Risk Assessment - Installation of Safety Zone Wolf Area

This risk assessment document evaluates the risks associated with installing a hot wire inside the wolf exhibit at Al Ain Zoo. It identifies three key risks: 1) slips, trips, and falls during mobilization of equipment; 2) musculosketal disorders from manual handling of materials; and 3) injuries from falls when working on ladders to install brackets and hotwire. Control measures are outlined to reduce the likelihood and severity of incidents, including barricading work areas, using mechanical aids, providing PPE, training workers, and inspecting ladders before use. The responsibilities of the project engineer, HSE engineer, site engineer, and foreman are defined to manage the risks.

Uploaded by

JIHUL GEORGE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views10 pages

Risk Assessment - Installation of Safety Zone Wolf Area

This risk assessment document evaluates the risks associated with installing a hot wire inside the wolf exhibit at Al Ain Zoo. It identifies three key risks: 1) slips, trips, and falls during mobilization of equipment; 2) musculosketal disorders from manual handling of materials; and 3) injuries from falls when working on ladders to install brackets and hotwire. Control measures are outlined to reduce the likelihood and severity of incidents, including barricading work areas, using mechanical aids, providing PPE, training workers, and inspecting ladders before use. The responsibilities of the project engineer, HSE engineer, site engineer, and foreman are defined to manage the risks.

Uploaded by

JIHUL GEORGE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Rev : 01

LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for


Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:1 of 10
Installation

ENVIRONMENT, HEALTH AND SAFETY RISK ASSESSMENT


Risk Assessment for Additional work for Gorilla (B.O.H), Wolf Dense and Sand cat area Al Ain Zoo
Activity: - INSTALLATION OF HOT WIRE INSIDE THE WOLF EXHIBIT

Date 20/10/2022 Rev-01 Location WOLF EXHIBIT Doc no. LG-EHS/RA-AZ-


HPE-007-22
Activity/ Risk Residual
Risk Control measures Ref doc Responsi
Sn storage Who is Hazard level risk
process at risk bility
S L R
S L R
COP-04
• Area should be barricaded First
• Use mechanical handling aid,
Mobilization • • Potential rather than manual handling
1 of the site Employe Slips/Trips/F physical • First Aid kits to be COP-02
es , alls • injury mobilized at site to be used PPE Project
visitors Insecure hand • Damage when the need arises. use, Engineer,
and footholds 3 3 9 to • Ensure efficient 2 1 2 Site
during equipment supervision all along the COP-21 Engineer,
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:2 of 10
Installation

manual while activity Permit Hse


handling unloading • Provide necessary training to work Engineer,
unloading about manual handling and COP-14 Forman
Insecure ergonomics issues Manual
handling of • All Personal must been handlin
materials.(Br given safety induction or g
ackets, solid orientation about the plant
wire roll, ) and project they are about to
work
• Regular inspection of
competent safety personal
ensured
PPE:
• All personal must provide
basic PPEs like hard hats,
safety jackets, safety shoes
• Dust mask, Ear plugs,
Goggles and Safety Gloves
should be provided up on
activity
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:3 of 10
Installation

COP-04
work- 1. Site engineer/in charge First
related will ensure that all workers aid,
2 Manual musculosk are handling affordable
handling Employe eletal work loads COP-02
disorders
es , 2.proper storage of PPE Project
(MSDs)
visitors such as
materials should proceed for use, Engineer,
pain and safe handling of materials Hse
3 3 9 injuries to 3. Should include the topic COP-21 2 2 4 Engineer,
arms, legs manual handling in Tool Permit Forman
and joints, box talk. to work
and COP-14
repetitive Manual
strain handlin
injuries of g
various
sorts.
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:4 of 10
Installation

Ladders: COP-04
3 Working on *Overreachi . First
ladder for the Employe (i) where ladders or aid,
work of es , ng when stepladders are being used
installing visitors working on a outside they are not used in COP-02
brackets and the event of high winds or PPE
ladder inclement weather;
hotwire use,
installation *Using the Head Project
injury, (ii) before ladders are used COP-21 Engineer,
wrong
death, they are inspected and that Permit Site
ladder for 4 3 12 fractures, procedures and control to work 3 2 6 Engineer,
cuts, measures are implemented to COP-23 Hse
the job..
bruises to remove defective or damaged Work at Engineer,
*Placing the ladders from service;
the falling height Forman
ladder on person (iii) ladders are not used near
the edge of an open floor, COP-
soft and/or penetration, or on scaffolding 37.0
uneven to gain extra height;
Ladders
(iv) ladders are not set up in a
ground. I. passageway, doorway,
*A person or driveway or other place where
a person , vehicle or crane
vehicle
lifted load might strike it so as
strikes the to cause instability or its
collapse;
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:5 of 10
Installation

