1.
2 SCOPE OF WORK AND BOM FOR ELECTRICAL, I&C
Project :1 x 35MW Geothermal Power Project
ITEM DESCRIPTION EMP CA ME
E.1 Generator and Auxiliaries
E.1.1 Generator Neutral Grounding Cubicle M F
E.2 Power Transformer
E.2.1 Main Transformer
E.2.1.1 Main Transformer(Main Body) M F
E.2.1.2 Radiators M F
E.2.1.3 Main Conservator M F
E.2.1.4 HV Bushing M F
E.2.1.5 Others(Piping, Terminal box, etc.) M F
E.2.2 Unit Auxiliary Transformer M F
E.2.3 Auxiliary Transformer M F
E.3 Switchgear and Electrical Panel
E.3.1 11kV Generator Circuit Breaker M F
E.3.1 11kV Station Service Circuit Breaker M F
E.3.2 Generator VT/SA Cubicle M F
E.3.3 13.2kV Switchgear M F
E.3.4 6.9kV Switchgear M F
E.3.5 415V Switchgear M F
E.3.6 415V Non-Essential Control Center M F
E.3.7 415V Essential Control Center M F
E.3.8 415/240V Miscellaneous Distribution Board M F
E.4 220kV Outdoor Switchyard
E.4.1 220kV SF6 Gas Breaker(with CH, LA, ES) M F
E.4.2 220kV Disconnecting Switch M F
E.4.3 220kV Take-Off Structure M F
E.4.4 220kV Trolley wire M F
E.5 Emergency Service System
5.1 Emergency Diesel Generator
E.5.1.1 Main Body Skid with Gen & Engine M F
E.5.1.2 Aeration Hood M F
E.5.1.3 Aeration Duct M F
E.5.1.4 Exhaust Duct (Lower) M F
E.5.1.5 Exhaust Duct (Upper) M F
E.5.1.6 Exhaust Duct (Outlet) M F
E.5.1.7 Exhaust Silencer M F
E.5.1.8 Exhaust Outlet Piping M F
E.5.1.9 Window Pressure Shatter M F
E.5.1.10 Exhaust Inlet Piping M F
E.5.1.11 Fuel Oil Piping with valve & fitting M F
E.5.2 110V DC Battery Charger M F
E.5.3 UPS DC Battery Charger M F
E.5.4 110V DC Distribution Board M F
E.5.5 Uninterruptible Power Supply M F
E.5.6 DC Motor Starting Panel M F
E.5.7 Battery for EOP M F
E.5.8 Battery for UPS M F
E.6 Telephone, Internal Communication and Clock System
E.6.1 Telephone System M/F
E.6.2 Public Address System M/F
E.6.3 Clock System M/F
E.7 Control, Protection & Monitoring Equipment
E.7.1 Generator & Transformer Protection Relay Panel M F
E.7.2 Revenue Metering Panel M F
E.7.3 Turbine & Generator Regulation Cubicle M F
E.7.4 Turbine Protection Panel M F
E.7.5 Remote Monitoring System M F
E.7.6 Distributed Control System (for STG) M F
E.7.7 Distributed Control System (for BOP) M F
E.7.8 Turbine Supervisory Instrument Panel M F
E.7.9 Protection Panel Switchyard M F
E.7.10 Interface Panel Switchyard M F
E.7.11 240V UPS Distribution Board M F
E.7.12 Synchronizing Panel M F
E.7.13 Operator Console Desk (OWS) M F
E.7.14 Operator Console Desk (OWS) M F
E.7.15 Operator Console Desk (Historian) M F
E.7.16 Operator Console Desk (EWS) M F
E.7.17 Operator Console Desk (Printer) M F
E.7.18 Operator Console Desk (Printer) M F
E.7.19 Operator Console Desk (Printer) M F
E.7.20 Operator Console Desk (Printer) M F
E.7.21 Metering Panel Switchyard M F
E.7.22 Fire Protection Control Panel M/F
E.8 Lighting and Earthing
E.8.1 Lighting Panel for Electrical Building M/F
E.8.2 Lighting Panel for Outdoor Area M/F
E.8.3 Emergency Lighting panel M/F
E.9 Other
E.9.1 High Voltage power Cable M F
E.9.2 Medium Voltage Power Cable M F
E.9.3 Low Voltage Power Cable M F
E.9.4 Control Cable M F
E.9.5 Instrument Cable M F
E.9.6 Other Cable M F
E.9.7 Cable Termination M F
E.9.8 Cable Tray M F
E.9.9 Cable Tray Support M F
E.9.10 Conduit Pipe M F
E.9.11 Exposed earhing M F
E.9.12 Lightning M F
E.9.13 Field Instrument M F
E.9.14 Level Gauge & transmitter Piping M F
E.9.15 Instrument impulse Piping M F
E.9.16 Instrument control air piping M F
Legend 1:
EMP: Employer, ME: Mechanical and Electrtical Work Contractor, CA: Civil and Architectual Contractor
Legend 2:
M: Material Supply, F: Field Work
Bill of Quantity Remarks
(L)2.4m x (W)1.1m x (H)2.5m, 1.5ton 1 cubicle
Main Transformer will be assembled at site.
