0% found this document useful (0 votes)
138 views

Handing Over Letter

Reliance Engineering & Construction Services has completed the installation of two fire water tanks at the ZOT Complex in Karachi for Pakistan State Oil Company Limited. The letter informs PSO that the project was finished on February 18, 2021 and handed over on February 22, 2021. Reliance thanks PSO for their support during the project and requests acknowledgment of the letter for final invoicing.

Uploaded by

M Waqas Habib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views

Handing Over Letter

Reliance Engineering & Construction Services has completed the installation of two fire water tanks at the ZOT Complex in Karachi for Pakistan State Oil Company Limited. The letter informs PSO that the project was finished on February 18, 2021 and handed over on February 22, 2021. Reliance thanks PSO for their support during the project and requests acknowledgment of the letter for final invoicing.

Uploaded by

M Waqas Habib
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

NTN.

3421753-3
GST. 17-00-3421-753-13
PEC. C4-12524
ISO 9001:2008
QAIC/PK/20206-A

RECS/PSO/ZOT/HO/02
22 February 2021

M/s Pakistan State Oil Company Limited,


PSO ZOT Complex,
Karachi, Pakistan.
Tel: 111-111-776.

Subject: FIRE WATER TANKS PROJECT HANDING OVER

Project Name: Installation of fire water tanks roof 2 nos at ZOT Complex
Location: ZOT (Port Qasim)
Service Order No: 4110028284
Dated: 10-08-2020

Reference to the above, we hereby would like to inform you with great pleasure that we have
completed the internal coating & installation of fire water tanks roofs 2 nos at ZOT, Karachi as on
dated 18-02-2021 and Box up 22-02-2021.The work has come up very well and validation of the
project has been well within the guidelines prescribed as you might have observed.

We would like to take this opportunity to thank you upfront for your kind support during the project
duration and your valuable suggestions had indeed helped us to gain the shape of the project.

We hereby would like to hand over the fire water tanks to you through this formal letter. Request
your kind acknowledgment of this letter to proceed with further documentation and reference for final
invoice.

Regards,

For Reliance Engineering & Construction Services

WAQAS HABIB
Mechanical Engineer

Head Office & Works: Karachi Office:


Plot # 267, Multan Industrial Estate, Phase II, House # R55, Jinah Housing Society,
Multan. Pakistan. Malir Halt, Karachi. Pakistan.
Contact # 0331-2825092, 0309-4318850 Contact # 021-34590155, 0332-3441169
Email: [email protected] Email: [email protected]

You might also like