0% found this document useful (0 votes)
268 views1 page

Checklist For Podium Waterproofing

The document provides a checklist for podium waterproofing with details on site preparation, waterproofing application steps, and post-waterproofing checks including surface cleaning, application of primer and protective coatings, fiber reinforcement, ponding tests, and screed installation.

Uploaded by

SPCL FKM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
268 views1 page

Checklist For Podium Waterproofing

The document provides a checklist for podium waterproofing with details on site preparation, waterproofing application steps, and post-waterproofing checks including surface cleaning, application of primer and protective coatings, fiber reinforcement, ponding tests, and screed installation.

Uploaded by

SPCL FKM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Waterproofing Works

Checklist For Podium waterproofing


Site Work Activity
CHECKLIST FOR PODIUM WATERPROOFING
Site
Location
Date
Grid & Level
Drawing No.
Refer to the approved relevant drawings
SL.No. Description Details
a Are the Safety norms being covered as per HSEM Process? Yes No NA

b Check for availability of material and methodology for waterproofing Yes No NA


A Prior to Waterproofing
Check for preparation of surface is as per method given in specification like Yes No NA
1
cleaning,dust free dry surface etc.
2 Check for proper lighting arrangements in the waterproofing area Yes No NA

Check for completion of plumbing lines, electrical lines, provision of pipe Yes No NA
3
sleeves , bore packing & finishing of wall chasing
Check for completion of plastering of wall and coving in slab and wall joints Yes No NA
4
as per methodology
Check for rendering of defect identified areas if noted and finishing as per Yes No NA
5
methodology
Check for preponding test prior waterproofing for 24 hrs and ensured no Yes No NA
6
leakages in slab
B During Waterproofing
Yes No NA
7 Check for all surface must be cleaning and free from looser mortar.

Check For all corner with coving with Acrylic Polymer Modified Cementitious Yes No NA
8
SBR Latex waterproofing membrane Cement and sand

Check For Acrylic Polymer Modified Cementitious membrane Magnofix, Yes No NA


9 Polybond, Water (1:3:6) and 8 to 10 Kg Cement will be applied primer
coating.

Check for Protective coating Flexcoat 2K Mix ratio (1:3) is an Acrylic Yes No NA
10
Cementitious Polymer Modified elastomeric.
Check for Main coating Apply of SETIPOL - PU from Teecnopol Modified Yes No NA
11
single components.
Check for apply the first coat, with a consumption of about 0.75 Kg/m2, Yes No NA
12
imprehnating glass fiber reinforcement and let dry.
Check for apply a second layer with an approximate consumption 0.75 - 1 Yes No NA
13
Kg/m2.
14 Check for applying uniformly with brush / roller Yes No NA
C After Waterproofing
Check for protection of waterproofing by restriction of movement and curing Yes No NA
15
after 24 hrs of final coat
16 Check for post ponding test for 48 hours after waterproofing Yes No NA

17 Check for laying screed for 30mm above the waterproofing applied area Yes No NA

Check for cleaning and removal of all unwanted materials after completion of No
18 Yes NA
work

Signature : Site Engineer


Observations:
Whether the above points checked and in order? YES NO
Corrective Action Proposed

SPCL - QA/QC Manager / Engineer TRPL