Insulation oil treatment is required at field.
(L)4.0m x (W)2.2m x (H)3.0m, 45.0ton Bushing and Conservator to be mounted on tank at
site.
1.0ton/pc TOTAL 3pcs
0.8ton/pc
0.6ton/pc TOTAL 3pcs
3.4ton/sets
19ton(full assembled at shop)
12ton(full assembled at shop)
1pc-4.1ton
1pc-2.5ton, 1pc=1.0ton TOTAL 2pcs
N/A Included ITEM No.E.3.3
(L)2.4m x (W)6.6m x (H)2.65m, 13.5ton 6 cubicles
(L)2.8m x (W)4.5m x (H)2.35m, 6.2ton 4 cubicles
(L)1.8m x (W)5.2m x (H)2.35m, 6.4ton 5 cubicles
(L)0.6m x (W)1.83m x (H)2.35m, 1.2ton 3 cubicles
(L)0.6m x (W)1.83m x (H)2.35m, 1.2ton 3 cubicles
(L)1.0m x (W)2.4m x (H)2.35m, 2.5ton 3 cubicles
2.0ton/pc TOTAL 3pcs
1.2ton/pc TOTAL 3pcs
1.5ton/set TOTAL 2sets
1c x 35sq x 3sets (TOTAL 60m)
2.4ton
0.7ton
0.5ton
1.0ton
0.7ton
0.3ton
0.8ton
0.2ton
0.1ton
0.05ton
50kg/sets
(L)0.8m x (W)1.2m x (H)2.0m, 0.6ton 2 cubicles
(L)0.8m x (W)1.2m x (H)2.0m, 0.6ton 1 cubicle
(L)1.0m x (W)1.1m x (H)2.35m, 2.8ton 1 cubicle
(L)1.2m x (W)2.0m x (H)2.65m, 1.3ton 2 cubicles
(L)0.6m x (W)0.6m x (H)2.35m, 0.4ton 1 cubicle
(L)4.0m x (W)1.1m x (H)2.0m, 6.0ton
(L)4.0m x (W)1.1m x (H)2.0m, 6.0ton
Civil Contractor
Civil Contractor
Civil Contractor
(L)1.0m x (W)2.0m x (H)2.35m, 1.0ton 1 Cubicle
(L)0.9m x (W)0.6m x (H)2.35m, 0.6ton 1 Cubicle
(L)0.9m x (W)2.0m x (H)2.5m, 1.4ton 3 Cubicles
(L)0.9m x (W)1.2m x (H)2.35m, 0.6ton 1 Cubicle
(L)0.3m x (W)0.7m x (H)0.7m, 0.1ton 1 Cubicle, Wall mount
(L)0.8m x (W)3.6m x (H)2.0m, 1.4ton 3 Cubicles
(L)0.8m x (W)3.2m x (H)2.0m, 1.3ton 3 Cubicles
(L)0.9m x (W)0.9m x (H)2.35m, 0.5ton 1 Cubicle
(L)1.2m x (W)0.8m x (H)2.35m, 0.5ton 1 Cubicle
(L)0.8m x (W)0.8m x (H)2.25m, 0.3ton 1 Cubicle
(L)1.0m x (W)1.1m x (H)2.35m, 0.8ton 1 Cubicle
(L)0.9m x (W)1.2m x (H)2.35m, 0.8ton 1 Cubicle
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)1.2m x (W)0.8m x (H)0.8m, 0.1ton
(L)0.8m x (W)0.8m x (H)2.25m, 0.5ton 1 Cubicle
Civil Contractor
Civil Contractor
Civil Contractor
Civil Contractor
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-06 "Cable BQ"
Refer to attachment A07-11"Cable Terminals BQ" &
A07-12"Cable Termination Kits BQ"
Refer to attachment A07-07 "Cable ladder& Support BQ"
Refer to attachment A07-07 "Cable ladder& Support BQ"
Refer to attachment A07-08 "Exposed conduit BQ"
Refer to attachment A07-09 "Earthing material BQ"
Refer to attachment A07-10 "Lightning materila BQ"
LT=Level Transmitter
LS=Level Switch
PT=Pressure Transmitter
FT=Flow Transmitter
LT=4pcs, LS=9pcs, PT=14pcs, FT=6pcs, AT=2pcs, PI=26pcs,
AT=Analysis Transmitter
DPI=4pcs, TT=7pcs, TI=17pcs
PI=Pressure Indicator
DPI=Differential Pressure Indicator
TT=Temperature Transmitter
TI=Temperature Indicator
Refer to attachment A08-03 "Level piping material BQ"
Refer to attachment A08-04 "Implus piping material BQ"
Refer to attachment A08-02 "instrument air piping material BQ"
ectual Contractor
Completion time