(v) where ladders are set up in


ladder while
a public place appropriate
it’s in use. control measures are
implemented to protect the
public and that ladders are
removed when not in use
even for short periods of time;
(vi) where a ladder is left
unattended signs are provided
warning against unauthorized
use of the ladder;
(vii) tools and materials are
not carried by hand when
climbing ladders, tools and
materials which cannot safely
be secured on the employees
belt are to be independently
transferred or hoisted to the
work location;
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:6 of 10
Installation

1. Approved method COP-04


Hand arm statement must be in place First Project
vibration, prior to start the work aid, Engineer,
vibration activity. Site
2. All equipment over 85dba COP-02 Engineer,
white
(hard to hear others >1m PPE Hse
finger normal voice) must ensure use, Engineer,
(vwf), that operatives and others Forman
Use of wruld’s wear ear plugs, over 90dba COP-21
Power tools Exposure to ear muffs/defenders. Permit 3 2 6
(drills, Employe Vibration, 4 3 12 high to work,
4 concrete es , Electric levels of 3. If breaking into walls or
Breakers visitors shock noise can floors ensure cable detection COP-15
Grinders Noise cause per is carried out prior to break. electric
manent 4.Survey existing drawings hazard,
hearing for cable runs and pipe
loss. work. Identification of COP
services carried out live or 35-
dead. portable
5. Permit to work issued for power
activity, with isolations/lock tools
offs to existing services
carried out.
6. If tool has high vibration
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:7 of 10
Installation

factor in hz scale, assess


duration of activity, and
rotation of job to prevent
prolonged use.
7. Exposure assessments
required, and health
surveillance.
8. If short term exposure
every few minutes reduction
must be achieved, and short
breaks frequently taken,
Suitable PPE worn
including padded gloves
specific for vwfs.
Compressors must be
maintained and receive
thorough examination
9. Ear plugs should be
provided
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:8 of 10
Installation

Storage COP-04
and First Project
Storage and disposal of aid, Engineer,
Waste Employe various Site
disposal of
Management es , categories .Routine inspections will COP-02 Engineer,
5 (construction visitors various of waste be performed. PPE Hse
waste and categories of Ground The site shall undergo a use, 2 1 2 Engineer,
domestic waste 2 2 4 and water daily cleanup process Forman
waste – Incorrect contaminati COP-21
storage, disposal on Permit
Handling) to work
COP
54.0

1. Spread 1. Housekeeping to be COP-04


Housekeepin Employe No proper of maintained at an acceptable First
6 g es , housekeepin diseases. level on a daily basis. aid,
visitors 2. Combustible which
g 2. Damage
present a fire risk shall not COP-02 Project
Slip and trip to be permitted in construction PPE Engineer,
Biological property. site. COP Site
hazards 2 4 8 3. Fire 3. Area supervisors are 54.0 1 2 2 Engineer,
hazards accountable for waste Hse
housekeeping in their area manage Engineer,
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:9 of 10
Installation

of responsibility. ment Forman


4. Machinery must be
maintained at regular
internal.
5. Material shall be properly
& orderly stacked.
6. Access or walkways must
be free from obstructions.

Personals involved in the preparation of the Risk assessment and method of statement
Jihul George HSE Engineer

Latheef. K Project Engineer


Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:10 of 10
Installation

(likely hood= l) (severity =s)

Insignificant (1) Minor (2) Moderate (3) Major(4) Catastrophic (5)


Rare (1) 1 2 3 4 5
Possible (2) 2 4 6 8 10
Likely (3) 3 6 9 12 15
Often (4) 4 8 12 16 20
Frequent /almost certain
5 10 15 20 25
(5)
15 – 25 Extreme risk Activity or industry not proceed in current form
Activity or industry should be modified to include remedial planning and action and be subject to
8 – 12 High risk
detailed ehs assessment
4–6 Moderate risk Activity or industry can operate subject to management and or modification
1-3 Low risk No action required, unless escalation of risk is possible