 Instrument Cable M F
E.9.6 Other Cable M F

E.9.7 Cable Termination M F

E.9.8 Cable Tray M F


E.9.9 Cable Tray Support M F
E.9.10 Conduit Pipe M F
E.9.11 Exposed earhing M F
E.9.12 Lightning M F

E.9.13 Field Instrument M F

E.9.14 Level Gauge & transmitter Piping M F


E.9.15 Instrument impulse Piping M F
E.9.16 Instrument control air piping M F
Legend 1:
EMP: Employer, ME: Mechanical and Electrtical Work Contractor, CA: Civil and Architectual Contractor
Legend 2:
M: Material Supply, F: Field Work
Bill of Quantity Remarks

(L)2.4m x (W)1.1m x (H)2.5m, 1.5ton 1 cubicle

Main Transformer will be assembled at site.


Insulation oil treatment is required at field.
(L)4.0m x (W)2.2m x (H)3.0m, 45.0ton Bushing and Conservator to be mounted on tank at
site.
1.0ton/pc TOTAL 3pcs
0.8ton/pc
0.6ton/pc TOTAL 3pcs
3.4ton/sets
19ton(full assembled at shop)
12ton(full assembled at shop)

1pc-4.1ton
1pc-2.5ton, 1pc=1.0ton TOTAL 2pcs
N/A Included ITEM No.E.3.3
(L)2.4m x (W)6.6m x (H)2.65m, 13.5ton 6 cubicles
(L)2.8m x (W)4.5m x (H)2.35m, 6.2ton 4 cubicles
(L)1.8m x (W)5.2m x (H)2.35m, 6.4ton 5 cubicles
(L)0.6m x (W)1.83m x (H)2.35m, 1.2ton 3 cubicles
(L)0.6m x (W)1.83m x (H)2.35m, 1.2ton 3 cubicles
(L)1.0m x (W)2.4m x (H)2.35m, 2.5ton 3 cubicles

2.0ton/pc TOTAL 3pcs


1.2ton/pc TOTAL 3pcs
1.5ton/set TOTAL 2sets
1c x 35sq x 3sets (TOTAL 60m)

2.4ton
0.7ton
0.5ton
1.0ton
0.7ton
0.3ton
0.8ton
0.2ton
0.1ton
0.05ton
50kg/sets
(L)0.8m x (W)1.2m x (H)2.0m, 0.6ton 2 cubicles
(L)0.8m x (W)1.2m x (H)2.0m, 0.6ton 1 cubicle
(L)1.0m x (W)1.1m x (H)2.35m, 2.8ton 1 cubicle
(L)1.2m x (W)2.0m x (H)2.65m, 1.3ton 2 cubicles
(L)0.6m x (W)0.6m x (H)2.35m, 0.4ton 1 cubicle
(L)4.0m x (W)1.1m x (H)2.0m, 6.0ton
(L)4.0m x (W)1.1m x (H)2.0m, 6.0ton

Civil Contractor
Civil Contractor
Civil Contractor

(L)1.0m x (W)2.0m x (H)2.35m, 1.0ton 1 Cubicle


(L)0.9m x (W)0.6m x (H)2.35m, 0.6ton 1 Cubicle
(L)0.9m x (W)2.0m x (H)2.5m, 1.4ton 3 Cubicles
(L)0.9m x (W)1.2m x (H)2.35m, 0.6ton 1 Cubicle
(L)0.3m x (W)0.7m x (H)0.7m, 0.1ton 1 Cubicle, Wall mount
(L)0.8m x (W)3.6m x (H)2.0m, 1.4ton 3 Cubicles
(L)0.8m x (W)3.2m x (H)2.0m, 1.3ton 3 Cubicles
(L)0.9m x (W)0.9m x (H)2.35m, 0.5ton 1 Cubicle
(L)1.2m x (W)0.8m x (H)2.35m, 0.5ton 1 Cubicle
(L)0.8m x (W)0.8m x (H)2.25m, 0.3ton 1 Cubicle
(L)1.0m x (W)1.1m x (H)2.35m, 0.8ton 1 Cubicle
(L)0.9m x (W)1.2m x (H)2.35m, 0.8ton 1 Cubicle
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)0.8m x (W)0.8m x (H)2.25m, 0.5ton 1 Cubicle
Civil Contractor

Civil Contractor
Civil Contractor
Civil Contractor

Refer to attachment A07-06 "Cable BQ"


Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"

Refer to attachment A07-11"Cable Terminals BQ" &


A07-12"Cable Termination Kits BQ"

Refer to attachment A07-07 "Cable ladder& Support BQ"


Refer to attachment A07-07 "Cable ladder& Support BQ"
Refer to attachment A07-08 "Exposed conduit BQ"
Refer to attachment A07-09 "Earthing material BQ"
Refer to attachment A07-10 "Lightning materila BQ"

LT=Level Transmitter
LS=Level Switch
PT=Pressure Transmitter
FT=Flow Transmitter
LT=4pcs, LS=9pcs, PT=14pcs, FT=6pcs, AT=2pcs, PI=26pcs,
AT=Analysis Transmitter
DPI=4pcs, TT=7pcs, TI=17pcs
PI=Pressure Indicator
DPI=Differential Pressure Indicator
TT=Temperature Transmitter
TI=Temperature Indicator

Refer to attachment A08-03 "Level piping material BQ"


Refer to attachment A08-04 "Implus piping material BQ"
Refer to attachment A08-02 "instrument air piping material BQ"
ectual Contractor
Completion time