Risk Assessment - Installation of Safety Zone Wolf Area
Risk Assessment - Installation of Safety Zone Wolf Area
COP-04
work- 1. Site engineer/in charge First
related will ensure that all workers aid,
2 Manual musculosk are handling affordable
handling Employe eletal work loads COP-02
disorders
es , 2.proper storage of PPE Project
(MSDs)
visitors such as
materials should proceed for use, Engineer,
pain and safe handling of materials Hse
3 3 9 injuries to 3. Should include the topic COP-21 2 2 4 Engineer,
arms, legs manual handling in Tool Permit Forman
and joints, box talk. to work
and COP-14
repetitive Manual
strain handlin
injuries of g
various
sorts.
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:4 of 10
Installation
Ladders: COP-04
3 Working on *Overreachi . First
ladder for the Employe (i) where ladders or aid,
work of es , ng when stepladders are being used
installing visitors working on a outside they are not used in COP-02
brackets and the event of high winds or PPE
ladder inclement weather;
hotwire use,
installation *Using the Head Project
injury, (ii) before ladders are used COP-21 Engineer,
wrong
death, they are inspected and that Permit Site
ladder for 4 3 12 fractures, procedures and control to work 3 2 6 Engineer,
cuts, measures are implemented to COP-23 Hse
the job..
bruises to remove defective or damaged Work at Engineer,
*Placing the ladders from service;
the falling height Forman
ladder on person (iii) ladders are not used near
the edge of an open floor, COP-
soft and/or penetration, or on scaffolding 37.0
uneven to gain extra height;
Ladders
(iv) ladders are not set up in a
ground. I. passageway, doorway,
*A person or driveway or other place where
a person , vehicle or crane
vehicle
lifted load might strike it so as
strikes the to cause instability or its
collapse;
Rev : 01
LG-EHS/RA-AZ-HPE-007-22 Risk Assessment for
Installation of safety zone for Date: 20/10/2022
Wolf exhibit Hotwire Page:5 of 10
Installation
Storage COP-04
and First Project
Storage and disposal of aid, Engineer,
Waste Employe various Site
disposal of
Management es , categories .Routine inspections will COP-02 Engineer,
5 (construction visitors various of waste be performed. PPE Hse
waste and categories of Ground The site shall undergo a use, 2 1 2 Engineer,
domestic waste 2 2 4 and water daily cleanup process Forman
waste – Incorrect contaminati COP-21
storage, disposal on Permit
Handling) to work
COP
54.0
Personals involved in the preparation of the Risk assessment and method of statement
Jihul George HSE Engineer